-
1
-
-
0017539437
-
Pre-estimate cash flow analysis
-
Ashley, D. B. & Teicholz, P. M. (1977), Pre-estimate cash flow analysis, Journal of Construction Division ASCE, 102(3), 369-79.
-
(1977)
Journal of Construction Division ASCE
, vol.102
, Issue.3
, pp. 369-379
-
-
Ashley, D.B.1
Teicholz, P.M.2
-
2
-
-
0345325959
-
-
MSc in Construction Management Project Report, Loughborough University of Technology, UK
-
Allsop, P. (1980), Cash Flow and Resource Aggregation from Estimator's Data, MSc in Construction Management Project Report, Loughborough University of Technology, UK.
-
(1980)
Cash Flow and Resource Aggregation from Estimator's Data
-
-
Allsop, P.1
-
5
-
-
0004059963
-
-
2nd edn., CSTRO, Division of Building Research Special Report, Australia
-
Bromilow, F. J. & Henderson, J. A. (1974), Procedures for Reckoning the Performance of Building Contracts, 2nd edn., CSTRO, Division of Building Research Special Report, Australia.
-
(1974)
Procedures for Reckoning the Performance of Building Contracts
-
-
Bromilow, F.J.1
Henderson, J.A.2
-
6
-
-
84992947897
-
Modelling cost-flow forecasting for water pipeline projects using neural network
-
Boussabaine, A. H., Thomas, R. & Elhag, T. (1999), Modelling cost-flow forecasting for water pipeline projects using neural network, Engineering, Construction and Architectural Management, 6/3, 213-24.
-
(1999)
Engineering, Construction and Architectural Management
, vol.6
, Issue.3
, pp. 213-224
-
-
Boussabaine, A.H.1
Thomas, R.2
Elhag, T.3
-
8
-
-
12444289001
-
A mathematical model for expenditure forecasting post contract
-
in Technion Israel Institute of Technology, Haifa, Israel
-
Drake, B. E. (1978), A mathematical model for expenditure forecasting post contract, in Proceedings of the Second International Symposium on Organisation and Management of Construction, Technion Israel Institute of Technology, Haifa, Israel, 163-83.
-
(1978)
Proceedings of the Second International Symposium on Organisation and Management of Construction
, pp. 163-183
-
-
Drake, B.E.1
-
9
-
-
0000551904
-
The accuracy and monitoring of quantity surveyors' price forecasting for building work
-
Flanagan, R. & Norman, G. (1983), The accuracy and monitoring of quantity surveyors' price forecasting for building work, Construction Management and Economics, 1(2), 157-180.
-
(1983)
Construction Management and Economics
, vol.1
, Issue.2
, pp. 157-180
-
-
Flanagan, R.1
Norman, G.2
-
10
-
-
0003293418
-
On the nature of the function expressive of the law of human mortality
-
Gompertz, B. (1825), On the nature of the function expressive of the law of human mortality, Philosophical Transactions of the Royal Society, Xxxvi, 513-85.
-
(1825)
Philosophical Transactions of the Royal Society
, vol.36
, pp. 513-585
-
-
Gompertz, B.1
-
11
-
-
34548272786
-
-
Value in Building Economics and Construction Management, Sydney, Australia
-
Gunner, J. & Betts, M. (1990), Price forecasting performance by design team consultants in the Pacific Rim, CIB W-55/65 Symposium, Value in Building Economics and Construction Management, 3, Sydney, Australia.
-
(1990)
Price Forecasting Performance By Design Team Consultants in the Pacific Rim, CIB W-55/65 Symposium
, vol.3
-
-
Gunner, J.1
Betts, M.2
-
12
-
-
12444310708
-
-
MSc report, Department of Civil Engineering, Loughborough University of Technology
-
Hardy, J. V. (1970), Cash flow forecasting for the construction industry, MSc report, Department of Civil Engineering, Loughborough University of Technology.
-
(1970)
Cash Flow Forecasting for the Construction Industry
-
-
Hardy, J.V.1
-
13
-
-
0004153943
-
-
4th edn., Cambridge, Blackwell Science, UK
-
Harris, F. & McCaffer, R. (1995), Modern Construction Management, 4th edn., Cambridge, Blackwell Science, UK.
-
(1995)
Modern Construction Management
-
-
Harris, F.1
McCaffer, R.2
-
15
-
-
0001845897
-
The role of managerial actions in the cost performance of high rise commercial building
-
Ireland, V. (1985), The role of managerial actions in the cost performance of high rise commercial building, Construction Management and Economics, 3, 59-87.
-
(1985)
Construction Management and Economics
, vol.3
, pp. 59-87
-
-
Ireland, V.1
-
16
-
-
26644460773
-
Financial control of construction and reducing the element of risk
-
Jepson, W. B. (1969), Financial control of construction and reducing the element of risk, Contract Journal, 24, 8620-864.
-
(1969)
Contract Journal
, vol.24
, pp. 8620-8864
-
-
Jepson, W.B.1
-
18
-
-
0344463113
-
Modelling standard cost commitment curves for contractors' cash flow forecasting
-
Kaka, A. P. & Price, A. D. F. (1993), Modelling standard cost commitment curves for contractors' cash flow forecasting, Construction Management and Economics, 11, 271-83.
