-
1
-
-
0022667867
-
Optimal control of production rate in a failure-prone manufacturing system
-
Feb.
-
R. Akella and P. R. Kumar, "Optimal control of production rate in a failure-prone manufacturing system," IEEE Trans. Automat. Contr., vol. AC-31, pp. 116-126, Feb. 1986.
-
(1986)
IEEE Trans. Automat. Contr.
, vol.AC-31
, pp. 116-126
-
-
Akella, R.1
Kumar, P.R.2
-
2
-
-
0025532680
-
Scheduling manufacturing systems with work-in-process inventory control: Formulation of single-part-type systems
-
Dec.
-
S. X. Bai and S. B. Gershwin, "Scheduling manufacturing systems with work-in-process inventory control: Formulation of single-part-type systems," in Proc. 29th Conf. Decision and Control, vol. 2, Dec. 1990, pp. 557-564.
-
(1990)
Proc. 29th Conf. Decision and Control
, vol.2
, pp. 557-564
-
-
Bai, S.X.1
Gershwin, S.B.2
-
3
-
-
0028374441
-
Scheduling manufacturing systems with work-in-process inventory control: Multiple-part-type systems
-
____, "Scheduling manufacturing systems with work-in-process inventory control: Multiple-part-type systems," Int. J. Prod. Res., vol. 32, no. 2, pp. 365-386, 1994.
-
(1994)
Int. J. Prod. Res.
, vol.32
, Issue.2
, pp. 365-386
-
-
Bai, S.X.1
Gershwin, S.B.2
-
4
-
-
0024037430
-
Optimality of zero-inventory policies for unreliable manufacturing systems
-
T. Bielecki and P. R. Kumar, "Optimality of zero-inventory policies for unreliable manufacturing systems," Oper. Res., vol. 36, no. 4, pp. 532-541, 1988.
-
(1988)
Oper. Res.
, vol.36
, Issue.4
, pp. 532-541
-
-
Bielecki, T.1
Kumar, P.R.2
-
6
-
-
0023981046
-
The role of work-in-process inventory in serial production lines
-
R. Conway, W. Maxwell, J. O. McClain, and L. J. Thomas, "The role of work-in-process inventory in serial production lines," Oper. Res., vol. 36, no. 2, pp. 229-241, 1988.
-
(1988)
Oper. Res.
, vol.36
, Issue.2
, pp. 229-241
-
-
Conway, R.1
Maxwell, W.2
McClain, J.O.3
Thomas, L.J.4
-
7
-
-
0028416608
-
Production planning and scheduling using a fuzzy decision system
-
Apr.
-
L. Custodio, J. Senteiro, and C. Bispo, "Production planning and scheduling using a fuzzy decision system," IEEE Trans. Robot. Automat., vol. 10, pp. 160-168, Apr. 1994.
-
(1994)
IEEE Trans. Robot. Automat.
, vol.10
, pp. 160-168
-
-
Custodio, L.1
Senteiro, J.2
Bispo, C.3
-
8
-
-
0034466408
-
Extended Kanban control system: Combining Kanban and base stock
-
Y. Dallery and G. Liberopoulos, "Extended Kanban control system: Combining Kanban and base stock," IIE Trans. Des. Manufact., vol. 32, no. 4, pp. 369-386, 2000.
-
(2000)
IIE Trans. Des. Manufact.
, vol.32
, Issue.4
, pp. 369-386
-
-
Dallery, Y.1
Liberopoulos, G.2
-
9
-
-
2942728204
-
Distributed intelligent control of unreliable manufacturing systems
-
Athens, Greece: World Sci. and Eng. Soc. Press, July
-
E. Dretoulakis, S. Ioannidis, and N. C. Tsourveloudis, "Distributed intelligent control of unreliable manufacturing systems," in Computational Intelligence and Applications. Athens, Greece: World Sci. and Eng. Soc. Press, July 1999, pp. 267-271.
-
(1999)
Computational Intelligence and Applications
, pp. 267-271
-
-
Dretoulakis, E.1
Ioannidis, S.2
Tsourveloudis, N.C.3
-
12
-
-
0034288452
-
Design and operation of manufacturing systems: The control-point policy
-
____, "Design and operation of manufacturing systems: The control-point policy," IIE Trans., vol. 32, pp. 891-906, 2000.
-
(2000)
IIE Trans.
