-
1
-
-
0033307078
-
A markov decision process model for capacity expansion and allocation
-
December, Phoenix, AZ
-
Bhatnagar, S., E. Fernandez-Gaucherand, M. C. Fu, Y. He, and S. I. Marcus. 1999, December. A markov decision process model for capacity expansion and allocation. In Proc. 38th IEEE Conference on Decision and Control, 121-125. Phoenix, AZ.
-
(1999)
Proc. 38th IEEE Conference on Decision and Control
, pp. 121-125
-
-
Bhatnagar, S.1
Fernandez-Gaucherand, E.2
Fu, M.C.3
He, Y.4
Marcus, S.I.5
-
2
-
-
33846651079
-
-
Brooks-Automation 2005. Autosched ap. 〈http://www.autosched. com〉.
-
Brooks-Automation 2005. Autosched ap. 〈http://www.autosched. com〉.
-
-
-
-
3
-
-
17744380446
-
300 mm factory layout and material handling modeling
-
phase ii report. Tech transfer document, 99113848beng
-
Campbell, C. E., and J. Ammenheuser. 2000.300 mm factory layout and material handling modeling: phase ii report. Tech transfer document # 99113848beng.
-
(2000)
-
-
Campbell, C.E.1
Ammenheuser, J.2
-
4
-
-
33846652978
-
-
Private communication
-
Fowler, J. W. 2004. Private communication.
-
(2004)
-
-
Fowler, J.W.1
-
5
-
-
0032255790
-
Operational modeling & simulation in semiconductor manufacturing
-
Fowler, J. W., M. C. Fu, L. W. Schruben, S. Brown, F. Chance, S. Cunningham, C. Hilton, M. Janakiram, R. Stafford, and J. Hutchby. 1998. Operational modeling & simulation in semiconductor manufacturing. In Proceedings of the 1998 Winter Simulation Conference, 1035-1040.
-
(1998)
Proceedings of the 1998 Winter Simulation Conference
, pp. 1035-1040
-
-
Fowler, J.W.1
Fu, M.C.2
Schruben, L.W.3
Brown, S.4
Chance, F.5
Cunningham, S.6
Hilton, C.7
Janakiram, M.8
Stafford, R.9
Hutchby, J.10
-
6
-
-
0032284226
-
Integrating targeted cycle-time reduction into the capital planning process
-
Grewal, N. S., A. C. Bruska, T. M. Wulf, and J. K. Robinson. 1998. Integrating targeted cycle-time reduction into the capital planning process. In Proceedings of the 1998 Winter Simulation Conference, 1005-1010.
-
(1998)
Proceedings of the 1998 Winter Simulation Conference
, pp. 1005-1010
-
-
Grewal, N.S.1
Bruska, A.C.2
Wulf, T.M.3
Robinson, J.K.4
-
8
-
-
4243355745
-
Intel five-machine six-step mini-fab description
-
textasciitilde{}research/intel/papers/fabspec. html〉
-
Kempf, K. 2005. Intel five-machine six-step mini-fab description. 〈http://www.eas.asu.edu/textasciitilde{}research/intel/papers/fabspec. html〉.
-
(2005)
-
-
Kempf, K.1
-
9
-
-
0028744478
-
Scheduling semiconductor manufacturing plants
-
Kumar, P. R. 1994. Scheduling semiconductor manufacturing plants. IEEE Control Systems Magazine 39 (11): 33-40.
-
(1994)
IEEE Control Systems Magazine
, vol.39
, Issue.11
, pp. 33-40
-
-
Kumar, P.R.1
-
10
-
-
0035485518
-
Queueing network models in the design and analysis of semiconductor wafer fabs
-
Kumar, S., and P. R. Kumar. 2001. Queueing network models in the design and analysis of semiconductor wafer fabs. IEEE Transactions on Robotics and Automation 17 (5): 548-561.
-
(2001)
IEEE Transactions on Robotics and Automation
, vol.17
, Issue.5
, pp. 548-561
-
-
Kumar, S.1
Kumar, P.R.2
-
12
-
-
1642559573
-
A neutral information model for simulation machine shop operations
-
Pistcataway, New Jersey: Institute of Electrical and Electronic Engineers
-
Lee, T., and C. McLean. 2003. A neutral information model for simulation machine shop operations. In Proceedings of the 2003 Winter Simulation Conference, 1296-1304. Pistcataway, New Jersey: Institute of Electrical and Electronic Engineers.
-
(2003)
Proceedings of the 2003 Winter Simulation Conference
, pp. 1296-1304
-
-
Lee, T.1
McLean, C.2
-
13
-
-
77949515386
-
A framework for standard modular simulation: Application to semiconductor wafer fabrication
-
to be submitted for publication
-
Li, H., J. A. Ramírez-Hernández, E. Fernandez, C. R. McLean, and S. Leong. 2005. A framework for standard modular simulation: application to semiconductor wafer fabrication, to be submitted for publication.
