-
1
-
-
0004916276
-
"Job Scheduling in Multiprogrammed Parallel Systems, Extended Version"
-
IBM, technical report, RC 19790 (87657), Aug
-
D. Feitelson, "Job Scheduling in Multiprogrammed Parallel Systems, Extended Version," IBM, technical report, RC 19790 (87657), Aug. 1997.
-
(1997)
-
-
Feitelson, D.1
-
2
-
-
84963790148
-
"An Infrastructure for Efficient Parallel job Execution in Terascale Computing Environments"
-
Nov
-
J. Moreira, W. Chan, L. Fong, H. Franke, and M. Jette, "An Infrastructure for Efficient Parallel job Execution in Terascale Computing Environments," Proc. ACM/IEEE Supercomputing Conf. (SC), Nov. 1998.
-
(1998)
Proc. ACM/IEEE Supercomputing Conf. (SC)
-
-
Moreira, J.1
Chan, W.2
Fong, L.3
Franke, H.4
Jette, M.5
-
4
-
-
0042293296
-
"Dynamic Coscheduling on Workstation Clusters"
-
P. Sobalvarro, S. Pakin, W. Weihl, and A. Chien, "Dynamic Coscheduling on Workstation Clusters," Proc. Workshop Job Scheduling Strategies for Parallel Processing (JSSPP), 1998.
-
(1998)
Proc. Workshop Job Scheduling Strategies for Parallel Processing (JSSPP)
-
-
Sobalvarro, P.1
Pakin, S.2
Weihl, W.3
Chien, A.4
-
5
-
-
0032690328
-
"A Closer Look at Coscheduling Approaches for a Network of Work-stations"
-
S. Nagar, A. Banerjee, A. Sivasubramaniam, and C. Das, "A Closer Look at Coscheduling Approaches for a Network of Work-stations," Proc. ACM Symp. Parallel Algorithms and Architectures (SPAA), 1999.
-
(1999)
Proc. ACM Symp. Parallel Algorithms and Architectures (SPAA)
-
-
Nagar, S.1
Banerjee, A.2
Sivasubramaniam, A.3
Das, C.4
-
6
-
-
0033719985
-
"A Simulation-Based Study of Scheduling Mechanisms for a Dynamic Cluster Environment"
-
Y. Zhang, A. Sivasubramaniam, J. Moreira, and H. Franke, "A Simulation-Based Study of Scheduling Mechanisms for a Dynamic Cluster Environment," Proc. Int'l Conf. Supercomputing (ICS), 2000.
-
(2000)
Proc. Int'l Conf. Supercomputing (ICS)
-
-
Zhang, Y.1
Sivasubramaniam, A.2
Moreira, J.3
Franke, H.4
-
7
-
-
28744442698
-
"Loosely Coordinated Coscheduling in the Context of Other Dynamic Job Scheduling Approaches-A Survey"
-
Dec
-
A. Sodan, "Loosely Coordinated Coscheduling in the Context of Other Dynamic Job Scheduling Approaches-A Survey," Concurrency & Computation: Practice & Experience, vol. 17, no. 15, pp. 1725-1781, Dec. 2005.
-
(2005)
Concurrency & Computation: Practice & Experience
, vol.17
, Issue.15
, pp. 1725-1781
-
-
Sodan, A.1
-
9
-
-
33750114216
-
"Survey of Zero-Copy Optimization in User-Level Communication and Adaptive Knowledge-Based Solution"
-
Y. Zhou and A. Sodan, "Survey of Zero-Copy Optimization in User-Level Communication and Adaptive Knowledge-Based Solution," Proc. Conf. High Performance Computing Systems (HPCS), 2004.
-
(2004)
Proc. Conf. High Performance Computing Systems (HPCS)
-
-
Zhou, Y.1
Sodan, A.2
-
10
-
-
0345446547
-
"The Workload on Parallel Super-computers-Modelling the Characteristics of Rigid Jobs"
-
Nov
-
U. Lublin and D. Feitelson, "The Workload on Parallel Super-computers-Modelling the Characteristics of Rigid Jobs," J. Parallel and Distributed Computing, vol. 63, no. 11, pp. 1105-1122, Nov. 2003.
-
(2003)
J. Parallel and Distributed Computing
, vol.63
, Issue.11
, pp. 1105-1122
-
-
Lublin, U.1
Feitelson, D.2
-
15
-
-
84947237576
-
"Flexible Coscheduling - Mitigating Load Imbalance and Improving Utilization of Heterogeneous Resources"
-
E. Frachtenberg, D. Feitelson, F. Petrini, and J. Fernandez, "Flexible Coscheduling - Mitigating Load Imbalance and Improving Utilization of Heterogeneous Resources," Proc. Int'l Parallel and Distributed Processing Symp. (IPDPS), 2003.
-
(2003)
Proc. Int'l Parallel and Distributed Processing Symp. (IPDPS)
-
-
Frachtenberg, E.1
Feitelson, D.2
Petrini, F.3
Fernandez, J.4
-
16
-
-
0042850376
-
"Paired Gang Scheduling"
-
June
-
Y. Wiseman and D. Feitelson, "Paired Gang Scheduling," IEEE Trans. Parallel and Distributed Systems, vol. 14, no. 6, pp. 581-592, June 2003.
