-
1
-
-
34548513879
-
-
in Chinese
-
-
-
-
2
-
-
0035719796
-
An integrated greedy heuristic for a flexible job shop scheduling problem
-
Piscataway, NJ, USA, IEEE
-
MATI Y, REZG N, XIE X L. An integrated greedy heuristic for a flexible job shop scheduling problem[C]//The Proceedings of IEEE International Conference on Systems, Man, and Cybernetics. Piscataway, NJ, USA, IEEE, 2001: 2534-2539.
-
(2001)
The Proceedings of IEEE International Conference on Systems, Man, and Cybernetics
, pp. 2534-2539
-
-
Mati, Y.1
Rezg, N.2
Xie, X.L.3
-
3
-
-
34548492867
-
-
in Chinese
-
-
-
-
4
-
-
0030241820
-
Multi-objective genetic algorithm and its application to flowshop scheduling
-
TADAHIKO M, HISAO ISHIBUCHI, HIDEO T. Multi-objective genetic algorithm and its application to flowshop scheduling[J]. Computers and Engineering, 1996, 30(4): 957-968.
-
(1996)
Computers and Engineering
, vol.30
, Issue.4
, pp. 957-968
-
-
Tadahiko, M.1
Ishibuchi, H.2
Hideo, T.3
-
5
-
-
0022128589
-
Lot-sizing in multi-item multi-machine job shops
-
KARMARKAR U S, KEKRE S. Lot-sizing in multi-item multi-machine job shops[J]. IIE Transactions, 1985, 17: 290-298.
-
(1985)
IIE Transactions
, vol.17
, pp. 290-298
-
-
Karmarkar, U.S.1
Kekre, S.2
-
6
-
-
0033226070
-
Workshop scheduling using practical (inaccurate) data. Part 1: The performance of heuristic scheduling rules in a dynamic job shop environment using a rolling time horizon approach
-
SHAFAEI R, BRUNN P. Workshop scheduling using practical (inaccurate) data Part 1: the performance of heuristic scheduling rules in a dynamic job shop environment using a rolling time horizon approach[J]. Int. J. Prod. Res., 1999, 37(17): 3913-3925.
-
(1999)
Int. J. Prod. Res.
, vol.37
, Issue.17
, pp. 3913-3925
-
-
Shafaei, R.1
Brunn, P.2
-
7
-
-
0033355662
-
Workshop scheduling using practical (inaccurate) data. Part 2: An investigation of the robustness of scheduling rules in a dynamic and stochastic environment
-
SHAFAEI R, BRUNN P. Workshop scheduling using practical (inaccurate) data Part 2: an investigation of the robustness of scheduling rules in a dynamic and stochastic environment[J]. Int. J. Prod. Res., 1999, 37(18): 4105-4117.
-
(1999)
Int. J. Prod. Res.
, vol.37
, Issue.18
, pp. 4105-4117
-
-
Shafaei, R.1
Brunn, P.2
-
8
-
-
34548514347
-
-
in Chinese
-
-
-
-
9
-
-
0029535737
-
Particle swarm optimization
-
IV, Piscataway, NJ: IEEE Service Center
-
KENNEDY J, EBERHART R C. Particle swarm optimization[C]//Proc. IEEE International Conference on Neural Networks, IV, Piscataway, NJ: IEEE Service Center, 1995: 1942-1948.
-
(1995)
Proc. IEEE International Conference on Neural Networks
, pp. 1942-1948
-
-
Kennedy, J.1
Eberhart, R.C.2
-
10
-
-
34548515633
-
-
in Chinese
-
-
-
-
11
-
-
3142756516
-
Handing multiple objectives with particle swarm optimization
-
CARLOS A C, GREGORIO T P, MAXIMINO S L. Handing multiple objectives with particle swarm optimization[J]. IEEE Transaction on Evolutionary Computation, 2004, 8(3): 256-279.
-
(2004)
IEEE Transaction on Evolutionary Computation
, vol.8
, Issue.3
, pp. 256-279
-
-
Carlos, A.C.1
Gregorio, T.P.2
Maximino, S.L.3
-
13
-
-
0030242695
-
A tutorial survey of job shop scheduling problems using genetic algorithms. Part 1: Representation
-
RUNWEI C, MISTUO G, YASUHIRO T. A tutorial survey of job shop scheduling problems using genetic algorithms, part 1: representation[J]. Computers Industry Engineering, 1996, 30(4): 983-997.
-
(1996)
Computers Industry Engineering
, vol.30
, Issue.4
, pp. 983-997
-
-
Runwei, C.1
Mistuo, G.2
Yasuhiro, T.3
-
14
-
-
0029770205
-
Hashing-coding in CMAC neural networks
-
WANG Ziqin, SCHIAO Jeffrey L, MARK Ginsberg. Hashing-coding in CMAC Neural Networks[J]. IEEE Transactions on Neural Network, 1996, 17(5): 1698-1703.
-
(1996)
IEEE Transactions on Neural Network
, vol.17
, Issue.5
, pp. 1698-1703
-
-
Wang, Z.1
Schiao, J.L.2
Mark, G.3
-
15
-
-
34548493578
-
-
in Chinese
-
-
-
-
16
-
-
34548474183
-
-
in Chinese
-
-
-
-
17
-
-
0037201140
-
Pareto-optimality approach for flexible job scheduling problems: Hybridization of evolutionary algorithms and fuzzy logic
-
KACEM I, HAMMADI S, BORNE P. Pareto-optimality approach for flexible job scheduling problems: hybridization of evolutionary algorithms and fuzzy logic[J]. Mathematics and Computers in Simulation, 2002, 60(3-5): 245-276.
-
(2002)
Mathematics and Computers in Simulation
, vol.60
, Issue.3-5
, pp. 245-279
-
-
Kacem, I.1
Hammadi, S.2
Borne, P.3
|