-
(2005)
-
-
Li, H.1
Ramírez-Hernández, J.A.2
Fernandez, E.3
McLean, C.R.4
Leong, S.5
-
14
-
-
1642481853
-
Shop data model and interface specification
-
McLean, C., Y. T. Lee, G. Shao, and F. Riddick. 2005. Shop data model and interface specification, technical report. 〈http://www.sisostds.org/ doclib/doclib.cfm?SISO\_RID\_1005843〉.
-
(2005)
technical report
-
-
McLean, C.1
Lee, Y.T.2
Shao, G.3
Riddick, F.4
-
15
-
-
0036924015
-
A framework for standard modular simulation
-
Pistcataway, New Jersey: Institute of Electrical and Electronic Engineers
-
McLean, C., and S. Leong. 2002. A framework for standard modular simulation. In Proceedings of the 2002 Winter Simulation Conference, 1613-1620. Pistcataway, New Jersey: Institute of Electrical and Electronic Engineers.
-
(2002)
Proceedings of the 2002 Winter Simulation Conference
, pp. 1613-1620
-
-
McLean, C.1
Leong, S.2
-
16
-
-
1642436913
-
Generic case studies for manufacturing simulation applications
-
New Jersey: Institute of Electrical and Electronic Engineers
-
McLean, C., and G. Shao. 2003. Generic case studies for manufacturing simulation applications. In Proceedings of the 2003 Winter Simulation Conference, 1217-1224. New Jersey: Institute of Electrical and Electronic Engineers.
-
(2003)
Proceedings of the 2003 Winter Simulation Conference
, pp. 1217-1224
-
-
McLean, C.1
Shao, G.2
-
17
-
-
0031075607
-
Modeling the effectof hot lots in semiconductor manufacturing systems
-
Narahari, Y., and L. M. Khan. 1997. Modeling the effectof hot lots in semiconductor manufacturing systems. IEEE Transactions on Semiconductor Manufacturing 10 (1): 185-188.
-
(1997)
IEEE Transactions on Semiconductor Manufacturing
, vol.10
, Issue.1
, pp. 185-188
-
-
Narahari, Y.1
Khan, L.M.2
-
18
-
-
0003683075
-
-
Object-Managment-Group
-
Object-Managment-Group 2005. Unified modeling language (uml). 〈http://www.uml.org〉.
-
(2005)
Unified modeling language (uml)
-
-
-
23
-
-
0008190481
-
Conwip-like lot release for a wafer fabrication facility with dynamic load changes
-
Rose, 0.2001. Conwip-like lot release for a wafer fabrication facility with dynamic load changes. In Proceedings of the SMOMS '01 (ASTC '01), 41-46.
-
(2001)
Proceedings of the SMOMS '01 (ASTC '01)
, pp. 41-46
-
-
Rose, O.1
-
24
-
-
33846660545
-
-
SEMATECH 1997. Modeling data standards, version 1.0. Technical report, Sematech Inc, Austin, TX
-
SEMATECH 1997. Modeling data standards, version 1.0. Technical report, Sematech Inc., Austin, TX.
-
-
-
-
25
-
-
0030687001
-
Hierarchical modeling and control for re-entrant semiconductor fabrication lines: A mini-fab bechmark
-
Los Angeles, CA
-
Tsakalis, K. S., J. J. Flores-Godoy, and A. A. Rodriguez. 1997. Hierarchical modeling and control for re-entrant semiconductor fabrication lines: A mini-fab bechmark. In Proceedings of the ETFA'97, 6th IEEE International Conference on Emerging Technology Factory Automation, 514-519. Los Angeles, CA.
-
(1997)
Proceedings of the ETFA'97, 6th IEEE International Conference on Emerging Technology Factory Automation
, pp. 514-519
-
-
Tsakalis, K.S.1
Flores-Godoy, J.J.2
Rodriguez, A.A.3
-
26
-
-
84952240555
-
A review of production planning and scheduling models in the semiconductor industry part i: System characteristics, performance evaluation, and production planning
-
Uzsoy, R., C. Lee, and L. A. Martin-Vega. 1992. A review of production planning and scheduling models in the semiconductor industry part i: system characteristics, performance evaluation, and production planning. IIE Transactions 24:47-60.
-
(1992)
IIE Transactions
, vol.24
, pp. 47-60
-
-
Uzsoy, R.1
Lee, C.2
Martin-Vega, L.A.3
-
29
-
-
4344583594
-
Optimal preventive maintenance scheduling in semiconductor manufacturing
-
Yao, X., E. Fernandez-Gaucherand, M. Fu, and S. Marcus. 2004. Optimal preventive maintenance scheduling in semiconductor manufacturing. IEEE Transactions on Semiconductor Manufacturing 17 (23): 345-356.
-
(2004)
IEEE Transactions on Semiconductor Manufacturing
, vol.17
, Issue.23
, pp. 345-356
-
-
Yao, X.1
Fernandez-Gaucherand, E.2
Fu, M.3
Marcus, S.4
|