메뉴 건너뛰기




Volumn 177, Issue 1, 2007, Pages 147-162

Cyclic multiple-robot scheduling with time-window constraints using a critical path approach

Author keywords

Critical path; Cyclic scheduling; Parametric PERT CPM model; Production transportation process; Robotic scheduling; Time windows

Indexed keywords

CONSTRAINT THEORY; GRAPH THEORY; POLYNOMIALS; PROBLEM SOLVING; ROBOTS;

EID: 33751038549     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2005.11.019     Document Type: Article
Times cited : (29)

References (21)
  • 2
    • 0004283530 scopus 로고
    • Cleland D.I., and King R.W. (Eds), Van Nostrand-Reinhold, NY
    • In: Cleland D.I., and King R.W. (Eds). Project Management Handbook (1988), Van Nostrand-Reinhold, NY
    • (1988) Project Management Handbook
  • 4
    • 0002591492 scopus 로고
    • Cyclic scheduling problems: An overview
    • Chretienne P., Coffman E.G., Lenstra J.K., and Liu Z. (Eds), Wiley, New York
    • Hanen C., and Munier A. Cyclic scheduling problems: An overview. In: Chretienne P., Coffman E.G., Lenstra J.K., and Liu Z. (Eds). Scheduling Theory and its Applications (1994), Wiley, New York
    • (1994) Scheduling Theory and its Applications
    • Hanen, C.1    Munier, A.2
  • 6
    • 0041682131 scopus 로고
    • Minimal quantity of operators for serving a homogeneous linear technological process
    • Part 2
    • Karzanov A.V., and Livshits E.M. Minimal quantity of operators for serving a homogeneous linear technological process. Automation and Remote Control 39 3 (1978) 538-542 Part 2
    • (1978) Automation and Remote Control , vol.39 , Issue.3 , pp. 538-542
    • Karzanov, A.V.1    Livshits, E.M.2
  • 7
    • 2442517409 scopus 로고
    • An exact optimal cyclic scheduling algorithm for multioperator service of a production line
    • Kats V.B. An exact optimal cyclic scheduling algorithm for multioperator service of a production line. Automation and Remote Control 43 4 (1982) 538-542
    • (1982) Automation and Remote Control , vol.43 , Issue.4 , pp. 538-542
    • Kats, V.B.1
  • 8
    • 0031269154 scopus 로고    scopus 로고
    • A strongly polynomial algorithm for no-wait cyclic robotic flowshop scheduling
    • Kats V., and Levner E. A strongly polynomial algorithm for no-wait cyclic robotic flowshop scheduling. Operations Research Letters 21 (1997) 171-179
    • (1997) Operations Research Letters , vol.21 , pp. 171-179
    • Kats, V.1    Levner, E.2
  • 10
    • 0031635632 scopus 로고    scopus 로고
    • A polynomial algorithm for scheduling small-scale manufacturing cells served by multiple robots
    • Kogan K., and Levner E. A polynomial algorithm for scheduling small-scale manufacturing cells served by multiple robots. Computers and Operations Research 25 1 (1998) 53-62
    • (1998) Computers and Operations Research , vol.25 , Issue.1 , pp. 53-62
    • Kogan, K.1    Levner, E.2
  • 11
    • 0027684058 scopus 로고
    • Determining the optimal starting times in a cyclic schedule with a given route
    • Lei L. Determining the optimal starting times in a cyclic schedule with a given route. Computers and Operations Research 20 8 (1993) 807-816
    • (1993) Computers and Operations Research , vol.20 , Issue.8 , pp. 807-816
    • Lei, L.1
  • 12
    • 33751036266 scopus 로고    scopus 로고
    • L. Lei, T.J. Wang, A proof: The cyclic hoist scheduling problem is NP-complete, WP 89-0016, Rutgers University, 1989.
  • 13
    • 0000136120 scopus 로고    scopus 로고
    • A parametric critical path problem and an application for cyclic scheduling
    • Levner E., and Kats V. A parametric critical path problem and an application for cyclic scheduling. Discrete Applied Mathematics 87 (1998) 149-158
    • (1998) Discrete Applied Mathematics , vol.87 , pp. 149-158
    • Levner, E.1    Kats, V.2
  • 14
    • 0029491089 scopus 로고
    • Flowshop scheduling of robotic cells with job-dependent transportation and setup effects
    • Levner E., Kogan K., and Maimon O. Flowshop scheduling of robotic cells with job-dependent transportation and setup effects. Journal of the Operational Research Society 45 (1995) 1447-1455
    • (1995) Journal of the Operational Research Society , vol.45 , pp. 1447-1455
    • Levner, E.1    Kogan, K.2    Maimon, O.3
  • 16
    • 0031186888 scopus 로고    scopus 로고
    • Determining the optimal move times for a given cyclic schedule of a material handling hoist
    • Ng W.C., and Leung J. Determining the optimal move times for a given cyclic schedule of a material handling hoist. Computers and Industrial Engineering 32 3 (1997) 595-606
    • (1997) Computers and Industrial Engineering , vol.32 , Issue.3 , pp. 595-606
    • Ng, W.C.1    Leung, J.2
  • 18
    • 0000885127 scopus 로고
    • Cyclic schedules for job shops with identical jobs
    • Roundy R.O. Cyclic schedules for job shops with identical jobs. Mathematics of Operations Research 17 (1992) 842-865
    • (1992) Mathematics of Operations Research , vol.17 , pp. 842-865
    • Roundy, R.O.1
  • 21
    • 33751066992 scopus 로고    scopus 로고
    • J. Van de Klundert, Scheduling Problems in Automated Manufacturing, Dissertation 96-35, Faculty of Economics and Business Administration, University of Limburg, Maastricht, Netherlands, 1996.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.