-
1
-
-
0042559017
-
On the conjecture in robotic cells: New simplified proof for the three-machine case
-
Granoble
-
Brauner, N.; Finke, G. (1997). On the Conjecture in Robotic Cells: New Simplified Proof for the Three-Machine Case, Technical report RR 971-PR 982-1, Leisniz-IMAG, Granoble
-
(1997)
Technical Report RR 971-PR 982-1, Leisniz-IMAG
-
-
Brauner, N.1
Finke, G.2
-
2
-
-
20444368343
-
On cycles and permutations in robotic cells
-
Brauner, N.; Finke, G. (1999). On cycles and permutations in robotic cells. Internal Note
-
(1999)
Internal Note
-
-
Brauner, N.1
Finke, G.2
-
3
-
-
0000222016
-
Sequencing of parts and robot moves in a robotic cell
-
Sethi, S. P.; Sriskandarajah, C.; Sorger, G.; Blazewicz, J.; Kubiak, W. (1992). Sequencing of parts and robot moves in a robotic cell, International Journal of Flexible Manufacturing Systems, Vol. 4, 331-358
-
(1992)
International Journal of Flexible Manufacturing Systems
, vol.4
, pp. 331-358
-
-
Sethi, S.P.1
Sriskandarajah, C.2
Sorger, G.3
Blazewicz, J.4
Kubiak, W.5
-
4
-
-
0031142587
-
Scheduling in robotic cells: Classification, two and three machine cell
-
Hall, N. G.; Kammoun, H.; Sriskandarajah, C. (1997). Scheduling in robotic cells: Classification, two and three machine cell, Operations Research, Vol. 45, No. 3, 421-439
-
(1997)
Operations Research
, vol.45
, Issue.3
, pp. 421-439
-
-
Hall, N.G.1
Kammoun, H.2
Sriskandarajah, C.3
-
5
-
-
0033312656
-
Scheduling in robotic cells: Heuristics and cell design
-
Kammoun, H.; Hall, N. G.; Sriskandarajah, C. (1999). Scheduling in robotic cells: Heuristics and cell design, Operations Research, Vol. 47, No. 6, 821-835
-
(1999)
Operations Research
, vol.47
, Issue.6
, pp. 821-835
-
-
Kammoun, H.1
Hall, N.G.2
Sriskandarajah, C.3
-
6
-
-
0002868454
-
Scheduling in robotic cells: Complexity and steady state analysis
-
Hall, N. G.; Kammoun, H.; Sriskandarajah, C. (1998). Scheduling in robotic cells: Complexity and steady state analysis, European Journal of Operational Research, Vol. 109, Issue 1, 43-65
-
(1998)
European Journal of Operational Research
, vol.109
, Issue.1
, pp. 43-65
-
-
Hall, N.G.1
Kammoun, H.2
Sriskandarajah, C.3
-
8
-
-
5144232236
-
Resolution of a scheduling problem in a flow shop robotic cell
-
Soukhal, A.; Martineau, P. (2005). Resolution of a scheduling problem in a flow shop robotic cell, European Journal of Operational Research, Vol. 161, Issue 1, 62-72
-
(2005)
European Journal of Operational Research
, vol.161
, Issue.1
, pp. 62-72
-
-
Soukhal, A.1
Martineau, P.2
|