Volumn 25, Issue 5, 2007, Pages 527-540

Commitment, coordination, competence and the iron triangle

Author keywords

Commitment; Competence; Coordination; Factor analysis; Iron triangle; Multinomial logistic regression

Indexed keywords

COMPETITION; CONSTRUCTION INDUSTRY; COST BENEFIT ANALYSIS; QUALITY CONTROL; REGRESSION ANALYSIS;

EID: 34248380532     PISSN: 02637863     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijproman.2006.11.009     Document Type: Article
Times cited : (166)

References (42)
  • 1
    • 0033177685 scopus 로고    scopus 로고
    • Criteria for project success: an exploratory reexamination
    • Lim C.S., and Mohamed M.Z. Criteria for project success: an exploratory reexamination. Int J Project Manage 17 4 (1999) 243-248
    • (1999) Int J Project Manage , vol.17 , Issue.4 , pp. 243-248
    • Lim, C.S.1    Mohamed, M.Z.2
  • 2
    • 0032595622 scopus 로고    scopus 로고
    • Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria
    • Atkinson R. Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria. Int J Project Manage 17 6 (1999) 337-342
    • (1999) Int J Project Manage , vol.17 , Issue.6 , pp. 337-342
    • Atkinson, R.1
  • 4
    • 0001980630 scopus 로고
    • The determinants of construction project success
    • Ashley D., Jaselskis E., and Lurie C.B. The determinants of construction project success. Project Manage J 18 2 (1987) 69-79
    • (1987) Project Manage J , vol.18 , Issue.2 , pp. 69-79
    • Ashley, D.1    Jaselskis, E.2    Lurie, C.B.3
  • 5
    • 0002978067 scopus 로고
    • Measuring project success
    • Freeman M., and Beale P. Measuring project success. Project Manage J 23 1 (1992) 8-17
    • (1992) Project Manage J , vol.23 , Issue.1 , pp. 8-17
    • Freeman, M.1    Beale, P.2
  • 6
    • 34248398993 scopus 로고    scopus 로고
    • Iyer KC. Identification and evaluation of dispute-prone clauses in Indian construction contracts. A doctoral thesis. Indian Institute of Technology, Madras, 1996.
  • 7
    • 0001926526 scopus 로고
    • Critical success factors across the project life cycle
    • Pinto J.K., and Slevin D.P. Critical success factors across the project life cycle. Project Manage J19 3 (1988) 67-74
    • (1988) Project Manage , vol.J19 , Issue.3 , pp. 67-74
    • Pinto, J.K.1    Slevin, D.P.2
  • 8
    • 33644487466 scopus 로고
    • Issues affecting motivation on construction projects
    • Mansfield N.R., and Odeh N.S. Issues affecting motivation on construction projects. Int J Project Manage 9 2 (1991) 93-98
    • (1991) Int J Project Manage , vol.9 , Issue.2 , pp. 93-98
    • Mansfield, N.R.1    Odeh, N.S.2
  • 9
    • 0032688614 scopus 로고    scopus 로고
    • Critical success factors for different project objectives
    • Chua D.K.H., Kog Y.C., and Loh P.K. Critical success factors for different project objectives. J Construct Eng Manage 125 3 (1999) 142-150
    • (1999) J Construct Eng Manage , vol.125 , Issue.3 , pp. 142-150
    • Chua, D.K.H.1    Kog, Y.C.2    Loh, P.K.3
  • 10
    • 0042861750 scopus 로고
    • Why does project management fail?
    • Avots I. Why does project management fail?. California Manage Rev 12 1 (1969) 77-82
    • (1969) California Manage Rev , vol.12 , Issue.1 , pp. 77-82
    • Avots, I.1
  • 11
    • 0041859693 scopus 로고
    • Why projects fail: the effects of ignoring the obvious
    • Hughes M.W. Why projects fail: the effects of ignoring the obvious. Ind Eng 18 (1986) 14-18
    • (1986) Ind Eng , vol.18 , pp. 14-18
    • Hughes, M.W.1
  • 14
    • 0347059986 scopus 로고    scopus 로고
    • The role of contract type in the success of R&D defense projects under increasing uncertainty
    • Sadeh A., Dvir D., and Shenhar A. The role of contract type in the success of R&D defense projects under increasing uncertainty. Project Manage J31 3 (2000) 14-22
    • (2000) Project Manage , vol.J31 , Issue.3 , pp. 14-22
    • Sadeh, A.1    Dvir, D.2    Shenhar, A.3
  • 15
    • 0036165171 scopus 로고    scopus 로고
    • Incentive mechanisms for project success
