메뉴 건너뛰기




Volumn 26, Issue 5, 2006, Pages

Data envelopment analysis based relative effectiveness assessment of power system black-start plans

Author keywords

Black start; Data envelopment analysis; Power systems; System restoration

Indexed keywords

ELECTRIC POWER SYSTEMS; MATHEMATICAL MODELS;

EID: 33646345596     PISSN: 02588013     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (65)

References (33)
  • 1
    • 85009306136 scopus 로고    scopus 로고
    • Chinese source
  • 2
    • 3242770441 scopus 로고    scopus 로고
    • Preliminary analysis of large scale blackout in interconnected North America power grid on August 14 and lessons to be drawn
    • Yin Yonghua, Guo Jianbo, Zhao Jianjun, et al. Preliminary analysis of large scale blackout in interconnected North America power grid on August 14 and lessons to be drawn[J]. Power system technology, 2003, 27(10): 8-11.
    • (2003) Power system technology , vol.27 , Issue.10 , pp. 8-11
    • Yin, Y.1    Guo, J.2    Zhao, J.3
  • 3
    • 2342429662 scopus 로고    scopus 로고
    • Rethinking and enlightenment of large scope blackout in interconnected north America power grid
    • Hu Xuehao. Rethinking and enlightenment of large scope blackout in interconnected north America power grid[J]. Power system technology, 2003, 27(9): T2-T6.
    • (2003) Power System Technology , vol.27 , Issue.9
    • Hu, X.1
  • 4
    • 2542491170 scopus 로고    scopus 로고
    • Power system security and its prevention
    • Han Zhenxiang, Cao Yijia. Power system security and its prevention[J]. Power system technology, 2004, 28(9): 1-6.
    • (2004) Power System Technology , vol.28 , Issue.9 , pp. 1-6
    • Han, Z.1    Cao, Y.2
  • 5
    • 4344597453 scopus 로고    scopus 로고
    • Strengthen power system security to ensure reliable delivery
    • Zhao Xizheng. Strengthen power system security to ensure reliable delivery[J]. Power System Technology, 2003, 27(10): 1-7.
    • (2003) Power System Technology , vol.27 , Issue.10 , pp. 1-7
    • Zhao, X.1
  • 6
    • 13944282146 scopus 로고    scopus 로고
    • Analyses of two typical voltage collapse incidents worldwide
    • Liu Peng, Wu Gang. Analyses of two typical voltage collapse incidents worldwide[J]. Power System Technology, 2003, 27(5): 35-37.
    • (2003) Power System Technology , vol.27 , Issue.5 , pp. 35-37
    • Liu, P.1    Wu, G.2
  • 7
    • 9744271757 scopus 로고    scopus 로고
    • Rethinking over '8.14' US-Canada blackout after one year
    • He Deyu. Rethinking over '8.14' US-Canada blackout after one year[J]. Power System Technology, 2004, 28(21): 1-5.
    • (2004) Power System Technology , vol.28 , Issue.21 , pp. 1-5
    • He, D.1
  • 8
    • 23944520843 scopus 로고    scopus 로고
    • Self-organized criticality phenomenon for power system blackouts
    • Cao Yijia, Jiang Quanyuan, Ding Lijie. Self-organized criticality phenomenon for power system blackouts[J]. Power System Technology, 2005, 29(15) 1-5.
    • (2005) Power System Technology , vol.29 , Issue.15 , pp. 1-5
    • Cao, Y.1    Jiang, Q.2    Ding, L.3
  • 9
    • 4744356298 scopus 로고    scopus 로고
    • Blackout in south of London and its lessons
    • Tang Baosheng. Blackout in south of London and its lessons[J]. Power System Technology, 2003, 27(11): 1-5.
    • (2003) Power System Technology , vol.27 , Issue.11 , pp. 1-5
    • Tang, B.1
  • 10
    • 2542425554 scopus 로고    scopus 로고
    • Analysis on blackout of interconnected north America power grid occurred on aug. 14, 2003 from the viewpoint of power system dispatching
    • Liu Yongqi, Xie Kai. Analysis on blackout of interconnected north America power grid occurred on aug. 14, 2003 from the viewpoint of Power system dispatching[J]. Power System Technology, 28(8): 10-15,45.
    • (2003) Power System Technology , vol.28 , Issue.8
    • Liu, Y.1    Xie, K.2
