메뉴 건너뛰기




Volumn 22, Issue 2, 2007, Pages 791-799

Optimal distribution system horizon planning - Part I: Formulation

Author keywords

Circuit optimization; Losses; Minimization methods; Optimization methods; Power distribution economics; Power distribution lines; Power distribution planning

Indexed keywords

ELECTRIC POTENTIAL; MATHEMATICAL MODELS; NONLINEAR PROGRAMMING; OPTIMAL CONTROL SYSTEMS; OPTIMIZATION; RELIABILITY THEORY; VOLTAGE CONTROL;

EID: 34248589613     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRS.2007.895173     Document Type: Article
Times cited : (96)

References (30)
  • 1
    • 0031198932 scopus 로고    scopus 로고
    • Power distribution planning: A review of models and issues
    • Aug
    • S. K. Khator and L. C. Leung, "Power distribution planning: A review of models and issues," IEEE Trans. Power Syst., vol. 12, no. 3, pp. 1151-1159, Aug. 1997.
    • (1997) IEEE Trans. Power Syst , vol.12 , Issue.3 , pp. 1151-1159
    • Khator, S.K.1    Leung, L.C.2
  • 2
    • 0038645666 scopus 로고    scopus 로고
    • Distribution expansion problem: Formulation and practicality for a multistage globally optimal solution
    • Feb
    • M. Vaziri, K. Tomsovic, A. Bose, and T. Gönen, "Distribution expansion problem: Formulation and practicality for a multistage globally optimal solution," in Proc. IEEE Power Engineering Soc. Winter Meeting Conf., Feb. 2001, vol. 3, pp. 1461-1466.
    • (2001) Proc. IEEE Power Engineering Soc. Winter Meeting Conf , vol.3 , pp. 1461-1466
    • Vaziri, M.1    Tomsovic, K.2    Bose, A.3    Gönen, T.4
  • 3
    • 3242767658 scopus 로고    scopus 로고
    • A directed graph formulation of the multistage distribution expansion problem
    • Jul
    • M. Vaziri, K. Tomsovic, and A. Bose, "A directed graph formulation of the multistage distribution expansion problem," IEEE Trans. Power Delivery, vol. 19, no. 3, pp. 1335-1341, Jul. 2004.
    • (2004) IEEE Trans. Power Delivery , vol.19 , Issue.3 , pp. 1335-1341
    • Vaziri, M.1    Tomsovic, K.2    Bose, A.3
  • 4
    • 0026107663 scopus 로고
    • Pseudo-dynamic planning for expansion of power distribution systems
    • Feb
    • I. J. Ramirez-Rosado and T. Gönen, "Pseudo-dynamic planning for expansion of power distribution systems," IEEE Trans. Power Syst. vol. 6, no. 1, pp. 245-254, Feb. 1991.
    • (1991) IEEE Trans. Power Syst , vol.6 , Issue.1 , pp. 245-254
    • Ramirez-Rosado, I.J.1    Gönen, T.2
  • 5
    • 0030286087 scopus 로고    scopus 로고
    • Experience with optimization software for distribution system planning
    • Nov
    • M. Blanchard, L. Delorme, C. Simard, and Y. Nadeau, "Experience with optimization software for distribution system planning," IEEE Trans. Power Syst., vol. 11, no. 4, pp. 1891-1898, Nov. 1996.
    • (1996) IEEE Trans. Power Syst , vol.11 , Issue.4 , pp. 1891-1898
    • Blanchard, M.1    Delorme, L.2    Simard, C.3    Nadeau, Y.4
  • 6
    • 3242782542 scopus 로고    scopus 로고
    • Optimization of electric distribution feeders using simulated annealing
    • Jul
    • V. Parada, J. A. Ferland, M. Arias, and K. Daniels, "Optimization of electric distribution feeders using simulated annealing," IEEE Trans Power Delivery, vol. 19, pp. 1135-1141, Jul. 2004.
    • (2004) IEEE Trans Power Delivery , vol.19 , pp. 1135-1141
    • Parada, V.1    Ferland, J.A.2    Arias, M.3    Daniels, K.4
  • 7
    • 3042879689 scopus 로고
    • Long-range planning of power distribution systems: Primary networks
    • Aug
    • M. S. Carneiro, P. M. Franca, and P. D. Silverira, "Long-range planning of power distribution systems: Primary networks," Elect. Power Syst. Res., vol. 27, no. 3, pp. 233-231, Aug. 1993.
    • (1993) Elect. Power Syst. Res , vol.27 , Issue.3 , pp. 233-231