    • Bower D., Ashby G., Gerald K., and Smyk W. Incentive mechanisms for project success. J Manage Eng 18 1 (2002) 37-43
    • (2002) J Manage Eng , vol.18 , Issue.1 , pp. 37-43
    • Bower, D.1    Ashby, G.2    Gerald, K.3    Smyk, W.4
  • 16
    • 84993069513 scopus 로고    scopus 로고
    • Model for predicting client's contribution to project success
    • Lim E.H., and Ling F.Y.Y. Model for predicting client's contribution to project success. Eng Construct Architect Manage 9 5/6 (2002) 388-395
    • (2002) Eng Construct Architect Manage , vol.9 , Issue.5-6 , pp. 388-395
    • Lim, E.H.1    Ling, F.Y.Y.2
  • 17
    • 0037294151 scopus 로고    scopus 로고
    • An empirical analysis of the relationship between project planning and project success
    • Dvir D., Raz T., and Shenhar A.J. An empirical analysis of the relationship between project planning and project success. Int J Project Manage 21 2 (2003) 89-95
    • (2003) Int J Project Manage , vol.21 , Issue.2 , pp. 89-95
    • Dvir, D.1    Raz, T.2    Shenhar, A.J.3
  • 18
    • 0006822095 scopus 로고
    • The changing role of the information systems executive: a critical success factors perspective
    • Rockart J.F. The changing role of the information systems executive: a critical success factors perspective. Sloan Manage Rev Fall (1982) 3-13
    • (1982) Sloan Manage Rev , Issue.Fall , pp. 3-13
    • Rockart, J.F.1
  • 19
    • 3242680143 scopus 로고    scopus 로고
    • Selection criteria
    • Rowlinson S., and McDermott P. (Eds), E and F.N. Spon, London
    • Rowlinson S. Selection criteria. In: Rowlinson S., and McDermott P. (Eds). Procurement systems: a guide to best practice (1999), E and F.N. Spon, London 276-299
    • (1999) Procurement systems: a guide to best practice , pp. 276-299
    • Rowlinson, S.1
  • 20
    • 2442534713 scopus 로고    scopus 로고
    • Development of the SMART project planning framework
    • Hartman F., and Ashrafi R. Development of the SMART project planning framework. Int J Project Manage 22 6 (2004) 499-510
    • (2004) Int J Project Manage , vol.22 , Issue.6 , pp. 499-510
    • Hartman, F.1    Ashrafi, R.2
  • 21
    • 34248392469 scopus 로고    scopus 로고
    • Standish group report, 2003. Available from http://www.standishgroup.com.
  • 22
    • 12344319409 scopus 로고    scopus 로고
    • Critical success factors for public-private partnerships in infrastructure development
    • Zhang X. Critical success factors for public-private partnerships in infrastructure development. J Constr Eng Manage 131 1 (2005) 3-14
    • (2005) J Constr Eng Manage , vol.131 , Issue.1 , pp. 3-14
    • Zhang, X.1
  • 23
    • 34248383417 scopus 로고    scopus 로고
    • Abraham GL. Critical success factors for the construction industry. In: Proc, construction research congress in construction-wind of change: integration and innovation (CD-ROM). Construction Institute-Construction Research Council, ASCE, Univ. of Colorado at Boulder, Boulder, Colo, 2003.
  • 24
    • 33746190774 scopus 로고    scopus 로고
    • Critical Factors affecting schedule performance: evidence from Indian construction projects
    • Iyer K.C., and Jha K.N. Critical Factors affecting schedule performance: evidence from Indian construction projects. ASCE J Constr Eng Manage 132 8 (2006) 871-881
    • (2006) ASCE J Constr Eng Manage , vol.132 , Issue.8 , pp. 871-881
    • Iyer, K.C.1    Jha, K.N.2
  • 25
    • 34248325459 scopus 로고    scopus 로고
    • Jha KN, Iyer KC. Critical factors affecting schedule performance of Indian construction projects. In: International conference on construction project management - ICCPM, 5 March 2004. p. 71-80.
  • 26
    • 34248371846 scopus 로고    scopus 로고
    • Jha KN, Iyer KC. Critical factors affecting quality of Indian construction projects. In: 1st international conference on world of construction project management WCPM, 27-28 May 2004. p. 101-14.
  • 27
    • 18144374111 scopus 로고    scopus 로고
    • Factors affecting cost performance: evidence from Indian construction projects
