-
2
-
-
0028608174
-
Performance Analysis and Optimization of Schedules for Conditional and Loop-Intensive Specifications
-
June
-
S. Bhattacharya, S. Dey, and F. Brglez. Performance Analysis and Optimization of Schedules for Conditional and Loop-Intensive Specifications. In Proc. Design Automation Conf., pages 491-496, June 1994.
-
(1994)
Proc. Design Automation Conf
, pp. 491-496
-
-
Bhattacharya, S.1
Dey, S.2
Brglez, F.3
-
3
-
-
0025791177
-
Path-Based Scheduling for Synthesis
-
January
-
R. Camposano. Path-Based Scheduling for Synthesis. IEEE TCAD, 10(1):85-93, January 1991.
-
(1991)
IEEE TCAD
, vol.10
, Issue.1
, pp. 85-93
-
-
Camposano, R.1
-
4
-
-
85165854558
-
-
D. Chen, J. Cong, Y. Fan, G. Han, W. Jiang, and Z. Zhang. xPilot: A Platform-Based Behavioral Synthesis System. In Proc. SRC Techcon Conf., October 2005.
-
D. Chen, J. Cong, Y. Fan, G. Han, W. Jiang, and Z. Zhang. xPilot: A Platform-Based Behavioral Synthesis System. In Proc. SRC Techcon Conf., October 2005.
-
-
-
-
5
-
-
0027660748
-
Global Optimization Approach for Architectural Synthesis
-
September
-
C. H. Gebotys and M. I. Elmasry. Global Optimization Approach for Architectural Synthesis. IEEE TCAD, 12(9): 1266-1278, September 1993.
-
(1993)
IEEE TCAD
, vol.12
, Issue.9
, pp. 1266-1278
-
-
Gebotys, C.H.1
Elmasry, M.I.2
-
6
-
-
16244366792
-
A Unified Theory of Timing Budget Management
-
November
-
S. Ghiasi, E. Bozorgzadeh, S. Choudhury, and M. Sarrafzadeh. A Unified Theory of Timing Budget Management. In Proc. Int. Conf. Computer Aided Design, pages 653-659, November 2004.
-
(2004)
Proc. Int. Conf. Computer Aided Design
, pp. 653-659
-
-
Ghiasi, S.1
Bozorgzadeh, E.2
Choudhury, S.3
Sarrafzadeh, M.4
-
7
-
-
1242308405
-
Using Global Code Motions to Improve the Quality of Results for High-Level Synthesis
-
February
-
S. Gupta, N. Savoiu, N. Dutt, R. Gupta, and A. Nicolau. Using Global Code Motions to Improve the Quality of Results for High-Level Synthesis. IEEE TCAD, 23(2):302-311, February 2004.
-
(2004)
IEEE TCAD
, vol.23
, Issue.2
, pp. 302-311
-
-
Gupta, S.1
Savoiu, N.2
Dutt, N.3
Gupta, R.4
Nicolau, A.5
-
8
-
-
0003648867
-
-
PhD thesis, University of California, Santa Barbara, December
-
S. Haynal. Automato-Based Symbolic Scheduling. PhD thesis, University of California, Santa Barbara, December 2000.
-
(2000)
Automato-Based Symbolic Scheduling
-
-
Haynal, S.1
-
9
-
-
0026139605
-
A Formal Approach to the Scheduling Problem in High, Level Synthesis
-
April
-
C-T. Hwang, T-H. Lee, and Y.-C. Hsu. A Formal Approach to the Scheduling Problem in High, Level Synthesis. IEEE TCAD, 10(4):464-475, April 1991.
-
(1991)
IEEE TCAD
, vol.10
, Issue.4
, pp. 464-475
-
-
Hwang, C.-T.1
Lee, T.-H.2
Hsu, Y.-C.3
-
10
-
-
0026175370
-
Empirical Evaluation of Some High-Level Synthesis Scheduling Heuristics
-
June
-
R. Jain, A. Mujumdar, A. Sharma, and H. Wang. Empirical Evaluation of Some High-Level Synthesis Scheduling Heuristics. In Proc. Design Automation Conf., pages 686-689, June 1991.
