메뉴 건너뛰기




Volumn 179, Issue 2, 2007, Pages 414-423

A scheduling policy for adjusting economic lot quantities to a feasible solution

Author keywords

Capacity constrained; ELSP; Initial inventories; Lot sizing; Scheduling

Indexed keywords

ELECTRONIC COMMERCE; HEURISTIC METHODS; INVENTORY CONTROL; PUBLIC POLICY;

EID: 33751407199     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2006.03.038     Document Type: Article
Times cited : (25)

References (22)
  • 1
    • 0023295433 scopus 로고
    • An extension of the extended basic period approach for economic lot scheduling problems
    • Axsäter S. An extension of the extended basic period approach for economic lot scheduling problems. Journal of Optimization Theory and Applications 52 2 (1987) 179-189
    • (1987) Journal of Optimization Theory and Applications , vol.52 , Issue.2 , pp. 179-189
    • Axsäter, S.1
  • 2
    • 0000326705 scopus 로고
    • A dynamic programming approach to a lot size scheduling problem
    • Bomberger E. A dynamic programming approach to a lot size scheduling problem. Management Science 12 11 (1966) 778-784
    • (1966) Management Science , vol.12 , Issue.11 , pp. 778-784
    • Bomberger, E.1
  • 3
    • 9544253909 scopus 로고    scopus 로고
    • Lot sizes in a capacity constrained facility - a simulation study of stationary stochastic demand
    • Brander P., Levén E., and Segerstedt A. Lot sizes in a capacity constrained facility - a simulation study of stationary stochastic demand. International Journal of Production Economics 93-94 (2005) 375-386
    • (2005) International Journal of Production Economics , vol.93-94 , pp. 375-386
    • Brander, P.1    Levén, E.2    Segerstedt, A.3
  • 4
    • 0015401407 scopus 로고
    • Forecasting and stock control for intermittent demands
    • Croston J.D. Forecasting and stock control for intermittent demands. Operational Research Quarterly 42 3 (1972) 289-303
    • (1972) Operational Research Quarterly , vol.42 , Issue.3 , pp. 289-303
    • Croston, J.D.1
  • 5
    • 0026895316 scopus 로고
    • The cyclic lot scheduling problem with sequence-dependent setups
    • Dobson G. The cyclic lot scheduling problem with sequence-dependent setups. Operations Research 40 4 (1992) 736-749
    • (1992) Operations Research , vol.40 , Issue.4 , pp. 736-749
    • Dobson, G.1
  • 6
    • 0015669867 scopus 로고
    • An iterative procedure for the single-machine multi-product lot scheduling problem
    • Doll C.L., and Whybark D.C. An iterative procedure for the single-machine multi-product lot scheduling problem. Management Science 20 1 (1973) 50-55
    • (1973) Management Science , vol.20 , Issue.1 , pp. 50-55
    • Doll, C.L.1    Whybark, D.C.2
  • 7
    • 0017931081 scopus 로고
    • The economic lot scheduling problem (ELSP): Review and extensions
    • Elmaghraby S.E. The economic lot scheduling problem (ELSP): Review and extensions. Management Science 24 6 (1978) 587-598
    • (1978) Management Science , vol.24 , Issue.6 , pp. 587-598
    • Elmaghraby, S.E.1
  • 8
    • 0025564737 scopus 로고
    • Scheduling the production of several items with random demands in a single facility
    • Gallego G.M. Scheduling the production of several items with random demands in a single facility. Management Science 36 12 (1990) 1579-1592
    • (1990) Management Science , vol.36 , Issue.12 , pp. 1579-1592
    • Gallego, G.M.1
  • 9
    • 84984477151 scopus 로고
    • Exponential smoothing: The state of the art
    • Gardner Jr. E.S. Exponential smoothing: The state of the art. Journal of Forecasting 4 (1985) 1-28
    • (1985) Journal of Forecasting , vol.4 , pp. 1-28
    • Gardner Jr., E.S.1
  • 10
