Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression
-
Attalla, M. and Hegazy, T. (2003) Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression. ASCE Journal of Construction Engineering and Management, 129((4)), pp. 405-11.
-
(2003)
ASCE Journal of Construction Engineering and Management
, vol.129
, Issue.4
, pp. 405-411
-
-
Attalla, M.1
Hegazy, T.2
-
2
-
-
0002232162
-
Contract time performance-expectation and the reality
-
Bromilow, F. J. (1969) Contract time performance-expectation and the reality. Building Forum, 1((3)), pp. 70-80.
-
(1969)
Building Forum
, vol.1
, Issue.3
, pp. 70-80
-
-
Bromilow, F.J.1
-
3
-
-
0001916379
-
AIQS survey of building contract time performance
-
Bromilow, F. J. and Hinds, M. F. and Moody, N. F. (1980) AIQS survey of building contract time performance. Building Economist, 19((2)), pp. 79-82.
-
(1980)
Building Economist
, vol.19
, Issue.2
, pp. 79-82
-
-
Bromilow, F.J.1
Hinds, M.F.2
Moody, N.F.3
-
4
-
-
0001013815
-
Modelling building durations in Hong Kong
-
Chan, A. P. C. (1999) Modelling building durations in Hong Kong. Construction Management and Economics, 17((2)), pp. 189-96.
-
(1999)
Construction Management and Economics
, vol.17
, Issue.2
, pp. 189-196
-
-
Chan, A.P.C.1
-
5
-
-
0035040471
-
Time-cost relationship of public sector projects in Malaysia
-
Chan, A. P. C. (2001) Time-cost relationship of public sector projects in Malaysia. International Journal of Project Management, 19((4)), pp. 223-9.
-
(2001)
International Journal of Project Management
, vol.19
, Issue.4
, pp. 223-229
-
-
Chan, A.P.C.1
-
6
-
-
84948516864
-
A study of the factors affecting construction durations in Hong Kong
-
Chan, D. W. M. and Kumaraswamy, M. M. (1995) A study of the factors affecting construction durations in Hong Kong. Construction Management and Economics, 13((4)), pp. 319-33.
-
(1995)
Construction Management and Economics
, vol.13
, Issue.4
, pp. 319-333
-
-
Chan, D.W.M.1
Kumaraswamy, M.M.2
-
7
-
-
0032774744
-
Modelling and predicting construction durations in Hong Kong public housing
-
Chan, D. W. M. and Kumaraswamy, M. M. (1999) Modelling and predicting construction durations in Hong Kong public housing. Construction Management and Economics, 17((3)), pp. 351-62.
-
(1999)
Construction Management and Economics
, vol.17
, Issue.3
, pp. 351-362
-
-
Chan, D.W.M.1
Kumaraswamy, M.M.2
-
8
-
-
0036744325
-
Data modelling and the application of a neural network approach to the prediction of total construction costs
-
Emsley, M. W. and Lowe, D. J. and Duff, A. R. and Harding, A. and Hickson, A. (2002) Data modelling and the application of a neural network approach to the prediction of total construction costs. Construction Management and Economics, 20((6)), pp. 465-73.
-
(2002)
Construction Management and Economics
, vol.20
, Issue.6
, pp. 465-473
-
-
Emsley, M.W.1
Lowe, D.J.2
Duff, A.R.3
Harding, A.4
Hickson, A.5
-
9
-
-
0032916564
-
An evaluation of the accuracy of the multiple regression approach in forecasting sectoral construction demand in Singapore
-
Goh, B. H. (1999) An evaluation of the accuracy of the multiple regression approach in forecasting sectoral construction demand in Singapore. Construction Management and Economics, 17((2)), pp. 231-42.
-
(1999)
Construction Management and Economics
, vol.17
, Issue.2
, pp. 231-242
-
-
Goh, B.H.1
-
10
-
-
0001845897
-
The role of managerial actions in the cost, time and quality performance
-
Ireland, V. (1985) The role of managerial actions in the cost, time and quality performance. Construction Management and Economics, 3((1)), pp. 59-87.
-
(1985)
Construction Management and Economics
, vol.3
, Issue.1
, pp. 59-87
-
-
Ireland, V.1
-
11
-
-
0026839734
-
Exchange place station subsurface reconstruction and improvements
-
Kerr, W. C. and Tamaro, G. J. and Hahn, D. M. (1992) Exchange place station subsurface reconstruction and improvements. ASCE Journal of Construction Engineering and Management, 118((1)), pp. 166-78.