, vol.32
, pp. 891-906
-
-
Gershwin, S.B.1
-
14
-
-
0024765326
-
A robust production control policy for VLSI wafer fabrication
-
Nov.
-
S. X. C. Lou and P. Kager, "A robust production control policy for VLSI wafer fabrication," IEEE Trans. Semiconduct. Manufact., vol. 2, pp. 159-164, Nov. 1989.
-
(1989)
IEEE Trans. Semiconduct. Manufact.
, vol.2
, pp. 159-164
-
-
Lou, S.X.C.1
Kager, P.2
-
15
-
-
0028392099
-
Optimal feedback production planning in a stochastic two-machine flowshop
-
S. X. C. Lou, S. P. Sethi, and Q. Zhang, "Optimal feedback production planning in a stochastic two-machine flowshop," Eur. J. Oper. Res., vol. 73, pp. 331-345, 1994.
-
(1994)
Eur. J. Oper. Res.
, vol.73
, pp. 331-345
-
-
Lou, S.X.C.1
Sethi, S.P.2
Zhang, Q.3
-
16
-
-
0001744740
-
Optimal control rules for scheduling job shops
-
S. X. C. Lou and G. Van Ryzin, "Optimal control rules for scheduling job shops," Ann. Oper. Res., vol. 17, pp. 233-248, 1989.
-
(1989)
Ann. Oper. Res.
, vol.17
, pp. 233-248
-
-
Lou, S.X.C.1
Van Ryzin, G.2
-
18
-
-
0004023296
-
Synthesis of optimal policies for stochastic manufacturing systems
-
Ph.D. dissertation, Oper. Res. Center, Mass. Inst. Technol., Cambridge, MA
-
N. Srivatsan, "Synthesis of optimal policies for stochastic manufacturing systems," Ph.D. dissertation, Oper. Res. Center, Mass. Inst. Technol., Cambridge, MA, 1993.
-
(1993)
-
-
Srivatsan, N.1
-
19
-
-
0344858917
-
Fuzzy work-in-process inventory control of unreliable manufacturing systems
-
N. C. Tsourveloudis, E. Dretoulakis, and S. Ioannidis, "Fuzzy work-in-process inventory control of unreliable manufacturing systems," Information Sci., vol. 127, pp. 69-83, 2000.
-
(2000)
Information Sci.
, vol.127
, pp. 69-83
-
-
Tsourveloudis, N.C.1
Dretoulakis, E.2
Ioannidis, S.3
-
20
-
-
0027666614
-
Production control for a tandem two-machine system
-
G. J. Van Ryzin, S. X. C. Lou, and S. B. Gershwin, "Production control for a tandem two-machine system," IIE Trans., vol. 25, no. 5, pp. 5-20, 1993.
-
(1993)
IIE Trans.
, vol.25
, Issue.5
, pp. 5-20
-
-
Van Ryzin, G.J.1
Lou, S.X.C.2
Gershwin, S.B.3
-
21
-
-
0024055865
-
Scheduling semiconductor wafer fabrication
-
Aug.
-
L. Wein, "Scheduling semiconductor wafer fabrication," IEEE Trans. Semiconduct. Manufact., vol. 1, pp. 115-130, Aug. 1988.
-
(1988)
IEEE Trans. Semiconduct. Manufact.
, vol.1
, pp. 115-130
-
-
Wein, L.1
-
23
-
-
0030150598
-
Testing the robustness of two-boundary control policies in semiconductor manufacturing
-
May
-
H. Yan, S. X. C. Lou, S. P. Sethi, A. Gardel, and P. Deosthali, "Testing the robustness of two-boundary control policies in semiconductor manufacturing," IEEE Trans. Semiconduct. Manufact., vol. 9, pp. 285-288, May 1996.
-
(1996)
IEEE Trans. Semiconduct. Manufact.
, vol.9
, pp. 285-288
-
-
Yan, H.1
Lou, S.X.C.2
Sethi, S.P.3
Gardel, A.4
Deosthali, P.5
|