메뉴 건너뛰기




Volumn 8, Issue 5, 1997, Pages 462-

Optimum resource determination for project scheduling

Author keywords

Constraining index; Critical path technique; Project scheduling; Resource utilization; Work content

Indexed keywords

CRITICAL PATH ANALYSIS; HEURISTIC METHODS; INDUSTRIAL MANAGEMENT; OPTIMIZATION; RESOURCE ALLOCATION; SENSITIVITY ANALYSIS;

EID: 85008862604     PISSN: 09537287     EISSN: 13665871     Source Type: Journal    
DOI: 10.1080/095372897235037     Document Type: Article
Times cited : (13)

References (14)
  • 1
    • 0006526815 scopus 로고
    • A Stochastic Network Scheduling System for Optimum Resource Utilization. Unpublished Phd thesis, University of Bradford
    • AKPAN, E. O. P., 1987, A Stochastic Network Scheduling System for Optimum Resource Utilization. Unpublished Phd thesis, University of Bradford.
    • (1987)
    • Akpan, E.O.P.1
  • 5
    • 0016046551 scopus 로고
    • Network resource allocation. Journal of Industrial Engineering
    • DAVIS, E. W., 1974, Network resource allocation. Journal of Industrial Engineering, 24(4)22-32.
    • (1974) , vol.24 , Issue.4 , pp. 22-32
    • Davis, E.W.1
  • 6
    • 6244290351 scopus 로고
    • Comparison of three heuristic procedures for allocating resources and producing schedules
    • GONGUET, L., 1969, Comparison of three heuristic procedures for allocating resources and producing schedules. In Project Planning by Network Models (North Holland, Amsterdam).
    • (1969) Project Planning by Network Models
    • Gonguet, L.1
  • 7
    • 0015359193 scopus 로고
    • On resource allocation in project network
    • HASTINGS, N. A. J., 1972, On resource allocation in project network. Operational Research Quarterly, 23, 217-221.
    • (1972) Operational Research Quarterly , vol.23 , pp. 217-221
    • Hastings, N.A.J.1
  • 8
    • 0002866635 scopus 로고
    • The critical pathmethod, resource planning and scheduling, in Muth and Thompson
    • KELLY, J. E., 1963, The critical pathmethod, resource planning and scheduling, in Muth and Thompson (eds) Industrial Scheduling (Prentice-Hall, Englewood Cliffs, NJ) Chapter 2.
    • (1963) Industrial Scheduling
    • Kelly, J.E.1
  • 10
    • 0003906655 scopus 로고
    • Project Management With CPM & PERT
    • MODER, J. J. and Phillips, C. R., 1970, Project Management With CPM & PERT, 2nd edn (Van Nostrand Reinhold, New York).
    • (1970)
    • Moder, J.J.1    Phillips, C.R.2
  • 12
    • 6244253250 scopus 로고
    • Resource allocation/levelling in engineering/construction projects
    • PRABHAKER, T., 1970, Resource allocation/levelling in engineering/construction projects. Paper presented at 37th Meeting of ORSA, pp. 20-22.
    • (1970) Paper Presented at 37Th Meeting of ORSA , pp. 20-22
    • Prabhaker, T.1
  • 13
    • 0014574409 scopus 로고
    • Multiproject scheduling with limited resources: A zero-one programming approach
    • PRITSKER, A. B., WATTERS, L. J., and WOLFE, P. M., 1969, Multiproject scheduling with limited resources: a zero-one programming approach. Management Science, 16, 93-108.
    • (1969) Management Science , vol.16 , pp. 93-108
    • Pritsker, A.B.1    Watters, L.J.2    Wolfe, P.M.3
  • 14
    • 0001694940 scopus 로고
    • A heuristic model for scheduling large projects with limited resources
    • WEIST, J. D., 1967, A heuristic model for scheduling large projects with limited resources. Management Science, 13, B359-B377.
    • (1967) Management Science , vol.13 , pp. B359-B377
    • Weist, J.D.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.