-
1
-
-
0003560262
-
Performance Analysis of Manufacturing Systems
-
Springer, New York
-
Altiok, T. 1996. Performance Analysis of Manufacturing Systems. Springer Series in Operations Research, Springer, New York.
-
(1996)
Springer Series in Operations Research
-
-
Altiok, T.1
-
3
-
-
0032021594
-
Statistical analysis of downtime severity rates
-
Boyd, A. H., D. Radson. 1998. Statistical analysis of downtime severity rates. Internat. J. Production Res. 36(3) 603-615.
-
(1998)
Internat. J. Production Res
, vol.36
, Issue.3
, pp. 603-615
-
-
Boyd, A.H.1
Radson, D.2
-
4
-
-
84947637958
-
Automatic transfer lines with buffer stocks
-
Buzacott, J. A. 1967. Automatic transfer lines with buffer stocks. Internat. J. Production Res. 5 183-200.
-
(1967)
Internat. J. Production Res
, vol.5
, pp. 183-200
-
-
Buzacott, J.A.1
-
5
-
-
84954971480
-
Models of automatic transfer lines with inventory banks: A review and comparison
-
Buzacott, J. A., L. E. Hanifin. 1978. Models of automatic transfer lines with inventory banks: A review and comparison. AIIE Trans. 10(2) 197-207.
-
(1978)
AIIE Trans
, vol.10
, Issue.2
, pp. 197-207
-
-
Buzacott, J.A.1
Hanifin, L.E.2
-
7
-
-
17444424631
-
Performance evaluation of production lines with finite buffer capacity producing two different products
-
Colledani, M., A. Matta, T. Tolio. 2005. Performance evaluation of production lines with finite buffer capacity producing two different products. OR Spectrum 27(2-3) 243-263.
-
(2005)
OR Spectrum
, vol.27
, Issue.2-3
, pp. 243-263
-
-
Colledani, M.1
Matta, A.2
Tolio, T.3
-
8
-
-
34249834508
-
Manufacturing flow line systems: A review of models and analytical results
-
Dallery, Y., S. B. Gershwin. 1992. Manufacturing flow line systems: A review of models and analytical results. Queueing Systems 12 3-94.
-
(1992)
Queueing Systems
, vol.12
, pp. 3-94
-
-
Dallery, Y.1
Gershwin, S.B.2
-
9
-
-
4043154214
-
Combining routing and buffer allocation problems in series-parallel queueing networks
-
Daskalaki, S., J. M. Smith. 2004. Combining routing and buffer allocation problems in series-parallel queueing networks. Ann. Oper. Res. 125 47-68.
-
(2004)
Ann. Oper. Res
, vol.125
, pp. 47-68
-
-
Daskalaki, S.1
Smith, J.M.2
-
10
-
-
10844258811
-
A dynamic programming algorithm for the buffer allocation problem in homogeneous asymptotically reliable serial production lines
-
Diamantidis, A. C., C. T. Papadopoulos. 2004. A dynamic programming algorithm for the buffer allocation problem in homogeneous asymptotically reliable serial production lines. Math. Problems Engrg. (3) 209-223.
-
(2004)
Math. Problems Engrg
, vol.3
, pp. 209-223
-
-
Diamantidis, A.C.1
Papadopoulos, C.T.2
-
11
-
-
0032392274
-
Blocking policies in pharmaceutical transfer lines
-
Dogan, E., T. Altiok. 1998. Blocking policies in pharmaceutical transfer lines. Ann. Oper. Res. 79 323-347.
-
(1998)
Ann. Oper. Res
, vol.79
, pp. 323-347
-
-
Dogan, E.1
Altiok, T.2
-
12
-
-
17444397754
-
Lean buffering in serial production lines with non-exponential machines
-
Enginarlar, E., J. Li, S. M. Meerkov. 2005. Lean buffering in serial production lines with non-exponential machines. OR Spectrum 27(2-3) 195-219.
