Volumn 28, Issue 1, 2006, Pages 29-35

Economic costs of power interruptions: A consistent model and methodology

Author keywords

Customer outage data; Power system economics; Reliability of power systems

Indexed keywords

COST BENEFIT ANALYSIS; COSTS; MATHEMATICAL MODELS; POWER CONTROL; PROBABILITY; RELIABILITY THEORY;

EID: 31144442917     PISSN: 01420615     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijepes.2005.09.003     Document Type: Article
Times cited : (72)

References (23)
  • 1
    • 0018544097 scopus 로고
    • IEEE reliability test system
    • A report prepared by the reliability test system task force of the application of probability methods subcommittee, 'IEEE reliability test system'. IEEE Trans PAS 1979;PAS-98(6):2047-54.
    • (1979) IEEE Trans PAS , vol.PAS-98 , Issue.6 , pp. 2047-2054
  • 2
    • 0020749590 scopus 로고
    • Consumer interruption costing for reliability cost/benefit evaluation
    • W.P. Poore, S.R. Greene, and M.A. Kdiasha Consumer interruption costing for reliability cost/benefit evaluation IEEE Trans PAS 102 1983 1361 1364
    • (1983) IEEE Trans PAS , vol.102 , pp. 1361-1364
    • Poore, W.P.1    Greene, S.R.2    Kdiasha, M.A.3
  • 3
    • 0023979713 scopus 로고
    • Cost/benefit approach to establish adequacy level for generating system planning
    • J. Oteng-Adjei, and R. Billinton Cost/benefit approach to establish adequacy level for generating system planning IEE Proc Part C 135 2 1988
    • (1988) IEE Proc Part C , vol.135 , Issue.2
    • Oteng-Adjei, J.1    Billinton, R.2
  • 4
    • 0026205965 scopus 로고
    • Utilization of interrupted energy assessment rates in generation and transmission system planning
    • R. Billinton, and J. Oteng-Adjei Utilization of interrupted energy assessment rates in generation and transmission system planning IEEE Trans PWRS 6 3 1991 1245 1253
    • (1991) IEEE Trans PWRS , vol.6 , Issue.3 , pp. 1245-1253
    • Billinton, R.1    Oteng-Adjei, J.2
  • 5
    • 0028371744 scopus 로고
    • Evaluation of the marginal outage costs of generating systems for the purposes of spot pricing
    • R. Billinton, and R. Ghajar Evaluation of the marginal outage costs of generating systems for the purposes of spot pricing IEEE Trans PWRS 9 1 1994 68 75
    • (1994) IEEE Trans PWRS , vol.9 , Issue.1 , pp. 68-75
    • Billinton, R.1    Ghajar, R.2
  • 6
    • 0025901557 scopus 로고
    • Assessment of electric service reliability worth. Proceedings of the third international conference on probabilistic methods applied to electric power systems
    • London, UK; July
    • Billinton R, Tollefson G, Wacker G. Assessment of electric service reliability worth. Proceedings of the third international conference on probabilistic methods applied to electric power systems. IEE conference publication no. 338, London, UK; July 1991. p. 9-14.
    • (1991) IEE Conference Publication No. 338 , vol.338 , pp. 9-14
    • Billinton, R.1    Tollefson, G.2    Wacker, G.3
  • 7
    • 0023399871 scopus 로고
    • Comparison of two alternate methods to establish an interrupted energy assessment rate
    • R. Billinton, I. Oteng-Adjei, and R. Ghajar Comparison of two alternate methods to establish an interrupted energy assessment rate IEEE Trans PWRS 2 3 1987 751 757
    • (1987) IEEE Trans PWRS , vol.2 , Issue.3 , pp. 751-757
    • Billinton, R.1    Oteng-Adjei, I.2    Ghajar, R.3
  • 8
    • 0025517053 scopus 로고
    • Evaluation of interrupted energy assessment rates in composite systems
    • J. Oteng-Adjei, and R. Billinton Evaluation of interrupted energy assessment rates in composite systems IEEE Trans PWRS 5 4 1990 1317 1323
    • (1990) IEEE Trans PWRS , vol.5 , Issue.4 , pp. 1317-1323
    • Oteng-Adjei, J.1    Billinton, R.2
  • 9
    • 0024103858 scopus 로고
    • Bibliography on the application of probability methods in power system reliability evaluation
    • R.N. Allan, R. Billinton, S.M. Shahidehpour, and C. Singh Bibliography on the application of probability methods in power system reliability evaluation IEEE Trans PWRS 3 1988 1555 1564
    • (1988) IEEE Trans PWRS , vol.3 , pp. 1555-1564
    • Allan, R.N.1    Billinton, R.2    Shahidehpour, S.M.3    Singh, C.4
  • 11
    • 0020335999 scopus 로고
    • Economic costs of electricity supply interruptions: US and foreign experience
    • A.P. Sanghvi Economic costs of electricity supply interruptions: US and foreign experience Energy Econ 4 3 1982 180 198
    • (1982) Energy Econ , vol.4 , Issue.3 , pp. 180-198
