메뉴 건너뛰기




Volumn , Issue , 2006, Pages

Security criteria for planning and operation in the new GB market

Author keywords

Power system operation; Power system security; Transmission system investment planning

Indexed keywords

ELECTRICITY TRADING; INVESTMENT PLANNING; NETWORK INVESTMENT; POWER SYSTEM OPERATIONS; POWER SYSTEM SECURITY; SECURITY CRITERION; SECURITY STANDARDS; TRANSMISSION SYSTEMS;

EID: 84876751513     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (4)

References (8)
  • 2
    • 84876758375 scopus 로고    scopus 로고
    • September 1st, Available
    • "The System Operator Transmission Owner Code", September 1st 2004. Available: http://www.nationalgrid.com/uk/Electricity/Codes/sotocode/.
    • (2004) The System Operator Transmission Owner Code
  • 6
    • 84876763860 scopus 로고    scopus 로고
    • Planning for the integration of on-shore renewable generation for the gb transmission system
    • Paper C1-114, Paris
    • S.A. Wood, C.H. Bayfield, A.P. Hiorns and Chandra Trikha, "Planning for the Integration of On-shore Renewable Generation for the GB Transmission System", Paper C1-114, Proc CIGRE 2006, Paris.
    • (2006) Proc CIGRE
    • Wood, S.A.1    Bayfield, C.H.2    Hiorns, A.P.3    Trikha, C.4
  • 7
    • 84876775867 scopus 로고    scopus 로고
    • The sufficiency of transmission capacity to accommodate wind farms and manage security of supply
    • Paper C1-112, Paris
    • K.R.W. Bell, "The sufficiency of transmission capacity to accommodate wind farms and manage security of supply", Paper C1-112, Proc CIGRE 2006, Paris.
    • (2006) Proc CIGRE
    • Bell, K.R.W.1
  • 8
    • 33847227583 scopus 로고    scopus 로고
    • Available
    • National Grid Company plc, "GB Seven Year Statement May 2005", 2005. Available: http://www.nationalgrid.com/uk/library/documents/sys05/default. asp .
    • (2005) GB Seven Year Statement May 2005


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.