-
1
-
-
0022667867
-
Optimal control of production rate in a failure-prone manufacturing system
-
Akella, R., & Kumar, P. R. (1986). Optimal control of production rate in a failure-prone manufacturing system. IEEE Transactions on Automatic Control AC-31, 116-126.
-
(1986)
IEEE Transactions on Automatic Control AC-31
, pp. 116-126
-
-
Akella, R.1
Kumar, P.R.2
-
2
-
-
0031351620
-
Issues in the use, design and evolution of process scheduling and planning systems
-
Applequist, G., Samikoglu, O., Pekny, J., & Reklaitis, G. (1997). Issues in the use, design and evolution of process scheduling and planning systems. ISA Transactions 36 (2), 81-121.
-
(1997)
ISA Transactions
, vol.36
, Issue.2
, pp. 81-121
-
-
Applequist, G.1
Samikoglu, O.2
Pekny, J.3
Reklaitis, G.4
-
3
-
-
0037081993
-
Scheduling to minimize expected completion time in flowshop plants with uncertain processing times
-
Balasubramanian, J., & Grossmann, I. E. (2002). Scheduling to minimize expected completion time in flowshop plants with uncertain processing times. Computers and Chemical Engineering 26, 41-57.
-
(2002)
Computers and Chemical Engineering
, vol.26
, pp. 41-57
-
-
Balasubramanian, J.1
Grossmann, I.E.2
-
4
-
-
0031146289
-
Using detailed scheduling to obtain realistic operating policies for a batch processing facility
-
Bassett, M. H., Pekny, J. F., & Reklaitis, G. V. (1997). Using detailed scheduling to obtain realistic operating policies for a batch processing facility. Industrial Engineering and Chemical Research 36 (5), 1717-1726.
-
(1997)
Industrial Engineering and Chemical Research
, vol.36
, Issue.5
, pp. 1717-1726
-
-
Bassett, M.H.1
Pekny, J.F.2
Reklaitis, G.V.3
-
7
-
-
0024037430
-
Optimality of zero-inventory policies for unreliable manufacturing systems
-
Bielecki, T. R., & Kumar, P. R. (1988). Optimality of zero-inventory policies for unreliable manufacturing systems. Operations Research 36, 532-541.
-
(1988)
Operations Research
, vol.36
, pp. 532-541
-
-
Bielecki, T.R.1
Kumar, P.R.2
-
8
-
-
21844522926
-
Minimax production planning in failure prone manufacturing systems
-
Boukas, E. K., Yang, H., & Zhang, Q. (1995). Minimax production planning in failure prone manufacturing systems. Journal of Optimal Theory Applied 87, 269-286.
-
(1995)
Journal of Optimal Theory Applied
, vol.87
, pp. 269-286
-
-
Boukas, E.K.1
Yang, H.2
Zhang, Q.3
-
12
-
-
0034387708
-
Mid-term supply chain planning under demand uncertainty: Customer demand satisfaction and inventory management
-
Gupta, A., Maranas, C. D., & McDonald, C. M. (2000). Mid-term supply chain planning under demand uncertainty: customer demand satisfaction and inventory management. Computers and Chemical Engineering 24 (12), 2613-2621.
-
(2000)
Computers and Chemical Engineering
, vol.24
, Issue.12
, pp. 2613-2621
-
-
Gupta, A.1
Maranas, C.D.2
McDonald, C.M.3
-
14
-
-
0025484857
-
Numerical methods for stochastic control problems in continuous time
-
Kushner, H. J. (1990). Numerical methods for stochastic control problems in continuous time. SIAM Journal of Control Optimization 28, 999-1048.
-
(1990)
SIAM Journal of Control Optimization
, vol.28
, pp. 999-1048
-
-
Kushner, H.J.1
-
17
-
-
0142103386
-
-
Helsinki, Finland: Fapet Oy
-
Leiviskä, K. (1999). Process control. Helsinki, Finland: Fapet Oy.
-
(1999)
Process Control
-
-
Leiviskä, K.1
-
18
-
-
0031271861
-
Multiperiod planning and scheduling of multiproduct batch plants under demand uncertainty
-
Petkov, S. B., & Mararas, C. D. (1997). Multiperiod planning and scheduling of multiproduct batch plants under demand uncertainty. Industrial and Engineering Chemistry Research 36 (11), 4864-4881.
-
(1997)
Industrial and Engineering Chemistry Research
, vol.36
, Issue.11
, pp. 4864-4881
-
-
Petkov, S.B.1
Mararas, C.D.2
-
20
-
-
0028710489
-
Using stochastic optimization to determine threshold values for control of unreliable manufacturing systems
-
Yan, H. M., Yin, G., & Lou, S. X. C. (1994). Using stochastic optimization to determine threshold values for control of unreliable manufacturing systems. Journal of Optimal Theory Applied 83, 511-539.
-
(1994)
Journal of Optimal Theory Applied
, vol.83
, pp. 511-539
-
-
Yan, H.M.1
Yin, G.2
Lou, S.X.C.3
-
21
-
-
0142039886
-
Control of singularly perturbed Markov chains: A numerical study
-
formerly Journal of Australian Mathematics Society Series B: Applied Mathematics
-
Yang, H., Yin, G., Yin, K., & Zhang, Q. (2003). Control of singularly perturbed Markov chains: a numerical study. The ANZIAM Journal 45, 49-74 (formerly Journal of Australian Mathematics Society Series B: Applied Mathematics).
-
(2003)
The ANZIAM Journal
, vol.45
, pp. 49-74
-
-
Yang, H.1
Yin, G.2
Yin, K.3
Zhang, Q.4
-
22
-
-
0012499158
-
Approximating the optimal threshold levels under robustness cost criteria for stochastic manufacturing systems
-
Yin, K., Yin, G., & Zhang, Q. (1995). Approximating the optimal threshold levels under robustness cost criteria for stochastic manufacturing systems. Proceedings of the IFAC Conference of Youth Automation YAC '95, 450-454.
-
(1995)
Proceedings of the IFAC Conference of Youth Automation YAC '95
, pp. 450-454
-
-
Yin, K.1
Yin, G.2
Zhang, Q.3
-
23
-
-
0012498619
-
-
Proceedings of the 1996 AMS-SIAM summer seminar in applied mathematics, lectures in applied mathematics. Providence, RI: American Mathematics Society
-
Yin, G., & Zhang, Q. (1997). Mathematics of stochastic manufacturing systems, Proceedings of the 1996 AMS-SIAM summer seminar in applied mathematics, lectures in applied mathematics. Providence, RI: American Mathematics Society.
-
(1997)
Mathematics of Stochastic Manufacturing Systems
-
-
Yin, G.1
Zhang, Q.2
-
25
-
-
0001626290
-
Turnpike sets in stochastic manufacturing systems with finite time horizon
-
Zhang, Q., & Yin, G. (1994). Turnpike sets in stochastic manufacturing systems with finite time horizon. Stochastics Stochastic Report 51, 11-40.
-
(1994)
Stochastics Stochastic Report
, vol.51
, pp. 11-40
-
-
Zhang, Q.1
Yin, G.2
-
26
-
-
0035279197
-
Optimal control of a marketing-production system
-
Zhang, Q., Yin, G., & Boukas, E. K. (2001). Optimal control of a marketing-production system. IEEE Transactions on Automatic Control 46, 416-427.
-
(2001)
IEEE Transactions on Automatic Control
, vol.46
, pp. 416-427
-
-
Zhang, Q.1
Yin, G.2
Boukas, E.K.3
|