-
1
-
-
33846516111
-
-
Aler, R., & Borrajo, D. (2002). Learning single-criteria control knowledge for multi-criteria planning. In Proceedings of the AIPS-02 workshop on planning and scheduling with multiple criteria (pp. 35-40).
-
-
-
-
2
-
-
0036833004
-
A knowledge-based approach for business process reengineering, SHAMASH
-
Aler R., Borrajo D., Camacho D., and Sierra-Alonso A. A knowledge-based approach for business process reengineering, SHAMASH. Knowledge Based Systems 15 8 (2002) 473-483
-
(2002)
Knowledge Based Systems
, vol.15
, Issue.8
, pp. 473-483
-
-
Aler, R.1
Borrajo, D.2
Camacho, D.3
Sierra-Alonso, A.4
-
3
-
-
0021466185
-
Towards a general theory of action and time
-
Allen J. Towards a general theory of action and time. Artificial Intelligence 23 (1984) 123-154
-
(1984)
Artificial Intelligence
, vol.23
, pp. 123-154
-
-
Allen, J.1
-
5
-
-
33846503015
-
-
Berry, P. M., & Drabble, B. (2000). SWIM: an AI-based system for organizational management. In Proceedings of the 2nd NASA international workshop on planning and scheduling for space, San Francisco, California.
-
-
-
-
6
-
-
0035369022
-
Planning as heuristic search
-
Bonet B., and Geffner H. Planning as heuristic search. Artificial Intelligence 129 1-2 (2001) 5-33
-
(2001)
Artificial Intelligence
, vol.129
, Issue.1-2
, pp. 5-33
-
-
Bonet, B.1
Geffner, H.2
-
7
-
-
33846542824
-
-
Borrajo, D., Vegas, S., & Veloso, M. (2001). Quality-based learning for planning. In Working notes of the IJCAI'01 workshop on planning with resources.
-
-
-
-
8
-
-
33846504605
-
-
Carbonell, J. G., Blythe, J., Etzioni, O., Gil, Y., Joseph, R., Kahn, D., et al., 1992. PRODIGY4.0: The manual and tutorial. Tech. Rep. CMU-CS-92-150, Department of Computer Science.
-
-
-
-
9
-
-
33846494507
-
-
Cesta, A., Oddi, A., & Smith, S. (1998). Profile based algorithms to solve multiple capacitated metric scheduling problems. In Proceedings of the fourth international conference on artificial intelligence planning systems (AIPS-98).
-
-
-
-
10
-
-
0036182335
-
A constrained-based method for project scheduling with time windows
-
Cesta A., Oddi A., and Smith S. A constrained-based method for project scheduling with time windows. Journal of Heuristics 8 (2002) 109-136
-
(2002)
Journal of Heuristics
, vol.8
, pp. 109-136
-
-
Cesta, A.1
Oddi, A.2
Smith, S.3
-
11
-
-
33846516661
-
-
Cesta, A., Pecora, F., & Rasconi, R. (2004). Biasing the structure of scheduling problems through classical planners. In Proceedings of the workshop on integrating planning into scheduling.
-
-
-
-
12
-
-
0026255231
-
O-plan: the open planning architecture
-
Currie K., and Tate A. O-plan: the open planning architecture. Artificial Intelligence 52 (1991) 49-86
-
(1991)
Artificial Intelligence
, vol.52
, pp. 49-86
-
-
Currie, K.1
Tate, A.2
-
15
-
-
33846478188
-
-
Edelkamp, S., & Helmert, M. (2000). On the Implementation of MIPS. In AIPS workshop on model-theoretic approaches to planning.
-
-
-
-
16
-
-
33846492137
-
-
Edelkamp, S., & Hoffmann, J. (2004). PDDL2.2: the language for the classical part of the 4th international planning competition. Tech. Rep. Technical Report No. 195, Institut fur Informatik.
-
-
-
-
17
-
-
2842560201
-
strips: a new approach to the application of theorem proving to problem solving
-
Fikes R., and Nilsson N. strips: a new approach to the application of theorem proving to problem solving. Artificial Intelligence 2 (1971) 189-208
-
(1971)
Artificial Intelligence
, vol.2
, pp. 189-208
-
-
Fikes, R.1
Nilsson, N.2
-
18
-
-
33846486525
-
-
Gerevini, A., & Dimopoulos, Y. (2002). Temporal planning through mixed integer programming. In Proceedings of the AIPS'02 workshop on planning for temporal domains.
-
-
-
-
19
-
-
33846488175
-
-
Ghallab, M., & Laruelle, H. (1994). Representation and control in IxTeT, a temporal planner. In Proceedings of the second international conference on AI planning systems (AIPS-94).
-
-
-
-
21
-
-
0004111284
-
Reengineering the corporation
-
Harper Business Press, New York
-
Hammer M., and Champy J. Reengineering the corporation. Reengineering the corporation (1993), Harper Business Press, New York
-
(1993)
Reengineering the corporation
-
-
Hammer, M.1
Champy, J.2
-
22
-
-
33846530933
-
-
Hannebaeur, M. (1999). From formal workflow models to intelligent agents. In AAAI-99 workshop on agent-based systems in the business context. Brian Drabble and Peter Jarvis Cochairs.
