메뉴 건너뛰기




Volumn 5, Issue 1, 1998, Pages 58-67

Analysis of the accuracy of standard/average value curves using food retail building projects as case studies

Author keywords

Cash flow forecasting; Food retail superstores; Logit transformation; S curves; Value curves

Indexed keywords


EID: 84992975036     PISSN: 09699988     EISSN: None     Source Type: Journal    
DOI: 10.1108/eb021061     Document Type: Review
Times cited : (17)

References (16)
  • 1
    • 0003805429 scopus 로고
    • Griffin's Statistical Monographs and Causes No. 32, Griffin, London
    • Ashton, W.D. (1972) The Logit Transformation. Griffin's Statistical Monographs and Causes No. 32, Griffin, London.
    • (1972) The Logit Transformation
    • Ashton, W.D.1
  • 2
    • 0040464928 scopus 로고
    • Project management control using real time budgeting and forecasting models
    • Berney, J. & Howes, R. (1983) Project management control using real time budgeting and forecasting models. CIOB, Construction Paper, 2, 19–40.
    • (1983) CIOB, Construction Paper , vol.2 , pp. 19-40
    • Berney, J.1    Howes, R.2
  • 5
    • 12444310708 scopus 로고
    • M.Sc. Thesis, Department of Civil Engineering, Loughborough University of Technology, Loughborough
    • Hardy, J.V. (1970) Cash flow forecasting for the construction industry. M.Sc. Thesis, Department of Civil Engineering, Loughborough University of Technology, Loughborough.
    • (1970) Cash flow forecasting for the construction industry
    • Hardy, J.V.1
  • 7
    • 26644460773 scopus 로고
    • Financial control of construction and reducing the element of risk
    • 24 April
    • Jepson, W.B. (1969) Financial control of construction and reducing the element of risk. Contract Journal, 24 April, 862–864.
    • (1969) Contract Journal , pp. 862-864
    • Jepson, W.B.1
  • 8
    • 12444279502 scopus 로고
    • Ph.D. Thesis, Department of Civil Engineering, Loughborough University of Technology, Loughborough
    • Kaka, A.P. (1990) Corporate financial model for construction contractors. Ph.D. Thesis, Department of Civil Engineering, Loughborough University of Technology, Loughborough.
    • (1990) Corporate financial model for construction contractors
    • Kaka, A.P.1
  • 10
    • 0344463113 scopus 로고
    • Modelling standard cost commitment curves for contractors cash flow
    • Kaka, A.P. & Price, A.D.F. (1993) Modelling standard cost commitment curves for contractors cash flow. Construction Management and Economics, 11, 271–283.
    • (1993) Construction Management and Economics , vol.11 , pp. 271-283
    • Kaka, A.P.1    Price, A.D.F.2
  • 12
    • 0041059064 scopus 로고
    • Simulation of expensive patterns of construction projects
    • Khosrowshahi, F. (1991) Simulation of expensive patterns of construction projects. Construction Management and Economics, 9, 113–32.
    • (1991) Construction Management and Economics , vol.9 , pp. 113-132
    • Khosrowshahi, F.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.