-
(2005)
OR Spectrum
, vol.27
, Issue.2-3
, pp. 195-219
-
-
Enginarlar, E.1
Li, J.2
Meerkov, S.M.3
-
13
-
-
0001337659
-
The effect of breakdowns and interstage storage on production line capacity
-
Freeman, M. C. 1967. The effect of breakdowns and interstage storage on production line capacity. J. Indust. Engrg. 15 194-200.
-
(1967)
J. Indust. Engrg
, vol.15
, pp. 194-200
-
-
Freeman, M.C.1
-
15
-
-
0028464619
-
Expected duration analysis of a two-stage transfer-line production system subject to inspection and rework
-
Gopalan, M. N., S. Kannan. 1994. Expected duration analysis of a two-stage transfer-line production system subject to inspection and rework. J. Oper. Res. Soc. 45(7) 797-805.
-
(1994)
J. Oper. Res. Soc
, vol.45
, Issue.7
, pp. 797-805
-
-
Gopalan, M.N.1
Kannan, S.2
-
17
-
-
0034381835
-
Approximate analysis of unreliable transfer lines with splits in the flow of material
-
Helber, S. 2000. Approximate analysis of unreliable transfer lines with splits in the flow of material. Ann. Oper. Res. 93 217-243.
-
(2000)
Ann. Oper. Res
, vol.93
, pp. 217-243
-
-
Helber, S.1
-
18
-
-
17444379379
-
Analysis of flow lines with Cox-2-distributed processing times and limited buffer capacity
-
Helber, S. 2005. Analysis of flow lines with Cox-2-distributed processing times and limited buffer capacity. OR Spectrum 27(2-3) 221-242.
-
(2005)
OR Spectrum
, vol.27
, Issue.2-3
, pp. 221-242
-
-
Helber, S.1
-
20
-
-
0000285320
-
Empirical evaluation of exponential and independence assumptions in queueing models of manufacturing systems
-
Inman, R. R. 1999. Empirical evaluation of exponential and independence assumptions in queueing models of manufacturing systems. Production Oper. Management 8(4) 409-432.
-
(1999)
Production Oper. Management
, vol.8
, Issue.4
, pp. 409-432
-
-
Inman, R.R.1
-
21
-
-
0023416254
-
An approximate model of multi-stage automatic transfer lines with possible scrapping of work pieces
-
Jafari, M. A., J. G. Shanthikumar. 1987. An approximate model of multi-stage automatic transfer lines with possible scrapping of work pieces. IIE Trans. 19(3) 252-265.
-
(1987)
IIE Trans
, vol.19
, Issue.3
, pp. 252-265
-
-
Jafari, M.A.1
Shanthikumar, J.G.2
-
22
-
-
0033099735
-
Throughput improvement and scrap reduction in aluminum can manufacturing
-
Katok, E., T. Serrander, M. Wennstrom. 1999. Throughput improvement and scrap reduction in aluminum can manufacturing. Production Inventory Management J. 40(1) 36-42.
-
(1999)
Production Inventory Management J
, vol.40
, Issue.1
, pp. 36-42
-
-
Katok, E.1
Serrander, T.2
Wennstrom, M.3
-
23
-
-
17444379378
-
Integrated quality and quantity modeling of a production line
-
Kim, J., S. B. Gershwin. 2005. Integrated quality and quantity modeling of a production line. OR Spectrum 27(2-3) 287-314.
-
(2005)
OR Spectrum
, vol.27
, Issue.2-3
, pp. 287-314
-
-
Kim, J.1
Gershwin, S.B.2
-
24
-
-
0000009851
-
Production lines and internal storage - A review
-
Koenigsberg, E. 1959. Production lines and internal storage - A review. Management Sci. 5 410-433.
-
(1959)
Management Sci
, vol.5
, pp. 410-433
-
-
Koenigsberg, E.1
-
25
-
-
0345759911
-
Lean manufacturing in temperature dependent processes with interruptions
-
Lee, W. L., J. M. Allwood. 2003. Lean manufacturing in temperature dependent processes with interruptions. Internat. J. Oper. Production Management 23(11) 1377-1400.
