-
1
-
-
0006526815
-
A Stochastic Network Scheduling System for Optimum Resource Utilization. Unpublished Phd thesis, University of Bradford
-
AKPAN, E. O. P., 1987, A Stochastic Network Scheduling System for Optimum Resource Utilization. Unpublished Phd thesis, University of Bradford.
-
(1987)
-
-
Akpan, E.O.P.1
-
4
-
-
0002679297
-
Variation in activity level on a cyclical arrow diagram
-
BURGESS, A.R., and KILLEBREW, J. B., 1962, Variation in activity level on a cyclical arrow diagram. Journal of Industrial Engineering, 13, 76-83.
-
(1962)
Journal of Industrial Engineering
, vol.13
, pp. 76-83
-
-
Burgess, A.R.1
Killebrew, J.B.2
-
5
-
-
0016046551
-
Network resource allocation. Journal of Industrial Engineering
-
DAVIS, E. W., 1974, Network resource allocation. Journal of Industrial Engineering, 24(4)22-32.
-
(1974)
, vol.24
, Issue.4
, pp. 22-32
-
-
Davis, E.W.1
-
6
-
-
6244290351
-
Comparison of three heuristic procedures for allocating resources and producing schedules
-
GONGUET, L., 1969, Comparison of three heuristic procedures for allocating resources and producing schedules. In Project Planning by Network Models (North Holland, Amsterdam).
-
(1969)
Project Planning by Network Models
-
-
Gonguet, L.1
-
7
-
-
0015359193
-
On resource allocation in project network
-
HASTINGS, N. A. J., 1972, On resource allocation in project network. Operational Research Quarterly, 23, 217-221.
-
(1972)
Operational Research Quarterly
, vol.23
, pp. 217-221
-
-
Hastings, N.A.J.1
-
8
-
-
0002866635
-
The critical pathmethod, resource planning and scheduling, in Muth and Thompson
-
KELLY, J. E., 1963, The critical pathmethod, resource planning and scheduling, in Muth and Thompson (eds) Industrial Scheduling (Prentice-Hall, Englewood Cliffs, NJ) Chapter 2.
-
(1963)
Industrial Scheduling
-
-
Kelly, J.E.1
-
10
-
-
0003906655
-
Project Management With CPM & PERT
-
MODER, J. J. and Phillips, C. R., 1970, Project Management With CPM & PERT, 2nd edn (Van Nostrand Reinhold, New York).
-
(1970)
-
-
Moder, J.J.1
Phillips, C.R.2
-
11
-
-
0016058053
-
Network analysis with GERTS III QR
-
MUGGARD, M. J., LESSO, W., KEATING, R. J., and WEXTER, M. J., 1974, Network analysis with GERTS III QR. Journal of Industrial Engineering, 5(5), 24-29.
-
(1974)
Journal of Industrial Engineering
, vol.5
, Issue.5
, pp. 24-29
-
-
Muggard, M.J.1
Lesso, W.2
Keating, R.J.3
Wexter, M.J.4
-
12
-
-
6244253250
-
Resource allocation/levelling in engineering/construction projects
-
PRABHAKER, T., 1970, Resource allocation/levelling in engineering/construction projects. Paper presented at 37th Meeting of ORSA, pp. 20-22.
-
(1970)
Paper Presented at 37Th Meeting of ORSA
, pp. 20-22
-
-
Prabhaker, T.1
-
13
-
-
0014574409
-
Multiproject scheduling with limited resources: A zero-one programming approach
-
PRITSKER, A. B., WATTERS, L. J., and WOLFE, P. M., 1969, Multiproject scheduling with limited resources: a zero-one programming approach. Management Science, 16, 93-108.
-
(1969)
Management Science
, vol.16
, pp. 93-108
-
-
Pritsker, A.B.1
Watters, L.J.2
Wolfe, P.M.3
-
14
-
-
0001694940
-
A heuristic model for scheduling large projects with limited resources
-
WEIST, J. D., 1967, A heuristic model for scheduling large projects with limited resources. Management Science, 13, B359-B377.
-
(1967)
Management Science
, vol.13
, pp. B359-B377
-
-
Weist, J.D.1
|