-
(1991)
Proc. Design Automation Conf
, pp. 686-689
-
-
Jain, R.1
Mujumdar, A.2
Sharma, A.3
Wang, H.4
-
11
-
-
0025543924
-
Relative Scheduling Under Timing Constraints
-
June
-
D. C Ku and G. De Micheli. Relative Scheduling Under Timing Constraints. In Proc. Design Automation Conf., pages 59-64, June 1992.
-
(1992)
Proc. Design Automation Conf
, pp. 59-64
-
-
Ku, D.C.1
De Micheli, G.2
-
12
-
-
0042745479
-
Constraints-Driven Scheduling and Resource Assignment
-
January
-
K. Kuchcinski. Constraints-Driven Scheduling and Resource Assignment. ACM TODAES, 8(3):355-383, January 2003.
-
(2003)
ACM TODAES
, vol.8
, Issue.3
, pp. 355-383
-
-
Kuchcinski, K.1
-
13
-
-
0032627685
-
Wavesched: A Novel Scheduling Technique for Control-Flow Intensive Designs
-
May
-
G. Lakshminarayana, A. Raghunathan, and N. K. Jha. Wavesched: A Novel Scheduling Technique for Control-Flow Intensive Designs. IEEE TCAD, 18(5):505-523, May 1999.
-
(1999)
IEEE TCAD
, vol.18
, Issue.5
, pp. 505-523
-
-
Lakshminarayana, G.1
Raghunathan, A.2
Jha, N.K.3
-
14
-
-
0034157132
-
Incorporating Speculative Execution into Scheduling of Control-Flow-Intensive Designs
-
March
-
G. Lakshminarayana, A. Raghunathan, and N. K. Jha. Incorporating Speculative Execution into Scheduling of Control-Flow-Intensive Designs. IEEE TCAD, 19(3):308-324, March 2000.
-
(2000)
IEEE TCAD
, vol.19
, Issue.3
, pp. 308-324
-
-
Lakshminarayana, G.1
Raghunathan, A.2
Jha, N.K.3
-
15
-
-
0029227122
-
Scheduling using Behavioral Templates
-
June
-
T. Ly, D. Knapp, R. Miller, and D. MacMillen. Scheduling using Behavioral Templates. In Proc. Design Automation Conf., pages 101-106, June 1995.
-
(1995)
Proc. Design Automation Conf
, pp. 101-106
-
-
Ly, T.1
Knapp, D.2
Miller, R.3
MacMillen, D.4
-
16
-
-
33747000124
-
An Efficient ILP-Based Scheduling Algorithm, for Control-Dominated VHDL Descriptions
-
October
-
M. Münch, N. Wehn, and M. Glesner. An Efficient ILP-Based Scheduling Algorithm, for Control-Dominated VHDL Descriptions. ACM TODAES, 2(4):344-364, October 1997.
-
(1997)
ACM TODAES
, vol.2
, Issue.4
, pp. 344-364
-
-
Münch, M.1
Wehn, N.2
Glesner, M.3
-
18
-
-
0024682923
-
Force-Directed Scheduling for the Behavioral Synthesis of ASICs
-
June
-
P. Paulin and J. Knight. Force-Directed Scheduling for the Behavioral Synthesis of ASICs. IEEE TCAD, 8(6):661-678, June 1989.
-
(1989)
IEEE TCAD
, vol.8
, Issue.6
, pp. 661-678
-
-
Paulin, P.1
Knight, J.2
-
19
-
-
0037854898
-
Solving Systems of Difference Constraints Incrementally
-
G. Ramalingam, J. Song, L. Joskowicz, and R. Miller. Solving Systems of Difference Constraints Incrementally. Algorithmica, 23:261-275, 1999.
-
(1999)
Algorithmica
, vol.23
, pp. 261-275
-
-
Ramalingam, G.1
Song, J.2
Joskowicz, L.3
Miller, R.4
-
20
-
-
33751427397
-
Fast Timing Closure Through Interconnect Criticality Driven Delay Relaxation
-
November
-
L. Singhal and E. Bozorgzadeh. Fast Timing Closure Through Interconnect Criticality Driven Delay Relaxation. In Proc. Int. Conf. Computer Aided Design, pages 792-797, November 2005.
-
(2005)
Proc. Int. Conf. Computer Aided Design
, pp. 792-797
-
-
Singhal, L.1
Bozorgzadeh, E.2
|