메뉴 건너뛰기




Volumn 182, Issue 2, 2007, Pages 936-944

Rescheduling with release dates to minimize makespan under a limit on the maximum sequence disruption

Author keywords

Disruption; Makespan; NP hard; Release dates; Rescheduling; Single machine

Indexed keywords

INDUSTRIAL MANAGEMENT; JOB ANALYSIS; OPERATIONS RESEARCH; POLYNOMIALS; PROBLEM SOLVING;

EID: 34247463767     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2006.07.026     Document Type: Article
Times cited : (48)

References (7)
  • 3
    • 19744366708 scopus 로고    scopus 로고
    • Rescheduling for new orders
    • Hall N.G., and Poots C.N. Rescheduling for new orders. Operations Research 52 (2004) 440-453
    • (2004) Operations Research , vol.52 , pp. 440-453
    • Hall, N.G.1    Poots, C.N.2
  • 5
    • 0031525145 scopus 로고    scopus 로고
    • Rescheduling on a single machine with part-type depend setup times and deadlines
    • Unal A.T., Uzsoy R., and Kiran A.S. Rescheduling on a single machine with part-type depend setup times and deadlines. Annals of Operations Research 70 (1997) 93-113
    • (1997) Annals of Operations Research , vol.70 , pp. 93-113
    • Unal, A.T.1    Uzsoy, R.2    Kiran, A.S.3
  • 6
    • 0042156822 scopus 로고
    • A rescheduling procedure for manufacturing systems under random disruptions
    • Fandel G., Gulledge T., and Jone A. (Eds), Springer, Berlin, Germany
    • Wu S.D., Storer R.H., and Chang P.C. A rescheduling procedure for manufacturing systems under random disruptions. In: Fandel G., Gulledge T., and Jone A. (Eds). New Directions for Operations Research in Manufacturing (1992), Springer, Berlin, Germany 292-308
    • (1992) New Directions for Operations Research in Manufacturing , pp. 292-308
    • Wu, S.D.1    Storer, R.H.2    Chang, P.C.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.