메뉴 건너뛰기




Volumn 108, Issue 1-2, 2007, Pages 426-435

Planned lead time determination in a make-to-order remanufacturing system

Author keywords

Disassembly; Remanufacturing; Reverse logistics systems

Indexed keywords

COSTS; DECISION MAKING; INDUSTRIAL ECONOMICS; REGULATORY COMPLIANCE; STRATEGIC PLANNING;

EID: 34249948238     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2006.12.034     Document Type: Article
Times cited : (63)

References (17)
  • 2
    • 34249936184 scopus 로고    scopus 로고
    • Grubbström, R.W., 2005. The moments of the product of two distributions. Working Paper WP-337, Department of Production Economics, Linköping Institute of Technology, August 2005.
  • 3
    • 25844446690 scopus 로고    scopus 로고
    • The moments and central moments of a compound distribution
    • Grubbström R.W., and Tang O. The moments and central moments of a compound distribution. European Journal of Operational Research 170 1 (2006) 106-119
    • (2006) European Journal of Operational Research , vol.170 , Issue.1 , pp. 106-119
    • Grubbström, R.W.1    Tang, O.2
  • 4
    • 0033738099 scopus 로고    scopus 로고
    • Production planning and control for remanufacturing: Industry practice and research needs
    • Guide Jr. V.D.R. Production planning and control for remanufacturing: Industry practice and research needs. Journal of Operations Management 18 (2000) 467-483
    • (2000) Journal of Operations Management , vol.18 , pp. 467-483
    • Guide Jr., V.D.R.1
  • 5
    • 0037400660 scopus 로고    scopus 로고
    • Building contingency planning for closed-loop supply chains with product recovery
    • Guide V.D.R., Jayaraman V., and Linton J.D. Building contingency planning for closed-loop supply chains with product recovery. Journal of Operations Management 21 (2003) 259-279
    • (2003) Journal of Operations Management , vol.21 , pp. 259-279
    • Guide, V.D.R.1    Jayaraman, V.2    Linton, J.D.3
  • 6
    • 0033358107 scopus 로고    scopus 로고
    • Issues in environmentally conscious manufacturing and product recovery
    • Gungor A., and Gupta S.M. Issues in environmentally conscious manufacturing and product recovery. Computers & Industrial Engineering 36 (1999) 811-853
    • (1999) Computers & Industrial Engineering , vol.36 , pp. 811-853
    • Gungor, A.1    Gupta, S.M.2
  • 7
    • 84952519001 scopus 로고
    • Planning product disassembly for material recovery opportunities
    • Johnson M.R., and Wang M.H. Planning product disassembly for material recovery opportunities. International Journal of Production Research 33 11 (1995) 3119-3142
    • (1995) International Journal of Production Research , vol.33 , Issue.11 , pp. 3119-3142
    • Johnson, M.R.1    Wang, M.H.2
  • 8
    • 0032300843 scopus 로고    scopus 로고
    • Economic evaluation of disassembly operations for recycling, remanufacturing and reuse
    • Johnson M.R., and Wang M.H. Economic evaluation of disassembly operations for recycling, remanufacturing and reuse. International Journal of Production Research 36 12 (1998) 3227-3252
    • (1998) International Journal of Production Research , vol.36 , Issue.12 , pp. 3227-3252
    • Johnson, M.R.1    Wang, M.H.2
  • 9
    • 0037449040 scopus 로고    scopus 로고
    • A new approach for controlling a hybrid stochastic manufacturing/remanufacturing system with inventories and different leadtimes
    • Kiesmüller G.P. A new approach for controlling a hybrid stochastic manufacturing/remanufacturing system with inventories and different leadtimes. European Journal of Operational Research 147 1 (2003) 62-71
    • (2003) European Journal of Operational Research , vol.147 , Issue.1 , pp. 62-71
    • Kiesmüller, G.P.1
  • 10
    • 0037287527 scopus 로고    scopus 로고
    • Simple expression for finding recovery system inventory control parameter values
    • Kiesmüller G.P., and Minner S. Simple expression for finding recovery system inventory control parameter values. Journal of the Operational Research Society 53 (2003) 83-88
    • (2003) Journal of the Operational Research Society , vol.53 , pp. 83-88
    • Kiesmüller, G.P.1    Minner, S.2
  • 11
    • 0001552617 scopus 로고    scopus 로고
    • The single-period (news-vendor) problem: Literature review and suggestions for future research
    • Khouja M. The single-period (news-vendor) problem: Literature review and suggestions for future research. Omega 27 5 (1999) 537-553
    • (1999) Omega , vol.27 , Issue.5 , pp. 537-553
    • Khouja, M.1
  • 14
    • 0037138029 scopus 로고    scopus 로고
    • Two-stage make-to-order remanufacturing with service-level constraints
    • Souza G.C., and Ketzenberg M.E. Two-stage make-to-order remanufacturing with service-level constraints. International Journal of Production Research 40 2 (2002) 477-493
    • (2002) International Journal of Production Research , vol.40 , Issue.2 , pp. 477-493
    • Souza, G.C.1    Ketzenberg, M.E.2
  • 15
    • 34249929705 scopus 로고    scopus 로고
    • Teunter, R. H., van der Laan, E., Vlachos, D., 2002. Inventory strategies for systems with fast remanufacturing. ERIM Report Series Reference No. ERS-2002-77-LIS.
  • 16
    • 0345253867 scopus 로고    scopus 로고
    • An investigation of lead-time effects in manufacturing/remanufacturing systems under simple PUSH and PULL control strategies
    • van der Laan E., Salomon M., and Dekker R. An investigation of lead-time effects in manufacturing/remanufacturing systems under simple PUSH and PULL control strategies. European Journal of Operational Research 115 (1999) 195-214
    • (1999) European Journal of Operational Research , vol.115 , pp. 195-214
    • van der Laan, E.1    Salomon, M.2    Dekker, R.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.