메뉴 건너뛰기




Volumn 141, Issue 1, 2002, Pages 133-146

A search heuristic for the sequence-dependent economic lot scheduling problem

Author keywords

Heuristics; Lot sizing; Optimization; Scheduling theory; Traveling salesman

Indexed keywords

HEURISTIC METHODS; OPTIMIZATION; PROBLEM SOLVING; TRAVELING SALESMAN PROBLEM;

EID: 0037125656     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0377-2217(01)00265-X     Document Type: Article
Times cited : (30)

References (19)
  • 4
    • 0023420909 scopus 로고
    • The economic lot-scheduling problem: Achieving feasibility using time-varying lot sizes
    • (1987) Operations Research , vol.35 , Issue.5 , pp. 764-771
    • Dobson, G.1
  • 13
    • 0001428478 scopus 로고
    • Scheduling a multi-product single machine system for an infinite planning period
    • (1968) Management Science , vol.14 , Issue.11 , pp. 713-719
    • Madigan, J.G.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.