-
1
-
-
0023295433
-
An extension of the extended basic period approach for economic lot scheduling problems
-
Axsäter S. An extension of the extended basic period approach for economic lot scheduling problems. Journal of Optimization Theory and Applications 52 2 (1987) 179-189
-
(1987)
Journal of Optimization Theory and Applications
, vol.52
, Issue.2
, pp. 179-189
-
-
Axsäter, S.1
-
2
-
-
0000326705
-
A dynamic programming approach to a lot size scheduling problem
-
Bomberger E. A dynamic programming approach to a lot size scheduling problem. Management Science 12 11 (1966) 778-784
-
(1966)
Management Science
, vol.12
, Issue.11
, pp. 778-784
-
-
Bomberger, E.1
-
3
-
-
9544253909
-
Lot sizes in a capacity constrained facility - a simulation study of stationary stochastic demand
-
Brander P., Levén E., and Segerstedt A. Lot sizes in a capacity constrained facility - a simulation study of stationary stochastic demand. International Journal of Production Economics 93-94 (2005) 375-386
-
(2005)
International Journal of Production Economics
, vol.93-94
, pp. 375-386
-
-
Brander, P.1
Levén, E.2
Segerstedt, A.3
-
4
-
-
0015401407
-
Forecasting and stock control for intermittent demands
-
Croston J.D. Forecasting and stock control for intermittent demands. Operational Research Quarterly 42 3 (1972) 289-303
-
(1972)
Operational Research Quarterly
, vol.42
, Issue.3
, pp. 289-303
-
-
Croston, J.D.1
-
5
-
-
0026895316
-
The cyclic lot scheduling problem with sequence-dependent setups
-
Dobson G. The cyclic lot scheduling problem with sequence-dependent setups. Operations Research 40 4 (1992) 736-749
-
(1992)
Operations Research
, vol.40
, Issue.4
, pp. 736-749
-
-
Dobson, G.1
-
6
-
-
0015669867
-
An iterative procedure for the single-machine multi-product lot scheduling problem
-
Doll C.L., and Whybark D.C. An iterative procedure for the single-machine multi-product lot scheduling problem. Management Science 20 1 (1973) 50-55
-
(1973)
Management Science
, vol.20
, Issue.1
, pp. 50-55
-
-
Doll, C.L.1
Whybark, D.C.2
-
7
-
-
0017931081
-
The economic lot scheduling problem (ELSP): Review and extensions
-
Elmaghraby S.E. The economic lot scheduling problem (ELSP): Review and extensions. Management Science 24 6 (1978) 587-598
-
(1978)
Management Science
, vol.24
, Issue.6
, pp. 587-598
-
-
Elmaghraby, S.E.1
-
8
-
-
0025564737
-
Scheduling the production of several items with random demands in a single facility
-
Gallego G.M. Scheduling the production of several items with random demands in a single facility. Management Science 36 12 (1990) 1579-1592
-
(1990)
Management Science
, vol.36
, Issue.12
, pp. 1579-1592
-
-
Gallego, G.M.1
-
9
-
-
84984477151
-
Exponential smoothing: The state of the art
-
Gardner Jr. E.S. Exponential smoothing: The state of the art. Journal of Forecasting 4 (1985) 1-28
-
(1985)
Journal of Forecasting
, vol.4
, pp. 1-28
-
-
Gardner Jr., E.S.1
-
10
-
-
0028393317
-
Multi-item, single-machine scheduling problem with stochastic demands: A comparison of heuristics
-
Gascon A., Leachman R.C., and Lefrançois P. Multi-item, single-machine scheduling problem with stochastic demands: A comparison of heuristics. International Journal of Production Research 32 (1994) 583-596
-
(1994)
International Journal of Production Research
, vol.32
, pp. 583-596
-
-
Gascon, A.1
Leachman, R.C.2
Lefrançois, P.3
-
11
-
-
0016553281
-
Scheduling a single machine multi-product system: A new approach
-
Goyal S.K. Scheduling a single machine multi-product system: A new approach. International Journal of Production Research 13 (1975) 487-493
-
(1975)
International Journal of Production Research
, vol.13
, pp. 487-493
-
-
Goyal, S.K.1
-
12
-
-
0019057204
-
The multi-product production cycling problem
-
Graves S.C. The multi-product production cycling problem. AIIE Transactions 12 (1980) 233-240
-
(1980)
AIIE Transactions
, vol.12
, pp. 233-240
-
-
Graves, S.C.1
-
14
-
-
0023977009
-
A heuristic scheduling policy for multi-item, single-machine production systems with time-varying, stochastic demands
-
Leachman R.C., and Gascon A. A heuristic scheduling policy for multi-item, single-machine production systems with time-varying, stochastic demands. Management Science 34 3 (1988) 377-390
-
(1988)
Management Science
, vol.34
, Issue.3
, pp. 377-390
-
-
Leachman, R.C.1
Gascon, A.2
-
15
-
-
0039893556
-
Note: An improvement to the dynamic cycle lengths heuristic for scheduling the multi-item, single-machine
-
Leachman R.C., Xiong Z.K., Gascon A., and Park K. Note: An improvement to the dynamic cycle lengths heuristic for scheduling the multi-item, single-machine. Management Science 37 9 (1991) 1201-1205
-
(1991)
Management Science
, vol.37
, Issue.9
, pp. 1201-1205
-
-
Leachman, R.C.1
Xiong, Z.K.2
Gascon, A.3
Park, K.4
-
16
-
-
2942642468
-
Inventory control with a modified Croston procedure and Erlang distribution
-
Levén E., and Segerstedt A. Inventory control with a modified Croston procedure and Erlang distribution. International Journal of Production Economics 90 (2004) 361-367
-
(2004)
International Journal of Production Economics
, vol.90
, pp. 361-367
-
-
Levén, E.1
Segerstedt, A.2
-
18
-
-
0032689646
-
Lot sizes in a capacity constrained facility with available initial inventories
-
Segerstedt A. Lot sizes in a capacity constrained facility with available initial inventories. International Journal of Production Economics 59 (1999) 469-475
-
(1999)
International Journal of Production Economics
, vol.59
, pp. 469-475
-
-
Segerstedt, A.1
-
20
-
-
0017933645
-
Scheduling rules for the multiple product single machine system with stochastic demand
-
Vergin R.C., and Lee T.N. Scheduling rules for the multiple product single machine system with stochastic demand. INFOR 16 1 (1978) 64-73
-
(1978)
INFOR
, vol.16
, Issue.1
, pp. 64-73
-
-
Vergin, R.C.1
Lee, T.N.2
-
21
-
-
0037125656
-
A search heuristic for sequence-dependent economic lot scheduling problem
-
Wagner B.J., and Davis D.J. A search heuristic for sequence-dependent economic lot scheduling problem. European Journal of Operational Research 141 1 (2002) 133-146
-
(2002)
European Journal of Operational Research
, vol.141
, Issue.1
, pp. 133-146
-
-
Wagner, B.J.1
Davis, D.J.2
|