  • 11
    • 85009328972 scopus 로고    scopus 로고
    • Chinese source
  • 12
    • 0025386520 scopus 로고
    • Simulation and field tests of the black start of a large coal-fired generating station utilizing small remote hydro generation
    • Lindstrom R R. Simulation and field tests of the black start of a large coal-fired generating station utilizing small remote hydro generation[J]. IEEE Trans. on Power Systems, 1990, 5(1): 162-168.
    • (1990) IEEE Trans. on Power Systems , vol.5 , Issue.1 , pp. 162-168
    • Lindstrom, R.R.1
  • 15
    • 0030216984 scopus 로고    scopus 로고
    • Black-start and restoration of a part of the Italian HV network: Modeling and simulation of a field test
    • Delfino B, Denegri G B, Invernizzi M, et al. Black-start and restoration of a part of the Italian HV network: modeling and simulation of a field test[J]. IEEE Trans. on Power Systems, 1996, 11(3): 1371-1379.
    • (1996) IEEE Trans. on Power Systems , vol.11 , Issue.3 , pp. 1371-1379
    • Delfino, B.1    Denegri, G.B.2    Invernizzi, M.3
  • 16
    • 10744226712 scopus 로고    scopus 로고
    • Transformer overvoltage problems and countermeasures at black start
    • Toronto, Ontario Canada
    • Funakoshi T, Furukawa K. Transformer overvoltage problems and countermeasures at black start[C]. IEEE PES General Meeting, Toronto, Ontario Canada, 2003.
    • (2003) IEEE PES General Meeting
    • Funakoshi, T.1    Furukawa, K.2
  • 17
    • 20044378566 scopus 로고    scopus 로고
    • Optimal algorithm for fast load recovery
    • Zhou Yunhai, Min Yong. Optimal algorithm for fast load recovery[J]. Proceedings of the CSEE, 2003, 23(3): 74-79.
    • (2003) Proceedings of the CSEE , vol.23 , Issue.3 , pp. 74-79
    • Zhou, Y.1    Min, Y.2
  • 18
    • 4744361088 scopus 로고    scopus 로고
    • Optimal algorithm for system reconstruction
    • Zhou Yunhai, Min Yong. Optimal algorithm for system reconstruction[J]. Proceedings of the CSEE, 2003, 23(4): 67-70.
    • (2003) Proceedings of the CSEE , vol.23 , Issue.4 , pp. 67-70
    • Zhou, Y.1    Min, Y.2
  • 19
    • 4744362262 scopus 로고    scopus 로고
    • Arrangement of priority sequence of thermal unit restoration on analytical hierarchy process model
    • Dong Zhangzhuo, Jiao Jianlin, Sun Qihong. Arrangement of priority sequence of thermal unit restoration on analytical hierarchy process model[J]. Power System Technology, 1997, 21(6): 48-51.
    • (1997) Power System Technology , vol.21 , Issue.6 , pp. 48-51
    • Dong, Z.1    Jiao, J.2    Sun, Q.3
  • 20
    • 19544383586 scopus 로고    scopus 로고
    • Power system restoration and analysis of restoration sequence of generating sets
    • Hu Jian, Guo Zhizhong, Liu Yingchun, et al. Power system restoration and analysis of restoration sequence of generating sets[J]. Power System Technology, 2004, 28(18): 1-4.
    • (2004) Power System Technology , vol.28 , Issue.18 , pp. 1-4
    • Hu, J.1    Guo, Z.2    Liu, Y.3
  • 21
    • 3242807450 scopus 로고    scopus 로고
    • A method to control sustained overvoltage during power system restoration
    • Cheng Gaihong, Xu Zheng. A method to control sustained overvoltage during power system restoration[J]. Power System Technology, 2004, 28(11): 29-33.
    • (2004) Power System Technology , vol.28 , Issue.11 , pp. 29-33
    • Cheng, G.1    Xu, Z.2
  • 22
    • 4344715727 scopus 로고    scopus 로고
    • Investigation of black start for north China power system by Shisanling hydroelectric generating sets
    • Wu Tao, Guo Jiayang, Li Huawei. Investigation of black start for north China power system by Shisanling hydroelectric generating sets[J]. Power System Technology, 2001, 25(3): 56-58.
    • (2001) Power System Technology , vol.25 , Issue.3 , pp. 56-58
    • Wu, T.1    Guo, J.2    Li, H.3
  • 23
    • 4344576121 scopus 로고    scopus 로고