-
(1993)
Construction Management and Economics
, vol.11
, pp. 271-283
-
-
Kaka, A.P.1
Price, A.D.F.2
-
19
-
-
84993030449
-
Effects of different procurement routes on contractors' cash flow
-
Kaka, A. P. & Khosrowshahi, F. (1996), Effects of different procurement routes on contractors' cash flow, Engineering, Construction and Architectural Management, 3, 133-45.
-
(1996)
Engineering, Construction and Architectural Management
, vol.3
, pp. 133-145
-
-
Kaka, A.P.1
Khosrowshahi, F.2
-
20
-
-
84992975036
-
Analysis of the accuracy of standard/average value curves using food retail building projects as case studies
-
Kaka, A. P. & Evans, R. C. (1998), Analysis of the accuracy of standard/average value curves using food retail building projects as case studies, Engineering, Construction and Architectural Management, 5, 58-67.
-
(1998)
Engineering, Construction and Architectural Management
, vol.5
, pp. 58-67
-
-
Kaka, A.P.1
Evans, R.C.2
-
21
-
-
0345415608
-
Development of a company-level dynamic cash flow forecasting model (DYCAFF)
-
Kaka, A. P. & Lewis, J. (2003), Development of a company-level dynamic cash flow forecasting model (DYCAFF), Construction Management and Economics, 21(7), 693-705.
-
(2003)
Construction Management and Economics
, vol.21
, Issue.7
, pp. 693-705
-
-
Kaka, A.P.1
Lewis, J.2
-
22
-
-
0021475540
-
Forecasting expenditure on capital projects
-
Keller, A. Z., Green, F. & Ashrafi (1984), Forecasting expenditure on capital projects, Long Range Planning, 17(4), 110-14.
-
(1984)
Long Range Planning
, vol.17
, Issue.4
, pp. 110-114
-
-
Keller, A.Z.1
Green, F.2
Ashrafi3
-
23
-
-
0006767477
-
A construction project cash flow model - An idiographic approach
-
Kenley, R. & Wilson, I. D. (1986), A construction project cash flow model - an idiographic approach, Construction Management and Economics, 4, 213-32.
-
(1986)
Construction Management and Economics
, vol.4
, pp. 213-232
-
-
Kenley, R.1
Wilson, I.D.2
-
25
-
-
0042123819
-
A model for smoothing time series data in construction
-
Khosrowshahi, F. & Alani, A. (2003), A model for smoothing time series data in construction, Construction Management and Economics, 21, 483-94.
-
(2003)
Construction Management and Economics
, vol.21
, pp. 483-494
-
-
Khosrowshahi, F.1
Alani, A.2
-
26
-
-
84992973460
-
Multi-project cash flow optimization: Non-inferior solution through neuro-multiobjective algorithm
-
Lam, K. C., Hu, T., Cheung, S. O., Yuen, R. K. K. & Deng, Z. M. (2001), Multi-project cash flow optimization: Non-inferior solution through neuro-multiobjective algorithm, Engineering, Construction and Architectural Management, 8(2), 130-44.
-
(2001)
Construction and Architectural Management
, vol.8
, Issue.2
, pp. 130-144
-
-
Lam, K.C.1
Hu, T.2
Cheung, S.O.3
Yuen, R.K.K.4
Deng, Z.M.5
-
27
-
-
0642282381
-
Cash flow management: An expert system for the construction client
-
Lowe, J. G., Moussa, N. & Lowe, H. C. (1993), Cash flow management: an expert system for the construction client, Journal of Applied Expert Systems, 1(2), 134-52.
-
(1993)
Journal of Applied Expert Systems
, vol.1
, Issue.2
, pp. 134-152
-
-
Lowe, J.G.1
Moussa, N.2
Lowe, H.C.3
-
30
-
-
18444389156
-
Modelling the dynamics of an infrastructure project
-
Nguyen, L. D. & Ogunlana, S. O. (2005), Modelling the dynamics of an infrastructure project, Computer-Aided Civil and Infrastructure Engineering, 20, 265-79.
-
(2005)
Computer-Aided Civil and Infrastructure Engineering
, vol.20
, pp. 265-279
-
-
Nguyen, L.D.1
Ogunlana, S.O.2
-
32
-
-
0024091479
-
Factors affecting the accuracy of engineers' estimates
-
Skitmore, M. (1988), Factors affecting the accuracy of engineers' estimates, Cost Engineering, 30(10), 16-23.
-
(1988)
Cost Engineering
, vol.30
, Issue.10
, pp. 16-23
-
-
Skitmore, M.1
-
35
-
-
0039280214
-
Formulating construction cash-flow curves using a reliability theory analogy
-
Tucker, S. N. (1986), Formulating construction cash-flow curves using a reliability theory analogy, Construction Management and Economics, 4(3), 179-88.
-
(1986)
Construction Management and Economics
, vol.4
, Issue.3
, pp. 179-188
-
-
Tucker, S.N.1
-
36
-
-
33645992444
-
Multimode project scheduling based on particle swarm optimization
-
Zhang, H., Tam, C. M. & Li, H. (2006), Multimode project scheduling based on particle swarm optimization, Computer-Aided Civil and Infrastructure Engineering, 21(2), 93.
-
(2006)
Computer-Aided Civil and Infrastructure Engineering
, vol.21
, Issue.2
, pp. 93
-
-
Zhang, H.1
Tam, C.M.2
Li, H.3
|