메뉴 건너뛰기




Volumn 9, Issue 1, 2007, Pages 62-83

Performance evaluation of an automatic transfer line with WIP scrapping during long failures

Author keywords

Material scrapping; Performance evaluation; Transfer line

Indexed keywords

COMPUTER OPERATING SYSTEMS; COMPUTER SIMULATION; COMPUTER WORKSTATIONS; MATHEMATICAL MODELS; NUMERICAL METHODS; PARAMETER ESTIMATION;

EID: 33847301475     PISSN: 15234614     EISSN: 15265498     Source Type: Journal    
DOI: 10.1287/msom.1060.0118     Document Type: Article
Times cited : (40)

References (44)
  • 1
    • 0003560262 scopus 로고    scopus 로고
    • Performance Analysis of Manufacturing Systems
    • Springer, New York
    • Altiok, T. 1996. Performance Analysis of Manufacturing Systems. Springer Series in Operations Research, Springer, New York.
    • (1996) Springer Series in Operations Research
    • Altiok, T.1
  • 3
    • 0032021594 scopus 로고    scopus 로고
    • Statistical analysis of downtime severity rates
    • Boyd, A. H., D. Radson. 1998. Statistical analysis of downtime severity rates. Internat. J. Production Res. 36(3) 603-615.
    • (1998) Internat. J. Production Res , vol.36 , Issue.3 , pp. 603-615
    • Boyd, A.H.1    Radson, D.2
  • 4
    • 84947637958 scopus 로고
    • Automatic transfer lines with buffer stocks
    • Buzacott, J. A. 1967. Automatic transfer lines with buffer stocks. Internat. J. Production Res. 5 183-200.
    • (1967) Internat. J. Production Res , vol.5 , pp. 183-200
    • Buzacott, J.A.1
  • 5
    • 84954971480 scopus 로고
    • Models of automatic transfer lines with inventory banks: A review and comparison
    • Buzacott, J. A., L. E. Hanifin. 1978. Models of automatic transfer lines with inventory banks: A review and comparison. AIIE Trans. 10(2) 197-207.
    • (1978) AIIE Trans , vol.10 , Issue.2 , pp. 197-207
    • Buzacott, J.A.1    Hanifin, L.E.2
  • 7
    • 17444424631 scopus 로고    scopus 로고
    • Performance evaluation of production lines with finite buffer capacity producing two different products
    • Colledani, M., A. Matta, T. Tolio. 2005. Performance evaluation of production lines with finite buffer capacity producing two different products. OR Spectrum 27(2-3) 243-263.
    • (2005) OR Spectrum , vol.27 , Issue.2-3 , pp. 243-263
    • Colledani, M.1    Matta, A.2    Tolio, T.3
  • 8
    • 34249834508 scopus 로고
    • Manufacturing flow line systems: A review of models and analytical results
    • Dallery, Y., S. B. Gershwin. 1992. Manufacturing flow line systems: A review of models and analytical results. Queueing Systems 12 3-94.
    • (1992) Queueing Systems , vol.12 , pp. 3-94
    • Dallery, Y.1    Gershwin, S.B.2
  • 9
    • 4043154214 scopus 로고    scopus 로고
    • Combining routing and buffer allocation problems in series-parallel queueing networks
    • Daskalaki, S., J. M. Smith. 2004. Combining routing and buffer allocation problems in series-parallel queueing networks. Ann. Oper. Res. 125 47-68.
    • (2004) Ann. Oper. Res , vol.125 , pp. 47-68
    • Daskalaki, S.1    Smith, J.M.2
  • 10
    • 10844258811 scopus 로고    scopus 로고
    • A dynamic programming algorithm for the buffer allocation problem in homogeneous asymptotically reliable serial production lines
    • Diamantidis, A. C., C. T. Papadopoulos. 2004. A dynamic programming algorithm for the buffer allocation problem in homogeneous asymptotically reliable serial production lines. Math. Problems Engrg. (3) 209-223.
    • (2004) Math. Problems Engrg , vol.3 , pp. 209-223
    • Diamantidis, A.C.1    Papadopoulos, C.T.2
  • 11
    • 0032392274 scopus 로고    scopus 로고
    • Blocking policies in pharmaceutical transfer lines
