A multi-agent system for dynamic just-in-time manufacturing production scheduling

Author keywords

Agent based system; Earliness and tardiness penalties; Manufacturing scheduling; On line scheduling

Indexed keywords

AGENT-BASED SYSTEMS; EARLINESS AND TARDINESS PENALTIES; MANUFACTURING SCHEDULING; ONLINE SCHEDULING;

EID: 15744400692     PISSN: 1062922X     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ICSMC.2004.1401077     Document Type: Conference Paper
Times cited : (17)

References (16)
  • 1
    • 85133749042 scopus 로고    scopus 로고
    • Agent-based systems for intelligent manufacturing: A state-of-the-art survey
    • W. Shen, and D.H. Norrie, "Agent-Based Systems for Intelligent Manufacturing: A State-of-the-Art Survey", Knowledge and Information Systems, an International Journal, Vol. 1, No. 2, pp.129-156, 1999.
    • (1999) Knowledge and Information Systems, An International Journal , vol.1 , Issue.2 , pp. 129-156
    • Shen, W.1    Norrie, D.H.2
  • 2
    • 0025211593 scopus 로고
    • Sequencing with earliness and tardiness penalties: A review
    • K.R. Baker, and G.D. Scudder, "Sequencing with earliness and tardiness penalties: a review", Operations Research, Vol. 38, No. 1, pp. 22-36, 1990.
    • (1990) Operations Research , vol.38 , Issue.1 , pp. 22-36
    • Baker, K.R.1    Scudder, G.D.2
  • 3
    • 0033685372 scopus 로고    scopus 로고
    • Scheduling with inserted idle time: Problem taxonomy and literature review
    • J.J Kanet, and V. Sridharan, "Scheduling with Inserted Idle Time: Problem Taxonomy and Literature Review", Operations Research, Vol. 48, No. 1, pp. 99-110, 2000.
    • (2000) Operations Research , vol.48 , Issue.1 , pp. 99-110
    • Kanet, J.J.1    Sridharan, V.2
  • 4
    • 0024010206 scopus 로고
    • One-processor scheduling with symmetric earliness and tardiness penalties
    • M. Garey, R. Tarjan, G. and Wilfong, "One-processor scheduling with symmetric earliness and tardiness penalties", Mathematics of Operations Research, Vol. 13, No. 2, pp. 330-348, 1988.
    • (1988) Mathematics of Operations Research , vol.13 , Issue.2 , pp. 330-348
    • Garey, M.1    Tarjan, R.2    Wilfong, G.3
  • 5
    • 0033079828 scopus 로고    scopus 로고
    • Early/tardy scheduling with sequence dependent setups on uniform parallel machines
    • N. Balakrishnan, J.J. Kanet, and S.V. Sridharan, "Early/tardy scheduling with sequence dependent setups on uniform parallel machines", Computers & Operations Research, Vol. 26, pp. 127-141, 1999.
    • (1999) Computers & Operations Research , vol.26 , pp. 127-141
    • Balakrishnan, N.1    Kanet, J.J.2    Sridharan, S.V.3
  • 6
    • 0034228084 scopus 로고    scopus 로고
    • Minimizing the sum of earliness/tardiness in multi-machine scheduling: A mixed integer programming approach
    • Z. Zhu, and R.B. Heady, "Minimizing the sum of earliness/tardiness in multi-machine scheduling: a mixed integer programming approach", Computers & Industrial Engineering, Vol. 38, pp. 297-305, 2000.
    • (2000) Computers & Industrial Engineering , vol.38 , pp. 297-305
    • Zhu, Z.1    Heady, R.B.2
  • 7
    • 0033166361 scopus 로고    scopus 로고
    • Parallel machine scheduling with earliness and tardiness penalties
    • F. Sivrikaya-Serifoglu, and G. Ulusoy, "Parallel machine scheduling with earliness and tardiness penalties", Computers & Operations Research, Vol. 26, pp. 773-787, 1999.
    • (1999) Computers & Operations Research , vol.26 , pp. 773-787
    • Sivrikaya-Serifoglu, F.1    Ulusoy, G.2
  • 8
    • 0033130807 scopus 로고    scopus 로고
    • A branch and bound approach for single machine scheduling with earliness and tardiness penalties
    • P.C. Chang, "A branch and bound approach for single machine scheduling with earliness and tardiness penalties", Computers and Mathematics with Applications, Vol 37, pp. 133-144, 1999.
    • (1999) Computers and Mathematics with Applications , vol.37 , pp. 133-144
    • Chang, P.C.1
  • 9
    • 0000245614 scopus 로고
    • The single machine early/tardy problem
    • P.S. Ow and I.E. Morton, "The single machine early/tardy problem", Management Science, Vol. 35, No. 2, pp.177-191, 1989.
    • (1989) Management Science , vol.35 , Issue.2 , pp. 177-191
    • Ow, P.S.1    Morton, I.E.2
  • 10
    • 0027606669 scopus 로고
    • Dynamic single machine weighted absolute deviation problem: Predictive heuristics and evaluation
    • U. Nandkeolyar, M.U. Ahmed, and P.S. Sundararaghavan, "Dynamic single machine weighted absolute deviation problem: predictive heuristics and evaluation", International Journal of Production Research, Vol. 31, No. 6, pp. 1453-1466, 1993.
    • (1993) International Journal of Production Research , vol.31 , Issue.6 , pp. 1453-1466
    • Nandkeolyar, U.1    Ahmed, M.U.2    Sundararaghavan, P.S.3
  • 11
    • 0030398995 scopus 로고    scopus 로고
    • Dynamic non-preemptive single machine scheduling
    • V. Sridharan, and Z. Zhou, "Dynamic non-preemptive single machine scheduling", Computers and Operations Research, Vol. 23, No. 12, pp. 1183-1190, 1996.
    • (1996) Computers and Operations Research , vol.23 , Issue.12 , pp. 1183-1190
    • Sridharan, V.1    Zhou, Z.2
  • 12
    • 0342855202 scopus 로고    scopus 로고
    • The AARIA agent architecture: From manufacturing requirements to agent-based system design
    • F.V.D. Parunak, A.D. Baker, and S.J. Clark, "The AARIA agent architecture: From manufacturing requirements to agent-based system design", Integrated Computer-Aided Engineering, Vol. 8, No. 1, pp. 45-58, 2001.
    • (2001) Integrated Computer-Aided Engineering , vol.8 , Issue.1 , pp. 45-58
    • Parunak, F.V.D.1    Baker, A.D.2    Clark, S.J.3
  • 14
    • 0003020021 scopus 로고
    • Integrated shop floor control using autonomous agents
    • G.Y. Lin, and J.J. Solberg, "Integrated Shop Floor Control Using Autonomous Agents," HE Transactions, Vol. 24, pp. 169-206, 1992.
    • (1992) HE Transactions , vol.24 , pp. 169-206
    • Lin, G.Y.1    Solberg, J.J.2
  • 15
    • 0019180974 scopus 로고
    • The contract net protocol: High-level communication and control in a distributed problem solver
    • R.G. Smith, "The Contract Net Protocol: High-Level Communication and Control in a Distributed Problem Solver", IEEE Transactions on Computers, Vol. C-29, No. 12, pp.1104-1113, 1980.
    • (1980) IEEE Transactions on Computers , vol.C-29 , Issue.12 , pp. 1104-1113
    • Smith, R.G.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.