-
(2003)
Internat. J. Oper. Production Management
, vol.23
, Issue.11
, pp. 1377-1400
-
-
Lee, W.L.1
Allwood, J.M.2
-
26
-
-
3242682462
-
Performance analysis of production systems with rework loops
-
Li, J. S. 2004. Performance analysis of production systems with rework loops. IIE Trans. 36(8) 755-765.
-
(2004)
IIE Trans
, vol.36
, Issue.8
, pp. 755-765
-
-
Li, J.S.1
-
27
-
-
0036558761
-
System analysis speeds up Chipita's food-processing line
-
Liberopoulos, G., P. Tsarouhas. 2002. System analysis speeds up Chipita's food-processing line. Interfaces 32(3) 62-76.
-
(2002)
Interfaces
, vol.32
, Issue.3
, pp. 62-76
-
-
Liberopoulos, G.1
Tsarouhas, P.2
-
28
-
-
13444280322
-
Reliability analysis of an automated pizza processing line
-
Liberopoulos, G., P. Tsarouhas. 2005. Reliability analysis of an automated pizza processing line. J. Food Engrg. 69(1) 79-96.
-
(2005)
J. Food Engrg
, vol.69
, Issue.1
, pp. 79-96
-
-
Liberopoulos, G.1
Tsarouhas, P.2
-
29
-
-
0017503286
-
Analysis of the effect of buffer storage capacity in transfer line systems
-
Okamura, K., H. Yamashina. 1977. Analysis of the effect of buffer storage capacity in transfer line systems. AIEE Trans. 9 127-135.
-
(1977)
AIEE Trans
, vol.9
, pp. 127-135
-
-
Okamura, K.1
Yamashina, H.2
-
30
-
-
0030570340
-
Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines
-
Papadopoulos, H. T., C. Heavey. 1996. Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines. Eur. J. Oper. Res. 92 1-27.
-
(1996)
Eur. J. Oper. Res
, vol.92
, pp. 1-27
-
-
Papadopoulos, H.T.1
Heavey, C.2
-
31
-
-
0035545671
-
A heuristic algorithm for the buffer allocation in unreliable unbalanced production lines
-
Papadopoulos, H. T., M. I. Vidalis. 2001. A heuristic algorithm for the buffer allocation in unreliable unbalanced production lines. Comput. Indust. Engrg. 41(3) 261-277.
-
(2001)
Comput. Indust. Engrg
, vol.41
, Issue.3
, pp. 261-277
-
-
Papadopoulos, H.T.1
Vidalis, M.I.2
-
32
-
-
0005355722
-
Optimal utilization of a finite capacity integrated assembly system
-
Pourbabai, B. 1990. Optimal utilization of a finite capacity integrated assembly system. Internat. J. Production Res. 28(2) 337-352.
-
(1990)
Internat. J. Production Res
, vol.28
, Issue.2
, pp. 337-352
-
-
Pourbabai, B.1
-
33
-
-
0009455220
-
Influence of storage bin capacity on the average standstill time of a production line
-
Sevastyanov, B. A. 1962. Influence of storage bin capacity on the average standstill time of a production line. Theory Probab. Appl. 7 429-438.
-
(1962)
Theory Probab. Appl
, vol.7
, pp. 429-438
-
-
Sevastyanov, B.A.1
-
34
-
-
0020826278
-
An algorithmic solution to two-stage transfer lines with possible scrapping of units
-
Shanthikumar, J. C., C. C. Tien. 1983. An algorithmic solution to two-stage transfer lines with possible scrapping of units. Management Sci. 29 1069-1086.
-
(1983)
Management Sci
, vol.29
, pp. 1069-1086
-
-
Shanthikumar, J.C.1
Tien, C.C.2
-
35
-
-
0037233381
-
Optimal buffer allocation in production lines
-
Shi, L. Y., S. Men. 2003. Optimal buffer allocation in production lines. IIE Trans. 35(1) 1-10.