-
(1992)
ASCE Journal of Construction Engineering and Management
, vol.118
, Issue.1
, pp. 166-178
-
-
Kerr, W.C.1
Tamaro, G.J.2
Hahn, D.M.3
-
12
-
-
0030169908
-
Success or failure: A tale of two projects
-
(N.Y.)
-
Kritzek, D. and Lavon, B. (1996) Success or failure: A tale of two projects. Civil Engineering, 66((46)), pp. 62-3. (N.Y.)
-
(1996)
Civil Engineering
, vol.66
, Issue.46
, pp. 62-63
-
-
Kritzek, D.1
Lavon, B.2
-
13
-
-
0031116892
-
Everything old is new again
-
(N.Y.)
-
Krug, T. (1997) Everything old is new again. Civil Engineering, 67((4)), pp. 58-60. (N.Y.)
-
(1997)
Civil Engineering
, vol.67
, Issue.4
, pp. 58-60
-
-
Krug, T.1
-
15
-
-
0004073479
-
-
NEDO In London: National Economic Development Office
-
NEDO.(1983). In Faster Building for Industry. London: National Economic Development Office.
-
(1983)
Faster Building for Industry
-
-
-
16
-
-
0003853476
-
-
NEDO In London: National Economic Development Office
-
NEDO.(1988). In Faster Building for Commerce. London: National Economic Development Office.
-
(1988)
Faster Building for Commerce
-
-
-
17
-
-
0002520528
-
A general framework for parallel distributed processing
-
in Rumelhart, D.E., McClelland, J.L. and the PDP Research Group (eds) Cambridge, MA. MIT Press
-
Rumelhart, D. E. and Hinton, G. E. and McClelland, J. L. (1986a) A general framework for parallel distributed processing Parallel Distributed Processing, pp. 45-76. in Rumelhart, D.E., McClelland, J.L. and the PDP Research Group (eds) Cambridge, MA. MIT Press
-
(1986)
Parallel Distributed Processing
, pp. 45-76
-
-
Rumelhart, D.E.1
Hinton, G.E.2
McClelland, J.L.3
-
18
-
-
0000646059
-
Learning internal representations by error propagation
-
in Rumelhart, D.E., McClelland, J.L. and the PDP Research Group (eds) Cambridge, MA. MIT Press
-
Rumelhart, D. E. and Hinton, G. E. and Williams, R. J. (1986b) Learning internal representations by error propagation Parallel Distributed Processing, pp. 318-62. in Rumelhart, D.E., McClelland, J.L. and the PDP Research Group (eds) Cambridge, MA. MIT Press
-
(1986)
Parallel Distributed Processing
, pp. 318-362
-
-
Rumelhart, D.E.1
Hinton, G.E.2
Williams, R.J.3
-
19
-
-
0000331042
-
An investigation into construction time performance
-
Walker, D. H. T. (1995) An investigation into construction time performance. Construction Management and Economics, 13((3)), pp. 263-74.
-
(1995)
Construction Management and Economics
, vol.13
, Issue.3
, pp. 263-274
-
-
Walker, D.H.T.1
-
20
-
-
0036540409
-
Predicting completed project cost using bidding data
-
Williams, T. P. (2002) Predicting completed project cost using bidding data. Construction Management and Economics, 20((3)), pp. 225-35.
-
(2002)
Construction Management and Economics
, vol.20
, Issue.3
, pp. 225-235
-
-
Williams, T.P.1
-
21
-
-
33845710232
-
Rationalization of contract duration of infrastructure
-
In. Research report of Public Construction Commission, Executive Yuan
-
Wu, Z. F. and Yu, W. D. and Yang, J. B.(2002) Rationalization of contract duration of infrastructure. In. Research report of Public Construction Commission, Executive Yuan
-
(2002)
-
-
Wu, Z.F.1
Yu, W.D.2
Yang, J.B.3
-
22
-
-
0037809594
-
Contractor selection by the most advantageous tendering approach in Taiwan
-
Yang, J. B. and Wang, W. C. (2003) Contractor selection by the most advantageous tendering approach in Taiwan. Journal of the Chinese Institute of Engineers, 26((3)), pp. 381-7.
-
(2003)
Journal of the Chinese Institute of Engineers
, vol.26
, Issue.3
, pp. 381-387
-
-
Yang, J.B.1
Wang, W.C.2
|