    • Dogan, E., T. Altiok. 1998. Blocking policies in pharmaceutical transfer lines. Ann. Oper. Res. 79 323-347.
    • (1998) Ann. Oper. Res , vol.79 , pp. 323-347
    • Dogan, E.1    Altiok, T.2
  • 12
    • 17444397754 scopus 로고    scopus 로고
    • Lean buffering in serial production lines with non-exponential machines
    • Enginarlar, E., J. Li, S. M. Meerkov. 2005. Lean buffering in serial production lines with non-exponential machines. OR Spectrum 27(2-3) 195-219.
    • (2005) OR Spectrum , vol.27 , Issue.2-3 , pp. 195-219
    • Enginarlar, E.1    Li, J.2    Meerkov, S.M.3
  • 13
    • 0001337659 scopus 로고
    • The effect of breakdowns and interstage storage on production line capacity
    • Freeman, M. C. 1967. The effect of breakdowns and interstage storage on production line capacity. J. Indust. Engrg. 15 194-200.
    • (1967) J. Indust. Engrg , vol.15 , pp. 194-200
    • Freeman, M.C.1
  • 15
    • 0028464619 scopus 로고
    • Expected duration analysis of a two-stage transfer-line production system subject to inspection and rework
    • Gopalan, M. N., S. Kannan. 1994. Expected duration analysis of a two-stage transfer-line production system subject to inspection and rework. J. Oper. Res. Soc. 45(7) 797-805.
    • (1994) J. Oper. Res. Soc , vol.45 , Issue.7 , pp. 797-805
    • Gopalan, M.N.1    Kannan, S.2
  • 17
    • 0034381835 scopus 로고    scopus 로고
    • Approximate analysis of unreliable transfer lines with splits in the flow of material
    • Helber, S. 2000. Approximate analysis of unreliable transfer lines with splits in the flow of material. Ann. Oper. Res. 93 217-243.
    • (2000) Ann. Oper. Res , vol.93 , pp. 217-243
    • Helber, S.1
  • 18
    • 17444379379 scopus 로고    scopus 로고
    • Analysis of flow lines with Cox-2-distributed processing times and limited buffer capacity
    • Helber, S. 2005. Analysis of flow lines with Cox-2-distributed processing times and limited buffer capacity. OR Spectrum 27(2-3) 221-242.
    • (2005) OR Spectrum , vol.27 , Issue.2-3 , pp. 221-242
    • Helber, S.1
  • 20
    • 0000285320 scopus 로고    scopus 로고
    • Empirical evaluation of exponential and independence assumptions in queueing models of manufacturing systems
    • Inman, R. R. 1999. Empirical evaluation of exponential and independence assumptions in queueing models of manufacturing systems. Production Oper. Management 8(4) 409-432.
    • (1999) Production Oper. Management , vol.8 , Issue.4 , pp. 409-432
    • Inman, R.R.1
  • 21
    • 0023416254 scopus 로고
    • An approximate model of multi-stage automatic transfer lines with possible scrapping of work pieces
    • Jafari, M. A., J. G. Shanthikumar. 1987. An approximate model of multi-stage automatic transfer lines with possible scrapping of work pieces. IIE Trans. 19(3) 252-265.
    • (1987) IIE Trans , vol.19 , Issue.3 , pp. 252-265
    • Jafari, M.A.1    Shanthikumar, J.G.2
  • 22
    • 0033099735 scopus 로고    scopus 로고
    • Throughput improvement and scrap reduction in aluminum can manufacturing
    • Katok, E., T. Serrander, M. Wennstrom. 1999. Throughput improvement and scrap reduction in aluminum can manufacturing. Production Inventory Management J. 40(1) 36-42.
    • (1999) Production Inventory Management J , vol.40 , Issue.1 , pp. 36-42
    • Katok, E.1    Serrander, T.2    Wennstrom, M.3
  • 23
    • 17444379378 scopus 로고    scopus 로고
    • Integrated quality and quantity modeling of a production line
    • Kim, J., S. B. Gershwin. 2005. Integrated quality and quantity modeling of a production line. OR Spectrum 27(2-3) 287-314.
    • (2005) OR Spectrum , vol.27 , Issue.2-3 , pp. 287-314
    • Kim, J.1    Gershwin, S.B.2
  • 24
    • 0000009851 scopus 로고
