Hierarchical data envelopment analysis for assessing black-start plans

Author keywords

Analytic hierarchy process; Black start; Data envelopment analysis; Power systems; System restoration

Indexed keywords

DECISION MAKING; RESTORATION; STARTING;

EID: 33845793048     PISSN: 10001026     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (28)

References (21)
  • 1
    • 15744374830 scopus 로고    scopus 로고
    • Final report on the August 14th 2003 blackout in the United States and Canada
    • US-Canada Power Outage Task Force
    • US-Canada Power Outage Task Force. Final report on the August 14th 2003 blackout in the United States and Canada[EB/OL]. [2006-02-23]. http://www.ferc.gov.
    • (2006)
  • 2
    • 0348233153 scopus 로고    scopus 로고
    • The way from a simple contingency to system wide disaster: Lesson from the eastern interconnection blackout in 2003
    • XUE Yusheng. The way from a simple contingency to system wide disaster: lesson from the eastern interconnection blackout in 2003. Automation of Electric Power Systems, 2003, 27(18): 1-5,37.
    • (2003) Automation of Electric Power Systems , vol.27 , Issue.18
    • Xue, Y.1
  • 3
    • 33747065679 scopus 로고    scopus 로고
    • After the 2003 blackouts across several continentals
    • GAN Deqiang, HU Jiangyi, HAN Zhenxiang. After the 2003 blackouts across several continentals. Automation of Electric Power Systems, 2004, 28(3): 1-4,9.
    • (2004) Automation of Electric Power Systems , vol.28 , Issue.3
    • Gan, D.1    Hu, J.2    Han, Z.3
  • 4
    • 0025386520 scopus 로고
    • Simulation and field tests of the black start of a large coal-fired generating station utilizing small remote hydro generation
    • LINDSTROM R R. Simulation and field tests of the black start of a large coal-fired generating station utilizing small remote hydro generation. IEEE Trans on Power Systems, 1990, 5(1): 162-168.
    • (1990) IEEE Trans on Power Systems , vol.5 , Issue.1 , pp. 162-168
    • Lindstrom, R.R.1
  • 6
    • 0030216984 scopus 로고    scopus 로고
    • Blackstart and restoration of a part of the Italian HV network: Modeling and simulation of a field test
    • DELFINO B, DENEGRI G B, INVERNIZZI M, et al. Blackstart and restoration of a part of the Italian HV network: modeling and simulation of a field test. IEEE Trans on Power Systems, 1996, 11(3): 1371-1379.
    • (1996) IEEE Trans on Power Systems , vol.11 , Issue.3 , pp. 1371-1379
    • Delfino, B.1    Denegri, G.B.2    Invernizzi, M.3
  • 7
    • 10744226712 scopus 로고    scopus 로고
    • Transformer overvoltage problems and countermeasures at black start
    • Toronto, Canada. Piscataway, NJ, USA: IEEE
    • FUNAKOSHI T, FURUKAWA K, KAWACHINO T, et al. Transformer overvoltage problems and countermeasures at black start//Proceedings of IEEE PES General Meeting: Vol 2, July 13-17, 2003, Toronto, Canada. Piscataway, NJ, USA: IEEE, 2003: 581-588.
    • (2003) Proceedings of IEEE PES General Meeting , vol.2 , pp. 581-588
    • Funakoshi, T.1    Furukawa, K.2    Kawachino, T.3
  • 8
    • 3242794806 scopus 로고    scopus 로고
    • The black startup experiment of North China power grid
    • JIANG Changming, YAN Hequn, XU Peng. The black startup experiment of North China power grid. Automation of Electric Power Systems, 2000, 24(22): 57-58.
    • (2000) Automation of Electric Power Systems , vol.24 , Issue.22 , pp. 57-58
    • Jiang, C.1    Yan, H.2    Xu, P.3
  • 9
    • 33646346805 scopus 로고    scopus 로고
    • One research of East China power system black start plan
    • YU Weiyong, FANG Xinyan, XIONG Huimin. One research of East China power system black start plan. Proceedings of the CSU-EPSA, 2000, 12(2): 1-4.
    • (2000) Proceedings of the CSU-EPSA , vol.12 , Issue.2 , pp. 1-4
    • Yu, W.1    Fang, X.2    Xiong, H.3
  • 10
    • 4344709943 scopus 로고    scopus 로고
