A new heuristic and dominance relations for no-wait flowshops with setups
-
Aldowaisan T (2001) A new heuristic and dominance relations for no-wait flowshops with setups. Comput Oper Res 28(6):563-584
-
(2001)
Comput Oper Res
, vol.28
, Issue.6
, pp. 563-584
-
-
Aldowaisan, T.1
-
2
-
-
0032162519
-
Total flowtime in no-wait flowshops with separated setup times
-
Aldowaisan T, Allahverdi A (1998) Total flowtime in no-wait flowshops with separated setup times. Comput Oper Res 25(9):757-765
-
(1998)
Comput Oper Res
, vol.25
, Issue.9
, pp. 757-765
-
-
Aldowaisan, T.1
Allahverdi, A.2
-
3
-
-
85006730976
-
No-wait and separate setup three-machine flowshop with total completion time criterion
-
Allahverdi A, Aldowaisan T (2000) No-wait and separate setup three-machine flowshop with total completion time criterion. Int Trans Oper Res 7(3):245-264
-
(2000)
Int Trans Oper Res
, vol.7
, Issue.3
, pp. 245-264
-
-
Allahverdi, A.1
Aldowaisan, T.2
-
4
-
-
0035312088
-
Minimizing total completion time in a no-wait flowshop with sequence-dependent additive changeover times
-
Allahverdi A, Aldowaisan T (2001) Minimizing total completion time in a no-wait flowshop with sequence-dependent additive changeover times. J Oper Res Soc 52:449-462
-
(2001)
J Oper Res Soc
, vol.52
, pp. 449-462
-
-
Allahverdi, A.1
Aldowaisan, T.2
-
5
-
-
0001096735
-
Genetic algorithms and random keys for sequencing and optimization
-
Bean JC (1994) Genetic algorithms and random keys for sequencing and optimization. ORSA J Comput 6(2): 154-160
-
(1994)
ORSA J Comput
, vol.6
, Issue.2
, pp. 154-160
-
-
Bean, J.C.1
-
7
-
-
0035721450
-
No-wait and blocking job-shops: Challenging problems for GA's
-
Man, and Cybernetics
-
Brizuela CA, Zhao Y, Sannomiya N (2001) No-wait and blocking job-shops: challenging problems for GA's. Proceedings of 2001 IEEE International Conference on Systems, Man, and Cybernetics 4:2349-2354
-
(2001)
Proceedings of 2001 IEEE International Conference on Systems
, vol.4
, pp. 2349-2354
-
-
Brizuela, C.A.1
Zhao, Y.2
Sannomiya, N.3
-
8
-
-
0035245318
-
Scheduling no-wait production with time windows and flexible processing times
-
Chauvet F, Proth JM, Wardi Y (2001) Scheduling no-wait production with time windows and flexible processing times, IEEE Trans Robot Autom 17(1):60-69
-
(2001)
IEEE Trans Robot Autom
, vol.17
, Issue.1
, pp. 60-69
-
-
Chauvet, F.1
Proth, J.M.2
Wardi, Y.3
-
9
-
-
0025474221
-
A state-of-the-art review of parallel-machine scheduling research
-
Cheng TCE, Sin CCS (1990) A state-of-the-art review of parallel-machine scheduling research. Eur J Oper Res 47:271-292
-
(1990)
Eur J Oper Res
, vol.47
, pp. 271-292
-
-
Cheng, T.C.E.1
Sin, C.C.S.2
-
10
-
-
0030242695
-
-
Cheng R, Gen M, Tsujimura Y (1996) A tutorial survey of job-shop scheduling problems using genetic algorithms - I. Representation. Computers and Industrial Engineering 30(4):983-997
-
Cheng R, Gen M, Tsujimura Y (1996) A tutorial survey of job-shop scheduling problems using genetic algorithms - I. Representation. Computers and Industrial Engineering 30(4):983-997
-
-
-
-
11
-
-
34249681441
-