    • Carneiro, M.S.1    Franca, P.M.2    Silverira, P.D.3
  • 8
    • 0030149243 scopus 로고    scopus 로고
    • Long-range planning of power distribution systems: Secondary networks
    • May
    • M. S. Carneiro, P. M. Franca, and P. D. Silverira, "Long-range planning of power distribution systems: Secondary networks," Comput. Elect. Eng., vol. 22, no. 3, pp. 179-191, May 1996.
    • (1996) Comput. Elect. Eng , vol.22 , Issue.3 , pp. 179-191
    • Carneiro, M.S.1    Franca, P.M.2    Silverira, P.D.3
  • 9
    • 0036473770 scopus 로고    scopus 로고
    • Optimal selection of conductors for distribution feeders
    • Feb
    • S. Manda and A. Pahwa, "Optimal selection of conductors for distribution feeders," IEEE Trans. Power Syst., vol. 17, no. 1, pp. 192-197, Feb. 2002.
    • (2002) IEEE Trans. Power Syst , vol.17 , Issue.1 , pp. 192-197
    • Manda, S.1    Pahwa, A.2
  • 10
    • 0023290314 scopus 로고
    • Optimal conductor selection in planning radial distribution systems
    • Feb
    • H. N. Tram and D. L. Wall, "Optimal conductor selection in planning radial distribution systems," IEEE Trans. Power Syst., vol. 3, no. 1, pp. 200-206, Feb. 1988.
    • (1988) IEEE Trans. Power Syst , vol.3 , Issue.1 , pp. 200-206
    • Tram, H.N.1    Wall, D.L.2
  • 12
    • 0033708312 scopus 로고    scopus 로고
    • A practical approach to the conductor size selection in planning radial distribution system
    • Jan
    • Z. Wang, H. Liu, D. C. Yu, X. Wang, and H. Song, "A practical approach to the conductor size selection in planning radial distribution system," IEEE Trans. Power Delivery, vol. 15, no. 1, pp. 350-354, Jan. 2000.
    • (2000) IEEE Trans. Power Delivery , vol.15 , Issue.1 , pp. 350-354
    • Wang, Z.1    Liu, H.2    Yu, D.C.3    Wang, X.4    Song, H.5
  • 13
    • 0036699439 scopus 로고    scopus 로고
    • Application of evolutionary algorithms for the planning of urban distribution networks of medium voltage
    • Aug
    • E. Diaz-Dorado, J. Cidrás, and E. Miguez, "Application of evolutionary algorithms for the planning of urban distribution networks of medium voltage," IEEE Trans. Power Syst., vol. 17, no. 3, pp. 879-884, Aug. 2002.
    • (2002) IEEE Trans. Power Syst , vol.17 , Issue.3 , pp. 879-884
    • Diaz-Dorado, E.1    Cidrás, J.2    Miguez, E.3
  • 14
    • 0030082092 scopus 로고    scopus 로고
    • Power distribution system planning with reliability modeling and optimization
    • Feb
    • Y. Tang, "Power distribution system planning with reliability modeling and optimization," IEEE Trans. Power Syst., vol. 11, no. 1, pp. 181-189, Feb. 1996.
    • (1996) IEEE Trans. Power Syst , vol.11 , Issue.1 , pp. 181-189
    • Tang, Y.1
  • 15
    • 0028462520 scopus 로고
    • Determination of reliability worth for distribution system planning
    • Jul
    • L. Goel and R. Billinton, "Determination of reliability worth for distribution system planning," IEEE Trans. Power Delivery, vol. 9, no. 3, pp. 1577-1583, Jul. 1994.
    • (1994) IEEE Trans. Power Delivery , vol.9 , Issue.3 , pp. 1577-1583
    • Goel, L.1    Billinton, R.2
  • 17
    • 18944382774 scopus 로고    scopus 로고
    • Integral planning of primary - Secondary distribution system using mixed integer linear programming
    • May
    • P. C. Paiva, H. M. Khodr, J. A. Domínguez-Navarro, J. M. Yusta, and A. J. Urdaneta, "Integral planning of primary - Secondary distribution system using mixed integer linear programming," IEEE Trans. Power Syst., vol. 20, no. 2, pp. 1134-1143, May 2004.
    • (2004) IEEE Trans. Power Syst , vol.20 , Issue.2 , pp. 1134-1143
    • Paiva, P.C.1    Khodr, H.M.2    Domínguez-Navarro, J.A.3    Yusta, J.M.4    Urdaneta, A.J.5
  • 20
    • 34248535424 scopus 로고    scopus 로고
    • Update Comprehensive Plan Snohomish County, WA