-
-
-
-
23
-
-
33846485924
-
The metric-FF planning system: translating ignoring delete lists to numerical state variables
-
Hoffmann J. The metric-FF planning system: translating ignoring delete lists to numerical state variables. Journal of Artificial Intelligence Research (2002)
-
(2002)
Journal of Artificial Intelligence Research
-
-
Hoffmann, J.1
-
24
-
-
33846535645
-
-
Jarvis, P., Moore, J., Chung, P., Mcbriar, I., Stader, J., Ravinranathan, M. et al. (2000). Applying intelligent workflow management in the chemicals industries. In L. Fisher (Ed.), The workflow handbook 2001. Published in association with the Workflow Management Coalition (WfMC).
-
-
-
-
25
-
-
33846477025
-
-
Kearney, P., & Borrajo, D. (2000). An R&D agenda for AI planning applied to workflow. In Proceedings of the eBusiness and eWork conference 2000.
-
-
-
-
26
-
-
33846519703
-
-
Kuter, U., Nau, D., Pistore, M., & Traverso, P. (2005). The Yoyo planner: going where hierarchical task-network planning meets with symbolic model checking. In Proceedings of the 15th international conference on automated planning and scheduling (ICAPS'05).
-
-
-
-
27
-
-
33846521526
-
-
Leymann, F., & Roller, D. (1994). Business process management with FlowMark. In Proceedings of the IEEE computer society international conference.
-
-
-
-
28
-
-
33846493299
-
-
Lydiard, T., Jarvis, P., & Drabble, B. (1999). Realizing real commercial benefits from workflow: a report from the trenches. In AAAI-99 workshop on agent-based systems in the business context. Brian Drabble and Peter Jarvis Cochairs.
-
-
-
-
30
-
-
33846537116
-
-
Mohan, C. (1997). Recent trends in workflow management products, standards and research. In Proceedings NATO advanced study institute (ASI) on workflow management systems and interoperability.
-
-
-
-
31
-
-
33846495912
-
-
Myers, K. L. & Berry, P. M. (1999). At the boundary of workflow and AI. In AAAI-99 workshop on agent-based systems in the business context. Brian Drabble and Peter Jarvis Cochairs.
-
-
-
-
32
-
-
33846522092
-
-
PLANET. Network home page: European Network of Excellence in AI planning. Available from http://planet.dfki.de/index.html.
-
-
-
-
33
-
-
33846503014
-
-
PLANET. Workflow management TCU road map. Available from http://scalab.uc3m.es/dborrajo/planet/wm-tcu/.
-
-
-
-
34
-
-
0034975172
-
-
Purvis, M., Purvis, M., & Lemalu, S. (2001). A framework for distributed workflow systems. In Proceedings of the 34th annual Hawaii international conference on system sciences (HICSS-34). IEEE Computer Society.
-
-
-
-
35
-
-
33846480866
-
-
R-Moreno, M. D. (2003). Representing and Planning tasks with time and resources. PhD thesis, Universidad de Alcala, Spain.
-
-
-
-
37
-
-
33846550951
-
-
R-Moreno, M. D., Oddi, A., Borrajo, D., Cesta, A., & Meziat, D. (2004a). Planning and scheduling for workflow domains. In The ECAI'04 "planning and scheduling: Bridging theory to practice" workshop.
-
-
-
-
38
-
-
33846476430
-
-
R-Moreno, M. D., Oddi, A., Borrajo, D., Cesta, A., & Meziat, D. (2004b). IPSS: integrating hybrid reasoners for planning and scheduling. In Proceedings of the 16th European conference on artificial intelligence, ECAI04.
-
-
-
-
39
-
-
0035450111
-
Planning the project management way: efficient planning by effective integration of causal and resource reasoning in RealPlan
-
Srivastava B., Kambhampati R., and DO M.B. Planning the project management way: efficient planning by effective integration of causal and resource reasoning in RealPlan. Artificial Intelligence 131 (2001) 73-134
-
(2001)
Artificial Intelligence
, vol.131
, pp. 73-134
-
-
Srivastava, B.1
Kambhampati, R.2
DO, M.B.3
-
40
-
-
33846522648
-
-
Stader, J. (1996). Results of the enterprise project. In Proceedings 16th international conference of the British computer society specialist group on expert systems, Cambridge, UK.
-
-
-
-
41
-
-
0003307088
-
-
Morgan Kaufman
-
Tate A., Drabble B., and Kirby R.K. O-Plan2: An open architecture for command, planning, and control (1994), Morgan Kaufman
-
(1994)
O-Plan2: An open architecture for command, planning, and control
-
-
Tate, A.1
Drabble, B.2
Kirby, R.K.3
-
42
-
-
32144443210
-
Integrating planning and learning: the PRODIGY architecture
-
Veloso M., Carbonell J., Pérez A., Borrajo D., Fink E., and Blythe J. Integrating planning and learning: the PRODIGY architecture. Journal of Experimental and Theoretical AI 7 (1995) 81-120
-
(1995)
Journal of Experimental and Theoretical
, vol.AI 7
, pp. 81-120
-
-
Veloso, M.1
Carbonell, J.2
Pérez, A.3
Borrajo, D.4
Fink, E.5
Blythe, J.6
-
43
-
-
0344666750
-
-
Wah, B. W. & Chen, Y. (2003). Partitioning of temporal planning problems in mixed space using the theory of extended saddle points. In 15th IEEE international conference on tools with artificial intelligence (ICTAI'03).
-
-
-
-
44
-
-
33846506945
-
-
Workflow Management Coalition. Available from http://www.wfmc.org/.
-
-
-
|