|
Volumn 13, Issue 4, 1998, Pages 1475-1480
|
A practical maintenance scheduling program: mathematical model and case study
|
Author keywords
[No Author keywords available]
|
Indexed keywords
LINEAR PROGRAMMING;
MAINTENANCE;
MATHEMATICAL MODELS;
NUMERICAL ANALYSIS;
OPTIMIZATION;
RELIABILITY;
SCHEDULING;
STRATEGIC PLANNING;
COMPLEX MATHEMATICAL ANALYSIS;
MAINTENANCE SCHEDULING;
ELECTRIC POWER SYSTEMS;
|
EID: 0032204113
PISSN: 08858950
EISSN: None
Source Type: Journal
DOI: 10.1109/59.736293 Document Type: Article |
Times cited : (70)
|
References (15)
|