-
2
-
-
34447336282
-
Using simulation for execution monitoring and on-line rescheduling with uncertain durations
-
J. Bidot, P. Laborie, J. C. Beck, and T. Vidal. Using simulation for execution monitoring and on-line rescheduling with uncertain durations. In Working Notes of the ICAPS'03 Workshop on Plan Execution, Trento, Italy, June 2003.
-
Working Notes of the ICAPS'03 Workshop on Plan Execution, Trento, Italy, June 2003
-
-
Bidot, J.1
Laborie, P.2
Beck, J.C.3
Vidal, T.4
-
3
-
-
79961175593
-
Using constraint programming and simulation for execution monitoring and progressive scheduling
-
J. Bidot, P. Laborie, J. C. Beck, and T. Vidal. Using constraint programming and simulation for execution monitoring and progressive scheduling. In Proc. of the Twelfth IFAC Symposium on Information Control Problems in Manufacturing (INCOM 2006), Saint-Étienne, France, May 2006.
-
Proc. of the Twelfth IFAC Symposium on Information Control Problems in Manufacturing (INCOM 2006), Saint-Étienne, France, May 2006
-
-
Bidot, J.1
Laborie, P.2
Beck, J.C.3
Vidal, T.4
-
4
-
-
0030360003
-
Mixed constraint satisfaction: A framework for decision problems under incomplete knowledge
-
th National Conference on Artificial Intelligence (AAAI' 96), Portland, Oregon, USA, August 1996.
-
th National Conference on Artificial Intelligence (AAAI' 96), Portland, Oregon, USA, August 1996
-
-
Fargier, H.1
Lang, J.2
Schiex, T.3
-
5
-
-
1542502674
-
Robust and reactive project scheduling: A review and classification of procedures
-
W. S. Herroelen and R. Leus. Robust and reactive project scheduling: A review and classification of procedures. Int'l Journal of Production Research, 42(8):1599-1620, 2004.
-
(2004)
Int'l Journal of Production Research
, vol.42
, Issue.8
, pp. 1599-1620
-
-
Herroelen, W.S.1
Leus, R.2
-
6
-
-
84880915879
-
Dynamic control of plans with temporal uncertainty
-
th Int'l Joint Conference on Artificial Intelligence (IJCAI'01), Seattle, Washington, USA, August 2001.
-
th Int'l Joint Conference on Artificial Intelligence (IJCAI'01), Seattle, Washington, USA, August 2001
-
-
Morris, P.H.1
Muscettola, N.2
Vidal, T.3
-
7
-
-
84880865598
-
Predictive and reactive scheduling with the Micro-Boss production scheduling and control system
-
N. M. Sadeh, S. Otsuka, and R. Schnelbach. Predictive and reactive scheduling with the Micro-Boss production scheduling and control system. In Working Notes of the IJCAI'93 Workshop on Knowledge-based Production Planning, Scheduling, and Control, Chambéry, France, August 1993.
-
Working Notes of the IJCAI'93 Workshop on Knowledge-based Production Planning, Scheduling, and Control, Chambéry, France, August 1993
-
-
Sadeh, N.M.1
Otsuka, S.2
Schnelbach, R.3
-
8
-
-
0042481741
-
CTP: A new constraint-based formalism for conditional, temporal planning
-
I. Tsamardinos, T. Vidal, and M. E. Pollack. CTP: A new constraint-based formalism for conditional, temporal planning. CONSTRAINTS, 8(4), 2003.
-
(2003)
Constraints
, vol.8
, Issue.4
-
-
Tsamardinos, I.1
Vidal, T.2
Pollack, M.E.3
-
9
-
-
0029697737
-
Incremental mission allocation to a large team of robots
-
T. Vidal, M. Ghallab, and R. Alami. Incremental mission allocation to a large team of robots. In Proc. of the 1996 IEEE Int'l Conference on Robotics and Automation (ICRA'96), Minneapolis, Minnesota, USA, April 1996.
-
Proc. of the 1996 IEEE Int'l Conference on Robotics and Automation (ICRA'96), Minneapolis, Minnesota, USA, April 1996
-
-
Vidal, T.1
Ghallab, M.2
Alami, R.3
|