    • Test and research of black start in North China power network
    • Guo Jiayang, Wu Tao, Zhang Renwei, et al. Test and research of black start in North China power network[J]. North China Electric Power, 2001, 5: 3-18.
    • (2001) North China Electric Power , vol.5 , pp. 3-18
    • Guo, J.1    Wu, T.2    Zhang, R.3
  • 24
    • 33646346805 scopus 로고    scopus 로고
    • The first research of east China power system black-start plan
    • Yu Weiyong, Fang Xinyan, Xiong Huimin. The first research of east China power system black-start plan[J]. Transaction of Power System and Automation, 2000, 12(2): 1-4.
    • (2000) Transaction of Power System and Automation , vol.12 , Issue.2 , pp. 1-4
    • Yu, W.1    Fang, X.2    Xiong, H.3
  • 25
    • 33646379300 scopus 로고    scopus 로고
    • A study on black-start scheme for Shanxi power network
    • Zhang Qiming, Wang Wanjun. A study on black-start scheme for Shanxi power network[J]. Power System Technology, 2002, 26(4): 42-48.
    • (2002) Power System Technology , vol.26 , Issue.4 , pp. 42-48
    • Zhang, Q.1    Wang, W.2
  • 26
    • 0026155714 scopus 로고
    • Guiding a power system restoration with an expert system
    • Kirschen D S, Volkmann T L. Guiding a power system restoration with an expert system[J]. IEEE Trans. on Power Systems, 1991, 6(2): 558-566.
    • (1991) IEEE Trans. on Power Systems , vol.6 , Issue.2 , pp. 558-566
    • Kirschen, D.S.1    Volkmann, T.L.2
  • 27
    • 0027543855 scopus 로고
    • Generation capability dispatch for bulk power system restoration: A knowledge-based approach
    • Liu C C, Liou K L, Chu R F, et al. Generation capability dispatch for bulk power system restoration: A knowledge-based approach[J]. IEEE Trans. on Power Systems, 1993, 8(1): 316-325.
    • (1993) IEEE Trans. on Power Systems , vol.8 , Issue.1 , pp. 316-325
    • Liu, C.C.1    Liou, K.L.2    Chu, R.F.3
  • 29
    • 0030082571 scopus 로고    scopus 로고
    • Knowledge-based behavior interface: Its application to power network restoration support system
    • Shinohara J, Kozakai I. Knowledge-based behavior interface: its application to power network restoration support system[J]. IEEE Trans. on Power Systems, 1996, 11(1): 383-389.
    • (1996) IEEE Trans. on Power Systems , vol.11 , Issue.1 , pp. 383-389
    • Shinohara, J.1    Kozakai, I.2
  • 30
    • 3242746897 scopus 로고    scopus 로고
    • Hierarchical case-based reasoning decision-making system for power system black start
    • Wang Hongtao, Liu Yutian, Qiu Xizhao. Hierarchical case-based reasoning decision-making system for power system black start[J]. Automation of Electric Power Systems, 2004, 28(11): 49-52.
    • (2004) Automation of Electric Power Systems , vol.28 , Issue.11 , pp. 49-52
    • Wang, H.1    Liu, Y.2    Qiu, X.3
  • 31
    • 4344676225 scopus 로고    scopus 로고
    • Development of a black start decision support system for the southern power network of Hebei province
    • Su Desheng, Gu Xueping, Zhao Shuqiang, et al. Development of a black start decision support system for the southern power network of Hebei province[J]. Automation of Electric Power Systems, 2004, 28(12): 45-50.
    • (2004) Automation of Electric Power Systems , vol.28 , Issue.12 , pp. 45-50
    • Su, D.1    Gu, X.2    Zhao, S.3
  • 32
    • 4344628242 scopus 로고    scopus 로고
    • Automatic derivation and assessment of power system black-start schemes
    • Gao Yuanwang, Gu Xueping, Liu Yan, et al. Automatic derivation and assessment of power system black-start schemes[J]. Automation of Electric Power Systems, 2004, 28(13): 50-54.
    • (2004) Automation of Electric Power Systems , vol.28 , Issue.13 , pp. 50-54
    • Gao, Y.1    Gu, X.2    Liu, Y.3
  • 33
    • 85009332751 scopus 로고    scopus 로고
    • Chinese source


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.