메뉴 건너뛰기




Volumn 29, Issue 3, 2007, Pages 391-419

A novel timetabling algorithm for a furnace process for semiconductor fabrication with constrained waiting and frequency-based setups

Author keywords

Frequency based setup; Genetic algorithm; Scheduling; Semiconductor manufacturing; Waiting time constraint

Indexed keywords


EID: 34249729418     PISSN: 01716468     EISSN: 14366304     Source Type: Journal    
DOI: 10.1007/s00291-006-0062-3     Document Type: Article
Times cited : (68)

References (31)
  • 1
    • 0035324669 scopus 로고    scopus 로고
    • A new heuristic and dominance relations for no-wait flowshops with setups
    • Aldowaisan T (2001) A new heuristic and dominance relations for no-wait flowshops with setups. Comput Oper Res 28(6):563-584
    • (2001) Comput Oper Res , vol.28 , Issue.6 , pp. 563-584
    • Aldowaisan, T.1
  • 2
    • 0032162519 scopus 로고    scopus 로고
    • Total flowtime in no-wait flowshops with separated setup times
    • Aldowaisan T, Allahverdi A (1998) Total flowtime in no-wait flowshops with separated setup times. Comput Oper Res 25(9):757-765
    • (1998) Comput Oper Res , vol.25 , Issue.9 , pp. 757-765
    • Aldowaisan, T.1    Allahverdi, A.2
  • 3
    • 85006730976 scopus 로고    scopus 로고
    • No-wait and separate setup three-machine flowshop with total completion time criterion
    • Allahverdi A, Aldowaisan T (2000) No-wait and separate setup three-machine flowshop with total completion time criterion. Int Trans Oper Res 7(3):245-264
    • (2000) Int Trans Oper Res , vol.7 , Issue.3 , pp. 245-264
    • Allahverdi, A.1    Aldowaisan, T.2
  • 4
    • 0035312088 scopus 로고    scopus 로고
    • Minimizing total completion time in a no-wait flowshop with sequence-dependent additive changeover times
    • Allahverdi A, Aldowaisan T (2001) Minimizing total completion time in a no-wait flowshop with sequence-dependent additive changeover times. J Oper Res Soc 52:449-462
    • (2001) J Oper Res Soc , vol.52 , pp. 449-462
    • Allahverdi, A.1    Aldowaisan, T.2
  • 5
    • 0001096735 scopus 로고
    • Genetic algorithms and random keys for sequencing and optimization
    • Bean JC (1994) Genetic algorithms and random keys for sequencing and optimization. ORSA J Comput 6(2): 154-160
    • (1994) ORSA J Comput , vol.6 , Issue.2 , pp. 154-160
    • Bean, J.C.1
  • 8
    • 0035245318 scopus 로고    scopus 로고
    • Scheduling no-wait production with time windows and flexible processing times
    • Chauvet F, Proth JM, Wardi Y (2001) Scheduling no-wait production with time windows and flexible processing times, IEEE Trans Robot Autom 17(1):60-69
    • (2001) IEEE Trans Robot Autom , vol.17 , Issue.1 , pp. 60-69
    • Chauvet, F.1    Proth, J.M.2    Wardi, Y.3
  • 9
    • 0025474221 scopus 로고
    • A state-of-the-art review of parallel-machine scheduling research
    • Cheng TCE, Sin CCS (1990) A state-of-the-art review of parallel-machine scheduling research. Eur J Oper Res 47:271-292
    • (1990) Eur J Oper Res , vol.47 , pp. 271-292
    • Cheng, T.C.E.1    Sin, C.C.S.2
  • 10
    • 0030242695 scopus 로고    scopus 로고
    • Cheng R, Gen M, Tsujimura Y (1996) A tutorial survey of job-shop scheduling problems using genetic algorithms - I. Representation. Computers and Industrial Engineering 30(4):983-997
    • Cheng R, Gen M, Tsujimura Y (1996) A tutorial survey of job-shop scheduling problems using genetic algorithms - I. Representation. Computers and Industrial Engineering 30(4):983-997
  • 11