Using GA and CTPN for modeling the optimization-based schedule generator of a generic production scheduling system
-
Chien C, Chen C (2006) Using GA and CTPN for modeling the optimization-based schedule generator of a generic production scheduling system. Int J Prod Res 1-27
-
(2006)
Int J Prod Res
, pp. 1-27
-
-
Chien, C.1
Chen, C.2
-
12
-
-
33747633362
-
A novel method for determining machine subgroups and backups with an empirical study for semiconductor manufacturing
-
Chien C, Hsu C (2006) A novel method for determining machine subgroups and backups with an empirical study for semiconductor manufacturing. J Intell Manuf 17:429-440
-
(2006)
J Intell Manuf
, vol.17
, pp. 429-440
-
-
Chien, C.1
Hsu, C.2
-
13
-
-
33846900745
-
Construct a Group OEE for promoting tool group productivity in semiconductor manufacturing
-
Chien C, Chen H, Wu J, Hu C (2006) Construct a Group OEE for promoting tool group productivity in semiconductor manufacturing. Int J Prod Res 44:1-16
-
(2006)
Int J Prod Res
, vol.44
, pp. 1-16
-
-
Chien, C.1
Chen, H.2
Wu, J.3
Hu, C.4
-
15
-
-
0000131281
-
Algorithms for solving production scheduling problems
-
Giffler B, Thompson G (1960) Algorithms for solving production scheduling problems. Oper Res 8(4):487-503
-
(1960)
Oper Res
, vol.8
, Issue.4
, pp. 487-503
-
-
Giffler, B.1
Thompson, G.2
-
16
-
-
0031281269
-
Two-stage no-wait scheduling models with setup and removal times separated
-
Gupta JND, Strusevich VA, Zwaneveld CM (1997) Two-stage no-wait scheduling models with setup and removal times separated. Comput Oper Res 24(11):1025-1031
-
(1997)
Comput Oper Res
, vol.24
, Issue.11
, pp. 1025-1031
-
-
Gupta, J.N.D.1
Strusevich, V.A.2
Zwaneveld, C.M.3
-
17
-
-
0030134958
-
A survey of machine scheduling problems with blocking and no-wait in process
-
Hall NG, Sriskandarajah C (1996) A survey of machine scheduling problems with blocking and no-wait in process. Oper Res 44(3):510-525
-
(1996)
Oper Res
, vol.44
, Issue.3
, pp. 510-525
-
-
Hall, N.G.1
Sriskandarajah, C.2
-
19
-
-
0035371682
-
Batch scheduling in the no-wait two-machine flowshop to minimize the makespan
-
Lin Bertrand MT, TC Edwin Cheng (2001) Batch scheduling in the no-wait two-machine flowshop to minimize the makespan. Comput Oper Res 28(7):613-624
-
(2001)
Comput Oper Res
, vol.28
, Issue.7
, pp. 613-624
-
-
Lin Bertrand, M.T.1
Edwin Cheng, T.C.2
-
20
-
-
0032138478
-
Modeling and emulation of a furnace in IC fab based on colored-timed Petri net
-
Lin SY, Huang HP (1998) Modeling and emulation of a furnace in IC fab based on colored-timed Petri net. IEEE Transact Semicond Manuf 11 (3):410-420
-
(1998)
IEEE Transact Semicond Manuf
, vol.11
, Issue.3
, pp. 410-420
-
-
Lin, S.Y.1
Huang, H.P.2
-
21
-
-
0032671418
-
Modeling and optimization of industrial manufacturing processes subject to no-wait constraints
-
Macchiaroli R, Mole S, Rietnma S (1999) Modeling and optimization of industrial manufacturing processes subject to no-wait constraints, Int J Prod Res 37(11):2585-2607
-
(1999)
Int J Prod Res
, vol.37
, Issue.11
, pp. 2585-2607
-
-
Macchiaroli, R.1
Mole, S.2
Rietnma, S.3