    • 10, Online, Available
    • 10 Year Update Comprehensive Plan Snohomish County, WA, 2005, The Future Long-Range Map [Online]. Available: Www.co.snohomish.wa.us
    • (2005) The Future Long-Range Map
    • Year1
  • 21
    • 0019534955 scopus 로고
    • Optimal distribution substation and primary feeder planning via the fixed charge network formulation
    • Mar
    • D. I. Sun, E. R. Farris, P. J. Cote, R. R. Shoults, and M. S. Chen, "Optimal distribution substation and primary feeder planning via the fixed charge network formulation," IEEE Trans. Power Apparat. Syst. vol. 101, no. 3, pp. 602-609, Mar. 1982.
    • (1982) IEEE Trans. Power Apparat. Syst , vol.101 , Issue.3 , pp. 602-609
    • Sun, D.I.1    Farris, E.R.2    Cote, P.J.3    Shoults, R.R.4    Chen, M.S.5
  • 22
    • 0030261388 scopus 로고    scopus 로고
    • Distribution system reliability assessment using hierarchical Markov modeling
    • Oct
    • R. E. Brown, S. Gupta, R. D. Christie, S. S. Venkata, and R. Fletcher, "Distribution system reliability assessment using hierarchical Markov modeling," IEEE Trans. Power Delivery, vol. 11, no. 4, pp. 1929-1934, Oct. 1996.
    • (1996) IEEE Trans. Power Delivery , vol.11 , Issue.4 , pp. 1929-1934
    • Brown, R.E.1    Gupta, S.2    Christie, R.D.3    Venkata, S.S.4    Fletcher, R.5
  • 23
    • 0018543803 scopus 로고
    • Modeling and evaluating the reliability of distribution systems
    • Dec
    • R. N. Allan, E. N. Dialynas, and I. R. Homer, "Modeling and evaluating the reliability of distribution systems," IEEE Trans. Power Apparat. Syst., vol. 98, no. 6, pp. 2181-2189, Dec. 1979.
    • (1979) IEEE Trans. Power Apparat. Syst , vol.98 , Issue.6 , pp. 2181-2189
    • Allan, R.N.1    Dialynas, E.N.2    Homer, I.R.3
  • 25
    • 31144442917 scopus 로고    scopus 로고
    • Economic costs of power interruptions: A consistent model and methodology
    • Jan
    • R. F. Ghajar and R. Billinton, "Economic costs of power interruptions: A consistent model and methodology," J. Elect. Power Energy Syst. vol. 28, no. 1, pp. 29-35, Jan. 2006.
    • (2006) J. Elect. Power Energy Syst , vol.28 , Issue.1 , pp. 29-35
    • Ghajar, R.F.1    Billinton, R.2
  • 26
    • 0035506757 scopus 로고    scopus 로고
    • Impact of two-stage service restoration on distribution reliability
    • Nov
    • R. E. Brown and A. P. Hanson, "Impact of two-stage service restoration on distribution reliability," IEEE Trans. Power Syst., vol. 16, no. 4, pp. 624-629, Nov. 2001.
    • (2001) IEEE Trans. Power Syst , vol.16 , Issue.4 , pp. 624-629
    • Brown, R.E.1    Hanson, A.P.2
  • 27
    • 0345258419 scopus 로고    scopus 로고
    • Switch placement to improve system reliability for radial distribution systems with distributed generation
    • Nov
    • Y. Mao and K. N. Miu, "Switch placement to improve system reliability for radial distribution systems with distributed generation," IEEE Trans. Power Syst., vol. 18, no. 4, pp. 1346-1352, Nov. 2003.
    • (2003) IEEE Trans. Power Syst , vol.18 , Issue.4 , pp. 1346-1352
    • Mao, Y.1    Miu, K.N.2
  • 28
    • 34248568299 scopus 로고    scopus 로고
    • Optimal distribution system horizon planning part II: Application
    • R. H. Fletcher and K. Strunz, "Optimal distribution system horizon planning part II: Application," IEEE Trans. Power Syst., 2006.
    • (2006) IEEE Trans. Power Syst
    • Fletcher, R.H.1    Strunz, K.2
  • 30
    • 34248508112 scopus 로고    scopus 로고
    • Optimization Toolbox for Use with MATLAB® The Math Works, Inc, Online, Available
    • Optimization Toolbox for Use with MATLAB® The Math Works, Inc., Natick, MA, 2004 [Online]. Available: http://www.mathworks.com
    • (2004)
    • Natick, M.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.