    • 34249681441 scopus 로고    scopus 로고
    • Using GA and CTPN for modeling the optimization-based schedule generator of a generic production scheduling system
    • Chien C, Chen C (2006) Using GA and CTPN for modeling the optimization-based schedule generator of a generic production scheduling system. Int J Prod Res 1-27
    • (2006) Int J Prod Res , pp. 1-27
    • Chien, C.1    Chen, C.2
  • 12
    • 33747633362 scopus 로고    scopus 로고
    • A novel method for determining machine subgroups and backups with an empirical study for semiconductor manufacturing
    • Chien C, Hsu C (2006) A novel method for determining machine subgroups and backups with an empirical study for semiconductor manufacturing. J Intell Manuf 17:429-440
    • (2006) J Intell Manuf , vol.17 , pp. 429-440
    • Chien, C.1    Hsu, C.2
  • 13
    • 33846900745 scopus 로고    scopus 로고
    • Construct a Group OEE for promoting tool group productivity in semiconductor manufacturing
    • Chien C, Chen H, Wu J, Hu C (2006) Construct a Group OEE for promoting tool group productivity in semiconductor manufacturing. Int J Prod Res 44:1-16
    • (2006) Int J Prod Res , vol.44 , pp. 1-16
    • Chien, C.1    Chen, H.2    Wu, J.3    Hu, C.4
  • 15
    • 0000131281 scopus 로고
    • Algorithms for solving production scheduling problems
    • Giffler B, Thompson G (1960) Algorithms for solving production scheduling problems. Oper Res 8(4):487-503
    • (1960) Oper Res , vol.8 , Issue.4 , pp. 487-503
    • Giffler, B.1    Thompson, G.2
  • 16
    • 0031281269 scopus 로고    scopus 로고
    • Two-stage no-wait scheduling models with setup and removal times separated
    • Gupta JND, Strusevich VA, Zwaneveld CM (1997) Two-stage no-wait scheduling models with setup and removal times separated. Comput Oper Res 24(11):1025-1031
    • (1997) Comput Oper Res , vol.24 , Issue.11 , pp. 1025-1031
    • Gupta, J.N.D.1    Strusevich, V.A.2    Zwaneveld, C.M.3
  • 17
    • 0030134958 scopus 로고    scopus 로고
    • A survey of machine scheduling problems with blocking and no-wait in process
    • Hall NG, Sriskandarajah C (1996) A survey of machine scheduling problems with blocking and no-wait in process. Oper Res 44(3):510-525
    • (1996) Oper Res , vol.44 , Issue.3 , pp. 510-525
    • Hall, N.G.1    Sriskandarajah, C.2
  • 19
    • 0035371682 scopus 로고    scopus 로고
    • Batch scheduling in the no-wait two-machine flowshop to minimize the makespan
    • Lin Bertrand MT, TC Edwin Cheng (2001) Batch scheduling in the no-wait two-machine flowshop to minimize the makespan. Comput Oper Res 28(7):613-624
    • (2001) Comput Oper Res , vol.28 , Issue.7 , pp. 613-624
    • Lin Bertrand, M.T.1    Edwin Cheng, T.C.2
  • 20
    • 0032138478 scopus 로고    scopus 로고
    • Modeling and emulation of a furnace in IC fab based on colored-timed Petri net
    • Lin SY, Huang HP (1998) Modeling and emulation of a furnace in IC fab based on colored-timed Petri net. IEEE Transact Semicond Manuf 11 (3):410-420
    • (1998) IEEE Transact Semicond Manuf , vol.11 , Issue.3 , pp. 410-420
    • Lin, S.Y.1    Huang, H.P.2
  • 21
    • 0032671418 scopus 로고    scopus 로고
    • Modeling and optimization of industrial manufacturing processes subject to no-wait constraints
    • Macchiaroli R, Mole S, Rietnma S (1999) Modeling and optimization of industrial manufacturing processes subject to no-wait constraints, Int J Prod Res 37(11):2585-2607
    • (1999) Int J Prod Res , vol.37 , Issue.11 , pp. 2585-2607
    • Macchiaroli, R.1    Mole, S.2    Rietnma, S.3