    • Production lines and internal storage - A review
    • Koenigsberg, E. 1959. Production lines and internal storage - A review. Management Sci. 5 410-433.
    • (1959) Management Sci , vol.5 , pp. 410-433
    • Koenigsberg, E.1
  • 25
    • 0345759911 scopus 로고    scopus 로고
    • Lean manufacturing in temperature dependent processes with interruptions
    • Lee, W. L., J. M. Allwood. 2003. Lean manufacturing in temperature dependent processes with interruptions. Internat. J. Oper. Production Management 23(11) 1377-1400.
    • (2003) Internat. J. Oper. Production Management , vol.23 , Issue.11 , pp. 1377-1400
    • Lee, W.L.1    Allwood, J.M.2
  • 26
    • 3242682462 scopus 로고    scopus 로고
    • Performance analysis of production systems with rework loops
    • Li, J. S. 2004. Performance analysis of production systems with rework loops. IIE Trans. 36(8) 755-765.
    • (2004) IIE Trans , vol.36 , Issue.8 , pp. 755-765
    • Li, J.S.1
  • 27
    • 0036558761 scopus 로고    scopus 로고
    • System analysis speeds up Chipita's food-processing line
    • Liberopoulos, G., P. Tsarouhas. 2002. System analysis speeds up Chipita's food-processing line. Interfaces 32(3) 62-76.
    • (2002) Interfaces , vol.32 , Issue.3 , pp. 62-76
    • Liberopoulos, G.1    Tsarouhas, P.2
  • 28
    • 13444280322 scopus 로고    scopus 로고
    • Reliability analysis of an automated pizza processing line
    • Liberopoulos, G., P. Tsarouhas. 2005. Reliability analysis of an automated pizza processing line. J. Food Engrg. 69(1) 79-96.
    • (2005) J. Food Engrg , vol.69 , Issue.1 , pp. 79-96
    • Liberopoulos, G.1    Tsarouhas, P.2
  • 29
    • 0017503286 scopus 로고
    • Analysis of the effect of buffer storage capacity in transfer line systems
    • Okamura, K., H. Yamashina. 1977. Analysis of the effect of buffer storage capacity in transfer line systems. AIEE Trans. 9 127-135.
    • (1977) AIEE Trans , vol.9 , pp. 127-135
    • Okamura, K.1    Yamashina, H.2
  • 30
    • 0030570340 scopus 로고    scopus 로고
    • Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines
    • Papadopoulos, H. T., C. Heavey. 1996. Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines. Eur. J. Oper. Res. 92 1-27.
    • (1996) Eur. J. Oper. Res , vol.92 , pp. 1-27
    • Papadopoulos, H.T.1    Heavey, C.2
  • 31
    • 0035545671 scopus 로고    scopus 로고
    • A heuristic algorithm for the buffer allocation in unreliable unbalanced production lines
    • Papadopoulos, H. T., M. I. Vidalis. 2001. A heuristic algorithm for the buffer allocation in unreliable unbalanced production lines. Comput. Indust. Engrg. 41(3) 261-277.
    • (2001) Comput. Indust. Engrg , vol.41 , Issue.3 , pp. 261-277
    • Papadopoulos, H.T.1    Vidalis, M.I.2
  • 32
    • 0005355722 scopus 로고
    • Optimal utilization of a finite capacity integrated assembly system
    • Pourbabai, B. 1990. Optimal utilization of a finite capacity integrated assembly system. Internat. J. Production Res. 28(2) 337-352.
    • (1990) Internat. J. Production Res , vol.28 , Issue.2 , pp. 337-352
    • Pourbabai, B.1
  • 33
    • 0009455220 scopus 로고
    • Influence of storage bin capacity on the average standstill time of a production line
    • Sevastyanov, B. A. 1962. Influence of storage bin capacity on the average standstill time of a production line. Theory Probab. Appl. 7 429-438.
    • (1962) Theory Probab. Appl , vol.7 , pp. 429-438
    • Sevastyanov, B.A.1
  • 34
    • 0020826278 scopus 로고
    • An algorithmic solution to two-stage transfer lines with possible scrapping of units
    • Shanthikumar, J. C., C. C. Tien. 1983. An algorithmic solution to two-stage transfer lines with possible scrapping of units. Management Sci. 29 1069-1086.
