메뉴 건너뛰기




Volumn 31, Issue 1, 2007, Pages 27-32

Maintenance strategies for generation companies based on game theory

Author keywords

Game theory; Interruptible load; Maintenance for generation companies; Maintenance loss; Maintenance scheduling; Risk loss

Indexed keywords

ELECTRIC POWER SYSTEMS; GAME THEORY; MATHEMATICAL MODELS; SCHEDULING; STARTING; TESTING;

EID: 33847771412     PISSN: 10001026     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (8)

References (11)
  • 1
    • 0032204113 scopus 로고    scopus 로고
    • A practical maintenance scheduling program: Mathematical model and case study
    • CHATTOPADHYAY D. A practical maintenance scheduling program: mathematical model and case study. IEEE Trans on Power Systems, 1997, 13(4): 1475-1480.
    • (1997) IEEE Trans on Power Systems , vol.13 , Issue.4 , pp. 1475-1480
    • Chattopadhyay, D.1
  • 2
    • 3142673927 scopus 로고    scopus 로고
    • A preliminary investigation on the regulation mechanism for maintenance scheduling of generating units in the electricity market environment
    • WANG Jian, WEN Fushuan, YANG Rengang. A preliminary investigation on the regulation mechanism for maintenance scheduling of generating units in the electricity market environment. Automation of Electric Power Systems, 2004, 28(7): 30-34.
    • (2004) Automation of Electric Power Systems , vol.28 , Issue.7 , pp. 30-34
    • Wang, J.1    Wen, F.2    Yang, R.3
  • 3
    • 3142716232 scopus 로고    scopus 로고
    • A preliminary investigation on optimal strategies of maintenance scheduling for generation companies in electricity market
    • WANG Jian, WEN Fushuan, YANG Rengang, et al. A preliminary investigation on optimal strategies of maintenance scheduling for generation companies in electricity market. Power System Technology, 2004, 28(10): 22-27.
    • (2004) Power System Technology , vol.28 , Issue.10 , pp. 22-27
    • Wang, J.1    Wen, F.2    Yang, R.3
  • 4
    • 10444269038 scopus 로고    scopus 로고
    • Development of optimal maintenance strategies for generation companies based on chance constrained programming
    • WANG Jian, WEN Fushuan, YANG Rengang. Development of optimal maintenance strategies for generation companies based on chance constrained programming. Automation of Electric Power Systems, 2004, 28(19): 27-31.
    • (2004) Automation of Electric Power Systems , vol.28 , Issue.19 , pp. 27-31
    • Wang, J.1    Wen, F.2    Yang, R.3
  • 5
    • 8644221344 scopus 로고    scopus 로고
    • Generator condition-based maintenance scheduling of electricity market
    • MENG Fanqiang, XU Keming, WANG Liang, et al. Generator condition-based maintenance scheduling of electricity market. Automation of Electric Power Systems, 2004, 28(17): 41-44.
    • (2004) Automation of Electric Power Systems , vol.28 , Issue.17 , pp. 41-44
    • Meng, F.1    Xu, K.2    Wang, L.3
  • 6
    • 18344365063 scopus 로고    scopus 로고
    • Competitive mechanism for maintenance scheduling of generating units
    • GAO Zhihua, REN Zhen, HUANG Wenying, et al. Competitive mechanism for maintenance scheduling of generating units. Automation of Electric Power Systems, 2005, 29(7): 38-42.
    • (2005) Automation of Electric Power Systems , vol.29 , Issue.7 , pp. 38-42
    • Gao, Z.1    Ren, Z.2    Huang, W.3
  • 7
    • 3643103158 scopus 로고    scopus 로고
    • Unit maintenance scheduling in open access electric power system
    • YAO Yuwang, HANDSCHINE. Unit maintenance scheduling in open access electric power system. IEEE Power Engineering Review, 1998, 18(12): 64-65.
    • (1998) IEEE Power Engineering Review , vol.18 , Issue.12 , pp. 64-65
    • Yao, Y.1    Handschine2
  • 9
    • 33847780855 scopus 로고    scopus 로고
    • Study of linking mechanism between peak load and interruptible load
    • WU Jiguang, LIU Junyong, NIU Huaiping, et al. Study of linking mechanism between peak load and interruptible load. Electric Power, 2005, 38(2): 59-63.
    • (2005) Electric Power , vol.38 , Issue.2 , pp. 59-63
    • Wu, J.1    Liu, J.2    Niu, H.3
  • 10
    • 33847783160 scopus 로고    scopus 로고
    • Market rules (ch. 5 power system reliability), market entry, maintenance and exit manual, and market administration manual
    • Market rules (ch. 5 power system reliability), market entry, maintenance and exit manual, and market administration manual[EB/OL]. [2006-03-05]. http://www.theIMO.com.
    • (2006)
  • 11
    • 17244362609 scopus 로고    scopus 로고
    • Maintenance strategies for generation companies based on the estimation of generation capacity adequacy
    • WANG Jian, WEN Fushuan, YANG Rengang. Maintenance strategies for generation companies based on the estimation of generation capacity adequacy. Automation of Electric Power Systems, 2005, 29(6): 45-50.
    • (2005) Automation of Electric Power Systems , vol.29 , Issue.6 , pp. 45-50
    • Wang, J.1    Wen, F.2    Yang, R.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.