메뉴 건너뛰기




Volumn II, Issue , 2005, Pages 466-470

Economic order quantity model with backorder for imperfect quality items

Author keywords

Backorder; EOQ; Imperfect quality

Indexed keywords

EOQ MODEL; IMPERFECT QUALITY;

EID: 33749677218     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/IEMC.2005.1559191     Document Type: Conference Paper
Times cited : (44)

References (14)
  • 1
    • 0022613610 scopus 로고
    • Optimal lot sizing, process quality improvement and setup cost reduction
    • E.L. Porteus, "Optimal lot sizing, process quality improvement and setup cost reduction," Operations Research, vol. 34, pp. 137-144, 1986.
    • (1986) Operations Research , vol.34 , pp. 137-144
    • Porteus, E.L.1
  • 2
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production processes
    • M.J. Rosenblat, and H.L. Lee, "Economic production cycles with imperfect production processes," HE Transactions, vol. 18, pp. 4855, 1986.
    • (1986) HE Transactions , vol.18 , pp. 4855
    • Rosenblat, M.J.1    Lee, H.L.2
  • 3
    • 0023412314 scopus 로고
    • Simultaneous determination of production cycles and inspection schedules in a production system
    • H.L. Lee, and M.J. Rosenblatt, "Simultaneous determination of production cycles and inspection schedules in a production system," Management Science, vol. 33, pp1125-1137, 1987.
    • (1987) Management Science , vol.33 , pp. 1125-1137
    • Lee, H.L.1    Rosenblatt, M.J.2
  • 4
    • 0025399639 scopus 로고
    • Joint lot sizing and inspection policy in an EOQ model with random yield
    • X. Zhang and Y. Gerchak, "Joint lot sizing and inspection policy in an EOQ model with random yield," HE Transactions, vol. 22, no. 1, pp. 41-47, 1990.
    • (1990) HE Transactions , vol.22 , Issue.1 , pp. 41-47
    • Zhang, X.1    Gerchak, Y.2
  • 5
    • 0026634464 scopus 로고
    • Deterministic inventory models incorporating marketing decisions
    • T.L. Urban, "Deterministic inventory models incorporating marketing decisions," Computers and Industrial Engineering, vol. 22, no. 1, pp. 85-93, 1992.
    • (1992) Computers and Industrial Engineering , vol.22 , Issue.1 , pp. 85-93
    • Urban, T.L.1
  • 6
    • 0345872325 scopus 로고    scopus 로고
    • A new EPQ model: Integrating lower pricing, rework and reject situations
    • W. M. Chan, R. N. Ibrahim., and P. B. Lochert, "A new EPQ model: integrating lower pricing, rework and reject situations," Production Planning & Control, vol.14, no.7, pp. 588-595, 2003.
    • (2003) Production Planning & Control , vol.14 , Issue.7 , pp. 588-595
    • Chan, W.M.1    Ibrahim, R.N.2    Lochert, P.B.3
  • 7
    • 0034286621 scopus 로고    scopus 로고
    • Impact of investing in quality improvement on (Q, r, L) model involving the imperfect production process
    • L.Y. Ouyang and H-C. Chang, "Impact of investing in quality improvement on (Q, r, L) model involving the imperfect production process," Production Planning & Control, vol. 11, no. 6, pp 598-607, 2000.
    • (2000) Production Planning & Control , vol.11 , Issue.6 , pp. 598-607
    • Ouyang, L.Y.1    Chang, H.-C.2
  • 8
    • 0031699435 scopus 로고    scopus 로고
    • An EMQ model with inspections and random machine failures
    • V. Makis and J. Fung," An EMQ model with inspections and random machine failures," Journal of the Operational Research Society, vol. 49, no. 1, pp. 66-76, 1998.
    • (1998) Journal of the Operational Research Society , vol.49 , Issue.1 , pp. 66-76
    • Makis, V.1    Fung, J.2
  • 9
    • 0033099395 scopus 로고    scopus 로고
    • Multi-stage lot sizing models with imperfect processes and inspection errors
    • M. Ben-Daya, "Multi-stage lot sizing models with imperfect processes and inspection errors," Production Planning & Control, vol. 10, no.2, pp. 118-126, 1999.
    • (1999) Production Planning & Control , vol.10 , Issue.2 , pp. 118-126
    • Ben-Daya, M.1
  • 10
    • 0036778937 scopus 로고    scopus 로고
    • Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process
    • L-Y. Ouyang, C-K. Chen and H-C. Chang, "Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process," Computers & Operations Research, vol. 29, pp 1701-1717, 2002.
    • (2002) Computers & Operations Research , vol.29 , pp. 1701-1717
    • Ouyang, L.-Y.1    Chen, C.-K.2    Chang, H.-C.3
  • 11
    • 0142090745 scopus 로고    scopus 로고
    • Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging
    • Y.P. Chiu, "Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging," Engineering Optimization, vol. 35, no. 4, pp 427 -437, 2003.
    • (2003) Engineering Optimization , vol.35 , Issue.4 , pp. 427-437
    • Chiu, Y.P.1
  • 12
    • 0347763702 scopus 로고    scopus 로고
    • A simple integrated production policy of an imperfect item for vendor and buyer
    • S.K Goyal, C.K. Huang, and K.C. Chen, "A simple integrated production policy of an imperfect item for vendor and buyer," Production Planning & Control, vol. 14, no. 7, pp 596-602, 2003.
    • (2003) Production Planning & Control , vol.14 , Issue.7 , pp. 596-602
    • Goyal, S.K.1    Huang, C.K.2    Chen, K.C.3
  • 13
    • 33749662083 scopus 로고    scopus 로고
    • The integrated inventory models with defective items and controllable lead time
    • L.Y. Ouyang, K.S. Wu, and C.H. Ho, "The integrated inventory models with defective items and controllable lead time." Production Planning & Control, vol. 14, no. 7, pp 562-578, 2003.
    • (2003) Production Planning & Control , vol.14 , Issue.7 , pp. 562-578
    • Ouyang, L.Y.1    Wu, K.S.2    Ho, C.H.3
  • 14
    • 0033874992 scopus 로고    scopus 로고
    • Economic production quantity model for items with imperfect quality
    • M.K. Salameh, and M.Y Jaber, "Economic production quantity model for items with imperfect quality," International Journal of Production Economics, vol. 64, pp. 59-64, 2000.
    • (2000) International Journal of Production Economics , vol.64 , pp. 59-64
    • Salameh, M.K.1    Jaber, M.Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.