    • (1983) Management Sci , vol.29 , pp. 1069-1086
    • Shanthikumar, J.C.1    Tien, C.C.2
  • 35
    • 0037233381 scopus 로고    scopus 로고
    • Optimal buffer allocation in production lines
    • Shi, L. Y., S. Men. 2003. Optimal buffer allocation in production lines. IIE Trans. 35(1) 1-10.
    • (2003) IIE Trans , vol.35 , Issue.1 , pp. 1-10
    • Shi, L.Y.1    Men, S.2
  • 36
    • 0035546215 scopus 로고    scopus 로고
    • Buffer allocation and required availability in a transfer line with unreliable machines
    • Sorensen, K., G. K. Janssens. 2001. Buffer allocation and required availability in a transfer line with unreliable machines. Internat. J. Production Econom. 74(1-3) 163-173.
    • (2001) Internat. J. Production Econom , vol.74 , Issue.1-3 , pp. 163-173
    • Sorensen, K.1    Janssens, G.K.2
  • 37
    • 0034396244 scopus 로고    scopus 로고
    • A simulated annealing approach for buffer allocation in reliable production lines
    • Spinellis, D. D., C. T. Papadopoulos. 2000. A simulated annealing approach for buffer allocation in reliable production lines. Ann. Oper. Res. 93(1-1) 373-384.
    • (2000) Ann. Oper. Res , vol.93 , Issue.1 -1 , pp. 373-384
    • Spinellis, D.D.1    Papadopoulos, C.T.2
  • 38
    • 0242270555 scopus 로고    scopus 로고
    • Practical considerations in the optimization of flow production systems
    • Tempelmeier, H. 2003. Practical considerations in the optimization of flow production systems. Internat. J. Production Res. 41(1) 149-170.
    • (2003) Internat. J. Production Res , vol.41 , Issue.1 , pp. 149-170
    • Tempelmeier, H.1
  • 39
    • 0036160410 scopus 로고    scopus 로고
    • Analysis of two-machine lines with multiple failure modes
    • Tolio, T., A. Matta, S. B. Gershwin. 2002. Analysis of two-machine lines with multiple failure modes. IIE Trans. 34(1) 51-62.
    • (2002) IIE Trans , vol.34 , Issue.1 , pp. 51-62
    • Tolio, T.1    Matta, A.2    Gershwin, S.B.3
  • 40
    • 17444396378 scopus 로고    scopus 로고
    • Performance analysis of multi-server tandem queues with finite buffers and blocking
    • Van Vuuren, M., I. J. B. F. Adan, S. A. E. Resing-Sassen. 2005. Performance analysis of multi-server tandem queues with finite buffers and blocking. OR Spectrum 27(2-3) 315-338.
    • (2005) OR Spectrum , vol.27 , Issue.2-3 , pp. 315-338
    • Van Vuuren, M.1    Adan, I.J.B.F.2    Resing-Sassen, S.A.E.3
  • 41
    • 0009377466 scopus 로고
    • The theory of internal stocks and their influence on the output of automatic lines
    • Vladzievskii, A. P. 1950-1951. The theory of internal stocks and their influence on the output of automatic lines. Stanki i Instrumenty 21(12) 4-7,
    • (1950) Stanki i Instrumenty , vol.21 , Issue.12 , pp. 4-7
    • Vladzievskii, A.P.1
  • 42
    • 33847276508 scopus 로고    scopus 로고
    • 22(1) 16-17
    • 22(1) 16-17.
  • 43
    • 0027342221 scopus 로고
    • Analysis of a Markov chain model of a multistage manufacturing system with inspection, rejection, and rework
    • Yu, K.-Y. C., D. L. Bricker. 1993. Analysis of a Markov chain model of a multistage manufacturing system with inspection, rejection, and rework. IIE Trans. 25(1) 109-112.
    • (1993) IIE Trans , vol.25 , Issue.1 , pp. 109-112
    • Yu, K.-Y.C.1    Bricker, D.L.2
  • 44
    • 0002487973 scopus 로고
    • Etudes de la propagation des arrêts aléatoires dans les chaînes de production
    • Zimmern, B. 1956. Etudes de la propagation des arrêts aléatoires dans les chaînes de production. Revue de Statistique Appliquée 4 85-104.
    • (1956) Revue de Statistique Appliquée , vol.4 , pp. 85-104
    • Zimmern, B.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.