메뉴 건너뛰기




Volumn 43, Issue 8, 2007, Pages 148-154

Multi-objective flexible job shop scheduling of batch production

Author keywords

Batch production; Evolutionary algorithm; Flexible job shop scheduling; Multi objective optimization

Indexed keywords

COMPUTER SIMULATION; COSTS; EVOLUTIONARY ALGORITHMS; GENETIC ALGORITHMS; MACHINE SHOPS; MACHINE TOOLS; MATHEMATICAL MODELS; MULTIOBJECTIVE OPTIMIZATION; PRODUCTION; SCHEDULING;

EID: 34548480960     PISSN: 05776686     EISSN: None     Source Type: Journal    
DOI: 10.3901/JME.2007.08.148     Document Type: Article
Times cited : (38)

References (17)
  • 1
    • 34548513879 scopus 로고    scopus 로고
    • in Chinese
  • 3
    • 34548492867 scopus 로고    scopus 로고
    • in Chinese
  • 4
    • 0030241820 scopus 로고    scopus 로고
    • Multi-objective genetic algorithm and its application to flowshop scheduling
    • TADAHIKO M, HISAO ISHIBUCHI, HIDEO T. Multi-objective genetic algorithm and its application to flowshop scheduling[J]. Computers and Engineering, 1996, 30(4): 957-968.
    • (1996) Computers and Engineering , vol.30 , Issue.4 , pp. 957-968
    • Tadahiko, M.1    Ishibuchi, H.2    Hideo, T.3
  • 5
    • 0022128589 scopus 로고
    • Lot-sizing in multi-item multi-machine job shops
    • KARMARKAR U S, KEKRE S. Lot-sizing in multi-item multi-machine job shops[J]. IIE Transactions, 1985, 17: 290-298.
    • (1985) IIE Transactions , vol.17 , pp. 290-298
    • Karmarkar, U.S.1    Kekre, S.2
  • 6
    • 0033226070 scopus 로고    scopus 로고
    • Workshop scheduling using practical (inaccurate) data. Part 1: The performance of heuristic scheduling rules in a dynamic job shop environment using a rolling time horizon approach
    • SHAFAEI R, BRUNN P. Workshop scheduling using practical (inaccurate) data Part 1: the performance of heuristic scheduling rules in a dynamic job shop environment using a rolling time horizon approach[J]. Int. J. Prod. Res., 1999, 37(17): 3913-3925.
    • (1999) Int. J. Prod. Res. , vol.37 , Issue.17 , pp. 3913-3925
    • Shafaei, R.1    Brunn, P.2
  • 7
    • 0033355662 scopus 로고    scopus 로고
    • Workshop scheduling using practical (inaccurate) data. Part 2: An investigation of the robustness of scheduling rules in a dynamic and stochastic environment
    • SHAFAEI R, BRUNN P. Workshop scheduling using practical (inaccurate) data Part 2: an investigation of the robustness of scheduling rules in a dynamic and stochastic environment[J]. Int. J. Prod. Res., 1999, 37(18): 4105-4117.
    • (1999) Int. J. Prod. Res. , vol.37 , Issue.18 , pp. 4105-4117
    • Shafaei, R.1    Brunn, P.2
  • 8
    • 34548514347 scopus 로고    scopus 로고
    • in Chinese
  • 10
    • 34548515633 scopus 로고    scopus 로고
    • in Chinese
  • 13
    • 0030242695 scopus 로고    scopus 로고
    • A tutorial survey of job shop scheduling problems using genetic algorithms. Part 1: Representation
    • RUNWEI C, MISTUO G, YASUHIRO T. A tutorial survey of job shop scheduling problems using genetic algorithms, part 1: representation[J]. Computers Industry Engineering, 1996, 30(4): 983-997.
    • (1996) Computers Industry Engineering , vol.30 , Issue.4 , pp. 983-997
    • Runwei, C.1    Mistuo, G.2    Yasuhiro, T.3
  • 15
    • 34548493578 scopus 로고    scopus 로고
    • in Chinese
  • 16
    • 34548474183 scopus 로고    scopus 로고
    • in Chinese
  • 17
    • 0037201140 scopus 로고    scopus 로고
    • Pareto-optimality approach for flexible job scheduling problems: Hybridization of evolutionary algorithms and fuzzy logic
    • KACEM I, HAMMADI S, BORNE P. Pareto-optimality approach for flexible job scheduling problems: hybridization of evolutionary algorithms and fuzzy logic[J]. Mathematics and Computers in Simulation, 2002, 60(3-5): 245-276.
    • (2002) Mathematics and Computers in Simulation , vol.60 , Issue.3-5 , pp. 245-279
    • Kacem, I.1    Hammadi, S.2    Borne, P.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.