-
(2003)
IEEE Trans. Parallel and Distributed Systems
, vol.14
, Issue.6
, pp. 581-592
-
-
Wiseman, Y.1
Feitelson, D.2
-
18
-
-
0032630744
-
"Supporting Priorities and Improving Utilization of the IBM SP2 Scheduler Using Slack-Based Back-filling"
-
D. Talby and D. Feitelson, "Supporting Priorities and Improving Utilization of the IBM SP2 Scheduler Using Slack-Based Back-filling," Proc. Int'l Symp. Parallel Processing (IPPS), 1999.
-
(1999)
Proc. Int'l Symp. Parallel Processing (IPPS)
-
-
Talby, D.1
Feitelson, D.2
-
23
-
-
0001087280
-
"Hyper-Threading Technology Architecture and Micro-architecture"
-
D. Marr, F. Binns, D. Hill, G. Hinton, D. Koufaty, J. Miller, and M. Upton, "Hyper-Threading Technology Architecture and Micro-architecture," Intel Technology J. Q1, vol. 6, no. 1, 2002.
-
(2002)
Intel Technology J. Q1
, vol.6
, Issue.1
-
-
Marr, D.1
Binns, F.2
Hill, D.3
Hinton, G.4
Koufaty, D.5
Miller, J.6
Upton, M.7
-
24
-
-
33748949605
-
"An Empirical Study of Hyper-Threading in High Performance Computing Clusters"
-
T. Leng, R. Ali, J. Hsieh, V. Mashayekhi, and R. Rooholamini, "An Empirical Study of Hyper-Threading in High Performance Computing Clusters," Linux HPC Revolution, 2002.
-
(2002)
Linux HPC Revolution
-
-
Leng, T.1
Ali, R.2
Hsieh, J.3
Mashayekhi, V.4
Rooholamini, R.5
-
25
-
-
1842598425
-
"Hyper-Threading Technology: Impact on Compute-Intensive Workloads"
-
W. Magro, P. Peterson, and S. Shah, "Hyper-Threading Technology: Impact on Compute-Intensive Workloads," Intel Technology J. Q1, vol. 6, no. 1, 2002.
-
(2002)
Intel Technology J. Q1
, vol.6
, Issue.1
-
-
Magro, W.1
Peterson, P.2
Shah, S.3
-
26
-
-
19944383654
-
"Implications of I/O for Gang Scheduled Workloads"
-
W. Lee, M. Frank, V. Lee, K. Mackenzie, and L. Rudolph, "Implications of I/O for Gang Scheduled Workloads," Proc. Conf. Job Scheduling Strategies for Parallel Processing, 1997.
-
(1997)
Proc. Conf. Job Scheduling Strategies for Parallel Processing
-
-
Lee, W.1
Frank, M.2
Lee, V.3
Mackenzie, K.4
Rudolph, L.5
-
27
-
-
0035365573
-
"A Slowdown Model for Applications Executing on Time-Shared Clusters of Workstations"
-
June
-
S. Figueira and F. Berman, "A Slowdown Model for Applications Executing on Time-Shared Clusters of Workstations," IEEE Trans. Parallel and Distributed Systems, vol. 12, no. 6, June 2001.
-
(2001)
IEEE Trans. Parallel and Distributed Systems
, vol.12
, Issue.6
-
-
Figueira, S.1
Berman, F.2
-
29
-
-
0035439330
-
"Impact of Workload and System Parameters on Next Generation Cluster Scheduling Mechanism"
-
Sept
-
Y. Zhang, A. Sivasubramaniam, J. Moreira, and H. Franke, "Impact of Workload and System Parameters on Next Generation Cluster Scheduling Mechanism," IEEE Trans. Parallel and Distributed Systems, vol. 12, no. 9, Sept. 2001.
-
(2001)
IEEE Trans. Parallel and Distributed Systems
, vol.12
, Issue.9
-
-
Zhang, Y.1
Sivasubramaniam, A.2
Moreira, J.3
Franke, H.4
-
30
-
-
0003605996
-
"The NAS Parallel Benchmarks 2.0"
-
NASA Ames Research Center, Moffett Field, Calif
-
D. Bailey, T. Harris, W. Saphir, R.V. der Wijngaart, A. Woo, and M. Yarrow, "The NAS Parallel Benchmarks 2.0," NAS Technical Report NAS-95-020, NASA Ames Research Center, Moffett Field, Calif., 1995.
-
(1995)
NAS Technical Report NAS-95-020
-
-
Bailey, D.1
Harris, T.2
Saphir, W.3
der Wijngaart, R.V.4
Woo, A.5
Yarrow, M.6
-
32
-
-
0035363047
-
"Utilization, Predictability, Workloads and User Runtime Estimates in Scheduling the IBM SP2 with Backfilling"
-
June
-
A. Mu'alem and D. Feitelson, "Utilization, Predictability, Workloads and User Runtime Estimates in Scheduling the IBM SP2 with Backfilling," IEEE Trans. Parallel and Distributed Systems, vol. 12, no. 6, June 2001.
-
(2001)
IEEE Trans. Parallel and Distributed Systems
, vol.12
, Issue.6
-
-
Mu'alem, A.1
Feitelson, D.2
-
33
-
-
33750142353
-
"Lublin/Teitelson Workload Model, C Code"
-
Dec
-
"Lublin/Teitelson Workload Model, C Code," http://www.cs.huji.ac.il/labs/parallel/workload/models.html, Dec. 2005.
-
(2005)
-
-
|