    • Sanghvi, A.P.1
  • 12
    • 33747814223 scopus 로고
    • Ontario hydro surveys on power system reliability: Summary of customer viewpoints
    • 700 University Avenue, Toronto, Canada
    • Skof LV. Ontario hydro surveys on power system reliability: summary of customer viewpoints, Ontario hydro report R&MR 80-12, 700 University Avenue, Toronto, Canada; 1980.
    • (1980) Ontario Hydro Report R&MR 80-12
    • Skof, L.V.1
  • 13
    • 31144463003 scopus 로고
    • EPRI report, value of service reliability to consumers
    • Palo Alto, CA: Criterion Inc., May
    • EPRI report, value of service reliability to consumers. Electric Power Research Institute, Report EA-4495. Palo Alto, CA: Criterion Inc., May 1986.
    • (1986) Electric Power Research Institute, Report , vol.EA-4495
  • 15
    • 0023340840 scopus 로고
    • Canadian electrical association. R&D project 309, U403 report, suite 500, One Westmount Square, Montreal, Quebec, Canada; May
    • Billinton R, Wacker G, Brewer R. Farm losses resulting from electric service interruptions. Canadian electrical association. R&D project 309, U403 report, suite 500, One Westmount Square, Montreal, Quebec, Canada; May 1987.
    • (1987) Farm Losses Resulting from Electric Service Interruptions
    • Billinton, R.1    Wacker, G.2    Brewer, R.3
  • 16
    • 0011880914 scopus 로고
    • Reliability of electricity supply, outage costs and value of service: An overview
    • M. Munasinghe, and A. Sanghvi Reliability of electricity supply, outage costs and value of service: an overview Energy J 9 1988 1 18 [Special Issue on Electricity Reliability]
    • (1988) Energy J , vol.9 , pp. 1-18
    • Munasinghe, M.1    Sanghvi, A.2
  • 17
    • 31144478472 scopus 로고
    • A Canadian customer survey to assess power system reliability worth
    • Paper 93 WM 175-0 PWRS accepted and presented at the January 31-February 5, Columbus, OH
    • Tollefson G, Billinton R, Wacker G, Chan E, Aweya J. A Canadian customer survey to assess power system reliability worth. Paper 93 WM 175-0 PWRS accepted and presented at the 1993 IEEE winter meeting, January 31-February 5, Columbus, OH; 1993.
    • (1993) 1993 IEEE Winter Meeting
    • Tollefson, G.1    Billinton, R.2    Wacker, G.3    Chan, E.4    Aweya, J.5
  • 18
    • 0020764469 scopus 로고
    • Comprehensive bibliography on electrical service interruption costs
    • R. Billinton, G. Wacker, and E. Wojczynski Comprehensive bibliography on electrical service interruption costs IEEE Trans PAS PAS-102 1983 1831 1837
    • (1983) IEEE Trans PAS , vol.PAS-102 , pp. 1831-1837
    • Billinton, R.1    Wacker, G.2    Wojczynski, E.3
  • 19
    • 0026258774 scopus 로고
    • Comprehensive bibliography on reliability worth and electrical service consumer interruption costs: 1980-1990
    • G. Tollefson, R. Billinton, and G. Wacker Comprehensive bibliography on reliability worth and electrical service consumer interruption costs: 1980-1990 IEEE Trans PWRS 6 4 1991 1508 1514
    • (1991) IEEE Trans PWRS , vol.6 , Issue.4 , pp. 1508-1514
    • Tollefson, G.1    Billinton, R.2    Wacker, G.3
  • 21
    • 0018998466 scopus 로고
    • Overall approach to the reliability evaluation of composite generation and transmission systems
    • T.K.P. Medicherla, and R. Billinton Overall approach to the reliability evaluation of composite generation and transmission systems IEE Proc Part C 127 2 1980 72 81
    • (1980) IEE Proc Part C , vol.127 , Issue.2 , pp. 72-81
    • Medicherla, T.K.P.1    Billinton, R.2
  • 22
    • 0018544838 scopus 로고
    • Generation rescheduling and load shedding to alleviate line overloads-analysis
    • M.S. Sachdev, T.K.P. Medicherla, and R. Billinton Generation rescheduling and load shedding to alleviate line overloads-analysis IEEE Trans PAS PAS-98 1979 1876 1884
    • (1979) IEEE Trans PAS , vol.PAS-98 , pp. 1876-1884
    • Sachdev, M.S.1    Medicherla, T.K.P.2    Billinton, R.3
  • 23
    • 31144432742 scopus 로고
    • Pertinent factors in the adequacy assessment of composite generation and transmission systems
    • March
    • Billinton R, Kumar S. Pertinent factors in the adequacy assessment of composite generation and transmission systems. Canadian electrical association paper No. 86-SP-141, vol. 25, Part 3; March 1986.
    • (1986) Canadian Electrical Association Paper No. 86-SP-141 , vol.25 , Issue.3 PART
    • Billinton, R.1    Kumar, S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.