Volumn 19, Issue 3, 2004, Pages 1562-1568

Modeling of start-up and shut-down power trajectories of thermal units

Author keywords

[No Author keywords available]

Indexed keywords

CONSTRAINT THEORY; ELECTRIC POWER GENERATION; INTEGER PROGRAMMING; MATHEMATICAL MODELS; PLANT SHUTDOWNS; PLANT STARTUP; SCHEDULING; THERMOELECTRIC POWER PLANTS;

EID: 4043136473     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRS.2004.831654     Document Type: Article
Times cited : (144)

References (17)
  • 2
    • 0027647348 scopus 로고
    • Effects of ramp-rate limits on unit commitment and economic dispatch
    • Aug
    • C. Wang and S. M. Shahidehpour, "Effects of ramp-rate limits on unit commitment and economic dispatch," IEEE Trans. Power Syst., vol. 8, pp. 1341-1350, Aug. 1993.
    • (1993) IEEE Trans. Power Syst. , vol.8 , pp. 1341-1350
    • Wang, C.1    Shahidehpour, S.M.2
  • 3
    • 0028480910 scopus 로고
    • Price-based ramp-rate model for dynamic dispatch and unit commitment
    • Aug
    • F. N. Lee, L. Lemonidis, and K.-C. Li, "Price-based ramp-rate model for dynamic dispatch and unit commitment," IEEE Trans. Power Syst., vol. 9, pp. 1233-1241, Aug. 1994.
    • (1994) IEEE Trans. Power Syst. , vol.9 , pp. 1233-1241
    • Lee, F.N.1    Lemonidis, L.2    Li, K.-C.3
  • 4
    • 0028480021 scopus 로고
    • Ramp-rate limits in unit commitment and economic dispatch incorporating rotor fatigue effect
    • Aug
    • C. Wang and S. M. Shahidehpour, "Ramp-rate limits in unit commitment and economic dispatch incorporating rotor fatigue effect," IEEE Trans. Power Syst., vol. 9, pp. 1539-1545, Aug. 1994.
    • (1994) IEEE Trans. Power Syst. , vol.9 , pp. 1539-1545
    • Wang, C.1    Shahidehpour, S.M.2
  • 5
    • 0029253063 scopus 로고
    • Optimal generation scheduling with ramping costs
    • Feb
    • C. Wang, "Optimal generation scheduling with ramping costs," IEEE Trans. Power Syst., vol. 10, pp. 60-67, Feb. 1995.
    • (1995) IEEE Trans. Power Syst. , vol.10 , pp. 60-67
    • Wang, C.1
  • 6
    • 0029307071 scopus 로고
    • A capacity based lagrangian relaxation unit commitment with ramp rate constraints
    • May
    • W. L. Peterson and S. R. Brammer, "A capacity based lagrangian relaxation unit commitment with ramp rate constraints," IEEE Trans. Power Syst., vol. 10, pp. 1077-1084, May 1995.
    • (1995) IEEE Trans. Power Syst. , vol.10 , pp. 1077-1084
    • Peterson, W.L.1    Brammer, S.R.2
  • 7
    • 0031076834 scopus 로고    scopus 로고
    • Short-term resource scheduling with ramp constraints
    • Feb
    • A. J. Svoboda, C.-L. Tseng, C.-A. Li, and R. B. Johnson, "Short-term resource scheduling with ramp constraints," IEEE Trans. Power Syst., vol. 12, no. 1, pp. 77-83, Feb. 1997.
    • (1997) IEEE Trans. Power Syst. , vol.12 , Issue.1 , pp. 77-83
    • Svoboda, A.J.1    Tseng, C.-L.2    Li, C.-A.3    Johnson, R.B.4
  • 8
    • 0033079910 scopus 로고    scopus 로고
    • Unit commitment with ramp multipliers
    • Feb
    • S.-Y. Lai and R. Baldick, "Unit commitment with ramp multipliers," IEEE Trans. Power Syst., vol. 14, pp. 58-64, Feb. 1999.
    • (1999) IEEE Trans. Power Syst. , vol.14 , pp. 58-64
    • Lai, S.-Y.1    Baldick, R.2
  • 10
    • 0034244118 scopus 로고    scopus 로고
    • Optimal response of a thermal unit to an electricity spot market
    • Aug
    • J. M. Arroyo and A. J. Conejo, "Optimal response of a thermal unit to an electricity spot market," IEEE Trans. Power Syst., vol. 15, pp. 1098-1104, Aug. 2000.
    • (2000) IEEE Trans. Power Syst. , vol.15 , pp. 1098-1104
    • Arroyo, J.M.1    Conejo, A.J.2
  • 12
    • 0032679457 scopus 로고    scopus 로고
    • Thermal power generation scheduling by simulated competition
    • May
    • E. S. Huse, I. Wangensteen, and H. H. Faanes, "Thermal power generation scheduling by simulated competition," IEEE Trans. Power Syst., vol. 14, pp. 472-477, May 1999.
    • (1999) IEEE Trans. Power Syst. , vol.14 , pp. 472-477
    • Huse, E.S.1    Wangensteen, I.2    Faanes, H.H.3
  • 13
    • 0018032040 scopus 로고
    • Integer programming approach to the problem of optimal unit commitment with probabilistic reserve determination
    • Nov./Dec
    • T. S. Dillon, K. W. Edwin, H. D. Kochs, and R. J. Tand, "Integer programming approach to the problem of optimal unit commitment with probabilistic reserve determination," IEEE Trans. Power App. Syst., vol. PAS-97, pp. 2154-2166, Nov./Dec. 1978.
    • (1978) IEEE Trans. Power App. Syst. , vol.PAS-97 , pp. 2154-2166
    • Dillon, T.S.1    Edwin, K.W.2    Kochs, H.D.3    Tand, R.J.4
  • 14
    • 0036577791 scopus 로고    scopus 로고
    • Optimal response of a power generator to energy, AGC and reserve pool-based markets
    • May
    • J. M. Arroyo and A. J. Conejo, "Optimal response of a power generator to energy, AGC and reserve pool-based markets," IEEE Trans. Power Syst., vol. 17, pp. 404-410, May 2002.
    • (2002) IEEE Trans. Power Syst. , vol.17 , pp. 404-410
    • Arroyo, J.M.1    Conejo, A.J.2
  • 15
    • 0032593007 scopus 로고    scopus 로고
    • Electricity price short-term forecasting using artificial neural networks
    • Aug
    • B. R. Szkuta, L. A. Sanabria, and T. S. Dillon, "Electricity price short-term forecasting using artificial neural networks," IEEE Trans. Power Syst., vol. 14, pp. 851-857, Aug. 1999.
    • (1999) IEEE Trans. Power Syst. , vol.14 , pp. 851-857
    • Szkuta, B.R.1    Sanabria, L.A.2    Dillon, T.S.3
  • 17
    • 0003650012 scopus 로고    scopus 로고
    • GAMS Development Corporation, Washington. [Online]. Available
    • GAMS/Cplex 7.5 User Notes, GAMS Development Corporation, Washington. (2001). [Online]. Available: http://www.gams.com/
    • (2001) GAMS/Cplex 7.5 User Notes


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.