    • Iyer K.C., and Jha K.N. Factors affecting cost performance: evidence from Indian construction projects. Int J Project Manage 23 4 (2005) 283-295
    • (2005) Int J Project Manage , vol.23 , Issue.4 , pp. 283-295
    • Iyer, K.C.1    Jha, K.N.2
  • 28
    • 34248342041 scopus 로고    scopus 로고
    • Whitehead J. 1998. Available from: http://www.personal.ecu.edu/whiteheadj.
  • 29
    • 34248349325 scopus 로고    scopus 로고
    • SPSS 9.0.0. SPSS Inc., Headquarters, 233 S. Wacker Drive, 11th floor, Chicago, IL, 60606. Available from: http://www.spss.com.
  • 30
    • 33646078907 scopus 로고    scopus 로고
    • Critical determinants of project coordination
    • Jha K.N., and Iyer K.C. Critical determinants of project coordination. Int J Project Manage 24 4 (2006) 314-322
    • (2006) Int J Project Manage , vol.24 , Issue.4 , pp. 314-322
    • Jha, K.N.1    Iyer, K.C.2
  • 32
    • 84937315389 scopus 로고
    • Constructive conflict resolution: principles, training and research
    • Deutsch M. Constructive conflict resolution: principles, training and research. J Social Issues 50 1 (1994) 13-32
    • (1994) J Social Issues , vol.50 , Issue.1 , pp. 13-32
    • Deutsch, M.1
  • 33
    • 0029373930 scopus 로고
    • Conceptual model of partnering
    • Crowley L.G., and Karim Md.A. Conceptual model of partnering. J Manage Eng 11 5 (1995) 33-39
    • (1995) J Manage Eng , vol.11 , Issue.5 , pp. 33-39
    • Crowley, L.G.1    Karim, Md.A.2
  • 34
    • 0032758739 scopus 로고    scopus 로고
    • Conflict management styles in Hong Kong industries
    • Cheung C.C., and Chuah K.B. Conflict management styles in Hong Kong industries. Int J Project Manage 17 6 (1999) 393-399
    • (1999) Int J Project Manage , vol.17 , Issue.6 , pp. 393-399
    • Cheung, C.C.1    Chuah, K.B.2
  • 35
    • 0032071640 scopus 로고    scopus 로고
    • Consequences of construction conflict: a Hong Kong perspective
    • Kumaraswamy M.M. Consequences of construction conflict: a Hong Kong perspective. J Manage Eng 14 3 (1998) 66-74
    • (1998) J Manage Eng , vol.14 , Issue.3 , pp. 66-74
    • Kumaraswamy, M.M.1
  • 36
    • 0035155488 scopus 로고    scopus 로고
    • Effect of interorganizational teamwork on project outcome
    • Chan A.P.C., Ho D.C.K., and Tam C.M. Effect of interorganizational teamwork on project outcome. J Manage Eng 17 1 (2001) 34-40
    • (2001) J Manage Eng , vol.17 , Issue.1 , pp. 34-40
    • Chan, A.P.C.1    Ho, D.C.K.2    Tam, C.M.3
  • 37
    • 0035581097 scopus 로고    scopus 로고
    • Building project scope definition using project definition rating index
    • Cho C.S., and Gibson G.E. Building project scope definition using project definition rating index. J Architect Eng 7 4 (2001) 115-125
    • (2001) J Architect Eng , vol.7 , Issue.4 , pp. 115-125
    • Cho, C.S.1    Gibson, G.E.2
  • 38
    • 0031078243 scopus 로고    scopus 로고
    • A comparative study of causes of time overruns in Hong Kong construction projects
    • Chan D.W.M., and Kumaraswamy M.M. A comparative study of causes of time overruns in Hong Kong construction projects. Int J Project Manage 15 1 (1997) 55-63
    • (1997) Int J Project Manage , vol.15 , Issue.1 , pp. 55-63
    • Chan, D.W.M.1    Kumaraswamy, M.M.2
  • 39
    • 2542502330 scopus 로고    scopus 로고
    • Model for predicting performance of architects and engineers
    • Ling Y.Y. Model for predicting performance of architects and engineers. J Construct Eng Manage 128 5 (2002) 446-453
    • (2002) J Construct Eng Manage , vol.128 , Issue.5 , pp. 446-453
    • Ling, Y.Y.1
  • 42
    • 84993047123 scopus 로고    scopus 로고
    • Critical success factors of the BOOT procurement system: reflections from the stadium Australia case study
    • Jefferies M., Gameson R., and Rowlinson S. Critical success factors of the BOOT procurement system: reflections from the stadium Australia case study. Eng Construct Architect Manage 9 4 (2002) 352
    • (2002) Eng Construct Architect Manage , vol.9 , Issue.4 , pp. 352
    • Jefferies, M.1    Gameson, R.2    Rowlinson, S.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.