    • 0028393317 scopus 로고
    • Multi-item, single-machine scheduling problem with stochastic demands: A comparison of heuristics
    • Gascon A., Leachman R.C., and Lefrançois P. Multi-item, single-machine scheduling problem with stochastic demands: A comparison of heuristics. International Journal of Production Research 32 (1994) 583-596
    • (1994) International Journal of Production Research , vol.32 , pp. 583-596
    • Gascon, A.1    Leachman, R.C.2    Lefrançois, P.3
  • 11
    • 0016553281 scopus 로고
    • Scheduling a single machine multi-product system: A new approach
    • Goyal S.K. Scheduling a single machine multi-product system: A new approach. International Journal of Production Research 13 (1975) 487-493
    • (1975) International Journal of Production Research , vol.13 , pp. 487-493
    • Goyal, S.K.1
  • 12
    • 0019057204 scopus 로고
    • The multi-product production cycling problem
    • Graves S.C. The multi-product production cycling problem. AIIE Transactions 12 (1980) 233-240
    • (1980) AIIE Transactions , vol.12 , pp. 233-240
    • Graves, S.C.1
  • 14
    • 0023977009 scopus 로고
    • A heuristic scheduling policy for multi-item, single-machine production systems with time-varying, stochastic demands
    • Leachman R.C., and Gascon A. A heuristic scheduling policy for multi-item, single-machine production systems with time-varying, stochastic demands. Management Science 34 3 (1988) 377-390
    • (1988) Management Science , vol.34 , Issue.3 , pp. 377-390
    • Leachman, R.C.1    Gascon, A.2
  • 15
    • 0039893556 scopus 로고
    • Note: An improvement to the dynamic cycle lengths heuristic for scheduling the multi-item, single-machine
    • Leachman R.C., Xiong Z.K., Gascon A., and Park K. Note: An improvement to the dynamic cycle lengths heuristic for scheduling the multi-item, single-machine. Management Science 37 9 (1991) 1201-1205
    • (1991) Management Science , vol.37 , Issue.9 , pp. 1201-1205
    • Leachman, R.C.1    Xiong, Z.K.2    Gascon, A.3    Park, K.4
  • 16
    • 2942642468 scopus 로고    scopus 로고
    • Inventory control with a modified Croston procedure and Erlang distribution
    • Levén E., and Segerstedt A. Inventory control with a modified Croston procedure and Erlang distribution. International Journal of Production Economics 90 (2004) 361-367
    • (2004) International Journal of Production Economics , vol.90 , pp. 361-367
    • Levén, E.1    Segerstedt, A.2
  • 18
    • 0032689646 scopus 로고    scopus 로고
    • Lot sizes in a capacity constrained facility with available initial inventories
    • Segerstedt A. Lot sizes in a capacity constrained facility with available initial inventories. International Journal of Production Economics 59 (1999) 469-475
    • (1999) International Journal of Production Economics , vol.59 , pp. 469-475
    • Segerstedt, A.1
  • 20
    • 0017933645 scopus 로고
    • Scheduling rules for the multiple product single machine system with stochastic demand
    • Vergin R.C., and Lee T.N. Scheduling rules for the multiple product single machine system with stochastic demand. INFOR 16 1 (1978) 64-73
    • (1978) INFOR , vol.16 , Issue.1 , pp. 64-73
    • Vergin, R.C.1    Lee, T.N.2
  • 21
    • 0037125656 scopus 로고    scopus 로고
    • A search heuristic for sequence-dependent economic lot scheduling problem
    • Wagner B.J., and Davis D.J. A search heuristic for sequence-dependent economic lot scheduling problem. European Journal of Operational Research 141 1 (2002) 133-146
    • (2002) European Journal of Operational Research , vol.141 , Issue.1 , pp. 133-146
    • Wagner, B.J.1    Davis, D.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.