-
(2003)
IIE Trans
, vol.35
, Issue.1
, pp. 1-10
-
-
Shi, L.Y.1
Men, S.2
-
36
-
-
0035546215
-
Buffer allocation and required availability in a transfer line with unreliable machines
-
Sorensen, K., G. K. Janssens. 2001. Buffer allocation and required availability in a transfer line with unreliable machines. Internat. J. Production Econom. 74(1-3) 163-173.
-
(2001)
Internat. J. Production Econom
, vol.74
, Issue.1-3
, pp. 163-173
-
-
Sorensen, K.1
Janssens, G.K.2
-
37
-
-
0034396244
-
A simulated annealing approach for buffer allocation in reliable production lines
-
Spinellis, D. D., C. T. Papadopoulos. 2000. A simulated annealing approach for buffer allocation in reliable production lines. Ann. Oper. Res. 93(1-1) 373-384.
-
(2000)
Ann. Oper. Res
, vol.93
, Issue.1 -1
, pp. 373-384
-
-
Spinellis, D.D.1
Papadopoulos, C.T.2
-
38
-
-
0242270555
-
Practical considerations in the optimization of flow production systems
-
Tempelmeier, H. 2003. Practical considerations in the optimization of flow production systems. Internat. J. Production Res. 41(1) 149-170.
-
(2003)
Internat. J. Production Res
, vol.41
, Issue.1
, pp. 149-170
-
-
Tempelmeier, H.1
-
39
-
-
0036160410
-
Analysis of two-machine lines with multiple failure modes
-
Tolio, T., A. Matta, S. B. Gershwin. 2002. Analysis of two-machine lines with multiple failure modes. IIE Trans. 34(1) 51-62.
-
(2002)
IIE Trans
, vol.34
, Issue.1
, pp. 51-62
-
-
Tolio, T.1
Matta, A.2
Gershwin, S.B.3
-
40
-
-
17444396378
-
Performance analysis of multi-server tandem queues with finite buffers and blocking
-
Van Vuuren, M., I. J. B. F. Adan, S. A. E. Resing-Sassen. 2005. Performance analysis of multi-server tandem queues with finite buffers and blocking. OR Spectrum 27(2-3) 315-338.
-
(2005)
OR Spectrum
, vol.27
, Issue.2-3
, pp. 315-338
-
-
Van Vuuren, M.1
Adan, I.J.B.F.2
Resing-Sassen, S.A.E.3
-
41
-
-
0009377466
-
The theory of internal stocks and their influence on the output of automatic lines
-
Vladzievskii, A. P. 1950-1951. The theory of internal stocks and their influence on the output of automatic lines. Stanki i Instrumenty 21(12) 4-7,
-
(1950)
Stanki i Instrumenty
, vol.21
, Issue.12
, pp. 4-7
-
-
Vladzievskii, A.P.1
-
42
-
-
33847276508
-
-
22(1) 16-17
-
22(1) 16-17.
-
-
-
-
43
-
-
0027342221
-
Analysis of a Markov chain model of a multistage manufacturing system with inspection, rejection, and rework
-
Yu, K.-Y. C., D. L. Bricker. 1993. Analysis of a Markov chain model of a multistage manufacturing system with inspection, rejection, and rework. IIE Trans. 25(1) 109-112.
-
(1993)
IIE Trans
, vol.25
, Issue.1
, pp. 109-112
-
-
Yu, K.-Y.C.1
Bricker, D.L.2
-
44
-
-
0002487973
-
Etudes de la propagation des arrêts aléatoires dans les chaînes de production
-
Zimmern, B. 1956. Etudes de la propagation des arrêts aléatoires dans les chaînes de production. Revue de Statistique Appliquée 4 85-104.
-
(1956)
Revue de Statistique Appliquée
, vol.4
, pp. 85-104
-
-
Zimmern, B.1
|