-
22
-
-
0037121475
-
Job-shop scheduling with blocking and no-wait constraints
-
Mascis A, Pacciarelli D (2002) Job-shop scheduling with blocking and no-wait constraints. Eur J Oper Res 143:498-517
-
(2002)
Eur J Oper Res
, vol.143
, pp. 498-517
-
-
Mascis, A.1
Pacciarelli, D.2
-
23
-
-
0030295335
-
A local search heuristic for unrelated parallel machine scheduling with efficient neighborhood search
-
Piersma N, Dijk WV (1996) A local search heuristic for unrelated parallel machine scheduling with efficient neighborhood search, Math Comput Model 24(9): 1-19
-
(1996)
Math Comput Model
, vol.24
, Issue.9
, pp. 1-19
-
-
Piersma, N.1
Dijk, W.V.2
-
24
-
-
0033895628
-
Scheduling with batching: A review
-
Potts CN, Kovalyov MY (2000) Scheduling with batching: a review. Eur J Oper Res 120(2):228-249
-
(2000)
Eur J Oper Res
, vol.120
, Issue.2
, pp. 228-249
-
-
Potts, C.N.1
Kovalyov, M.Y.2
-
25
-
-
0242490108
-
Batch scheduling in a two-machine flow shop with limited buffer and sequence independent setup times and removal times
-
Pranzo M (2004) Batch scheduling in a two-machine flow shop with limited buffer and sequence independent setup times and removal times. Eur J Oper Res 153(3):581-592
-
(2004)
Eur J Oper Res
, vol.153
, Issue.3
, pp. 581-592
-
-
Pranzo, M.1
-
26
-
-
0034300834
-
Scheduling multipurpose batch process industries with no-wait restrictions by simulated annealing
-
Raaymakers WHM, Hoogeveen JA (2000) Scheduling multipurpose batch process industries with no-wait restrictions by simulated annealing. Eur J Oper Res 126:131-151
-
(2000)
Eur J Oper Res
, vol.126
, pp. 131-151
-
-
Raaymakers, W.H.M.1
Hoogeveen, J.A.2
-
27
-
-
0029224965
-
A genetic algorithm for flow shop sequencing
-
Reeves C (1995) A genetic algorithm for flow shop sequencing. Comput Oper Res 22:5-13
-
(1995)
Comput Oper Res
, vol.22
, pp. 5-13
-
-
Reeves, C.1
-
28
-
-
0343963100
-
Scheduling with limited machine availability
-
Schmidt G (2000) Scheduling with limited machine availability. Eur J Oper Res 121:1-15
-
(2000)
Eur J Oper Res
, vol.121
, pp. 1-15
-
-
Schmidt, G.1
-
29
-
-
0037566323
-
Approximative procedures for no-wait job shop scheduling
-
Schuster CJ, Framinan JM (2003) Approximative procedures for no-wait job shop scheduling. Oper Res Lett 31:308-318
-
(2003)
Oper Res Lett
, vol.31
, pp. 308-318
-
-
Schuster, C.J.1
Framinan, J.M.2
-
30
-
-
0033733028
-
A heuristic for scheduling two-machine no-wait flow shops with anticipatory setups
-
Sidney JB, Potts CN, Sriskandarajah C (2000) A heuristic for scheduling two-machine no-wait flow shops with anticipatory setups. Oper Res Lett 26(4): 165-173
-
(2000)
Oper Res Lett
, vol.26
, Issue.4
, pp. 165-173
-
-
Sidney, J.B.1
Potts, C.N.2
Sriskandarajah, C.3
-
31
-
-
84952240555
-
A review of production planning and scheduling models in the semiconductor industry: Part I
-
Uzsoy R, Lee CY, Martin-Vega LA (1992) A review of production planning and scheduling models in the semiconductor industry: Part I. IIE Trans 24(4):47-60
-
(1992)
IIE Trans
, vol.24
, Issue.4
, pp. 47-60
-
-
Uzsoy, R.1
Lee, C.Y.2
Martin-Vega, L.A.3
|