  • 22
    • 0037121475 scopus 로고    scopus 로고
    • Job-shop scheduling with blocking and no-wait constraints
    • Mascis A, Pacciarelli D (2002) Job-shop scheduling with blocking and no-wait constraints. Eur J Oper Res 143:498-517
    • (2002) Eur J Oper Res , vol.143 , pp. 498-517
    • Mascis, A.1    Pacciarelli, D.2
  • 23
    • 0030295335 scopus 로고    scopus 로고
    • A local search heuristic for unrelated parallel machine scheduling with efficient neighborhood search
    • Piersma N, Dijk WV (1996) A local search heuristic for unrelated parallel machine scheduling with efficient neighborhood search, Math Comput Model 24(9): 1-19
    • (1996) Math Comput Model , vol.24 , Issue.9 , pp. 1-19
    • Piersma, N.1    Dijk, W.V.2
  • 24
    • 0033895628 scopus 로고    scopus 로고
    • Scheduling with batching: A review
    • Potts CN, Kovalyov MY (2000) Scheduling with batching: a review. Eur J Oper Res 120(2):228-249
    • (2000) Eur J Oper Res , vol.120 , Issue.2 , pp. 228-249
    • Potts, C.N.1    Kovalyov, M.Y.2
  • 25
    • 0242490108 scopus 로고    scopus 로고
    • Batch scheduling in a two-machine flow shop with limited buffer and sequence independent setup times and removal times
    • Pranzo M (2004) Batch scheduling in a two-machine flow shop with limited buffer and sequence independent setup times and removal times. Eur J Oper Res 153(3):581-592
    • (2004) Eur J Oper Res , vol.153 , Issue.3 , pp. 581-592
    • Pranzo, M.1
  • 26
    • 0034300834 scopus 로고    scopus 로고
    • Scheduling multipurpose batch process industries with no-wait restrictions by simulated annealing
    • Raaymakers WHM, Hoogeveen JA (2000) Scheduling multipurpose batch process industries with no-wait restrictions by simulated annealing. Eur J Oper Res 126:131-151
    • (2000) Eur J Oper Res , vol.126 , pp. 131-151
    • Raaymakers, W.H.M.1    Hoogeveen, J.A.2
  • 27
    • 0029224965 scopus 로고
    • A genetic algorithm for flow shop sequencing
    • Reeves C (1995) A genetic algorithm for flow shop sequencing. Comput Oper Res 22:5-13
    • (1995) Comput Oper Res , vol.22 , pp. 5-13
    • Reeves, C.1
  • 28
    • 0343963100 scopus 로고    scopus 로고
    • Scheduling with limited machine availability
    • Schmidt G (2000) Scheduling with limited machine availability. Eur J Oper Res 121:1-15
    • (2000) Eur J Oper Res , vol.121 , pp. 1-15
    • Schmidt, G.1
  • 29
    • 0037566323 scopus 로고    scopus 로고
    • Approximative procedures for no-wait job shop scheduling
    • Schuster CJ, Framinan JM (2003) Approximative procedures for no-wait job shop scheduling. Oper Res Lett 31:308-318
    • (2003) Oper Res Lett , vol.31 , pp. 308-318
    • Schuster, C.J.1    Framinan, J.M.2
  • 30
    • 0033733028 scopus 로고    scopus 로고
    • A heuristic for scheduling two-machine no-wait flow shops with anticipatory setups
    • Sidney JB, Potts CN, Sriskandarajah C (2000) A heuristic for scheduling two-machine no-wait flow shops with anticipatory setups. Oper Res Lett 26(4): 165-173
    • (2000) Oper Res Lett , vol.26 , Issue.4 , pp. 165-173
    • Sidney, J.B.1    Potts, C.N.2    Sriskandarajah, C.3
  • 31
    • 84952240555 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry: Part I
    • Uzsoy R, Lee CY, Martin-Vega LA (1992) A review of production planning and scheduling models in the semiconductor industry: Part I. IIE Trans 24(4):47-60
    • (1992) IIE Trans , vol.24 , Issue.4 , pp. 47-60
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.