    • Blackstart scheme using small thermal plant unit for Datong power network
    • ZHANG Qiang, GAO Ming, ZHANG Liqiang, et al. Blackstart scheme using small thermal plant unit for Datong power network. Automation of Electric Power Systems, 2003, 27(12): 75-77,94.
    • (2003) Automation of Electric Power Systems , vol.27 , Issue.12
    • Zhang, Q.1    Gao, M.2    Zhang, L.3
  • 11
    • 33645652242 scopus 로고    scopus 로고
    • Review of blackout in Hainan on September 26: Causes and recommendations
    • TANG Siqing, ZHANG Mi, LI Jianshe, et al. Review of blackout in Hainan on September 26: causes and recommendations. Automation of Electric Power Systems, 2006, 30(1): 1-7,16.
    • (2006) Automation of Electric Power Systems , vol.30 , Issue.1
    • Tang, S.1    Zhang, M.2    Li, J.3
  • 12
    • 0026155714 scopus 로고
    • Guiding a power system restoration with an expert system
    • KIRSCHEN D S, VOLKMANN T L. Guiding a power system restoration with an expert system. IEEE Trans on Power Systems, 1991, 6(2): 558-566.
    • (1991) IEEE Trans on Power Systems , vol.6 , Issue.2 , pp. 558-566
    • Kirschen, D.S.1    Volkmann, T.L.2
  • 13
    • 0027543855 scopus 로고
    • Generation capability dispatch for bulk power system restoration: A knowledge based approach
    • LIU C C, LIOU K L, CHU R F, et al. Generation capability dispatch for bulk power system restoration: a knowledge based approach. IEEE Trans on Power Systems, 1993, 8(1): 316-325.
    • (1993) IEEE Trans on Power Systems , vol.8 , Issue.1 , pp. 316-325
    • Liu, C.C.1    Liou, K.L.2    Chu, R.F.3
  • 15
    • 22344443240 scopus 로고    scopus 로고
    • Strategies and problems in black start of interconnected power grids
    • LIU Jun, LI Xingyuan, XU Xiufang. Strategies and problems in black start of interconnected power grids. Automation of Electric Power Systems, 2004, 28(5): 93-97.
    • (2004) Automation of Electric Power Systems , vol.28 , Issue.5 , pp. 93-97
    • Liu, J.1    Li, X.2    Xu, X.3
  • 16
    • 3242746897 scopus 로고    scopus 로고
    • Hierarchical case-based reasoning decision-making system for power system black start
    • WANG Hongtao, LIU Yutian, QIU Xizhao. Hierarchical case-based reasoning decision-making system for power system black start. Automation of Electric Power Systems, 2004, 28(11): 49-52.
    • (2004) Automation of Electric Power Systems , vol.28 , Issue.11 , pp. 49-52
    • Wang, H.1    Liu, Y.2    Qiu, X.3
  • 17
    • 4344676225 scopus 로고    scopus 로고
    • Development of a black start decision support system for the southern power network of Hebei Province
    • SU Desheng, GU Xueping, ZHAO Shuqiang, et al. Development of a black start decision support system for the southern power network of Hebei Province. Automation of Electric Power Systems, 2004, 28(12): 45-50.
    • (2004) Automation of Electric Power Systems , vol.28 , Issue.12 , pp. 45-50
    • Su, D.1    Gu, X.2    Zhao, S.3
  • 18
    • 4344628242 scopus 로고    scopus 로고
    • Automatic derivation and assessment of power system black-start schemes
    • GAO Yuanwang, GU Xueping, LIU Yan, et al. Automatic derivation and assessment of power system black-start schemes. Automation of Electric Power Systems, 2004, 28(13): 50-54.
    • (2004) Automation of Electric Power Systems , vol.28 , Issue.13 , pp. 50-54
    • Gao, Y.1    Gu, X.2    Liu, Y.3
  • 19
    • 33646345596 scopus 로고    scopus 로고
    • Data envelopment analysis based relative effectiveness assessment of power system black-start plans
    • LIU Yan, GU Xueping, ZHANG Dan. Data envelopment analysis based relative effectiveness assessment of power system black-start plans. Proceedings of the CSEE, 2006, 26(5): 32-37.
    • (2006) Proceedings of the CSEE , vol.26 , Issue.5 , pp. 32-37
    • Liu, Y.1    Gu, X.2    Zhang, D.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.