메뉴 건너뛰기




Volumn 176, Issue 1, 2007, Pages 405-413

Joint optimisation of maintenance and buffer size in a manufacturing system

Author keywords

Buffer size; Maintenance; Theory of constraints

Indexed keywords

INTEGER PROGRAMMING; LINEAR PROGRAMMING; MATHEMATICAL MODELS; OPTIMIZATION;

EID: 33749165905     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2005.08.007     Document Type: Article
Times cited : (42)

References (15)
  • 1
    • 0028546903 scopus 로고
    • How theory of constraints can be used to direct preventive maintenance?
    • Chakravorty S.S., and Atwater J.B. How theory of constraints can be used to direct preventive maintenance?. Industrial Management November/December (1994) 10-13
    • (1994) Industrial Management , Issue.November-December , pp. 10-13
    • Chakravorty, S.S.1    Atwater, J.B.2
  • 2
    • 0029524691 scopus 로고
    • Developing effective strategies to prioritize set-up reduction in a multi-machine production system: A throughput approach
    • Chakravorty S.S., and Sessun J.L. Developing effective strategies to prioritize set-up reduction in a multi-machine production system: A throughput approach. International Journal of Operations and Production Management 15 (1995) 103-111
    • (1995) International Journal of Operations and Production Management , vol.15 , pp. 103-111
    • Chakravorty, S.S.1    Sessun, J.L.2
  • 3
    • 16244374307 scopus 로고    scopus 로고
    • Optimal preventive maintenance of a production system with an intermediate buffer
    • Kyriakidis E.G., and Dimitrakos T.D. Optimal preventive maintenance of a production system with an intermediate buffer. European Journal of Operational Research 168 (2006) 86-99
    • (2006) European Journal of Operational Research , vol.168 , pp. 86-99
    • Kyriakidis, E.G.1    Dimitrakos, T.D.2
  • 4
    • 33749188299 scopus 로고    scopus 로고
    • LINDO User's Manual. Lindo Systems Inc., Chicago, IL, 2003.
  • 7
    • 0012598250 scopus 로고    scopus 로고
    • The impact of preventive maintenance on system cost and buffer size
    • Meller R.D., and Kim D.S. The impact of preventive maintenance on system cost and buffer size. European Journal of Operational Research 95 (1996) 577-591
    • (1996) European Journal of Operational Research , vol.95 , pp. 577-591
    • Meller, R.D.1    Kim, D.S.2
  • 8
    • 0028433815 scopus 로고
    • Maintenance decision support: Analyzing crankcase lubricant condition by Markov process modeling
    • Monplaisir M.H., and Armugadasan N. Maintenance decision support: Analyzing crankcase lubricant condition by Markov process modeling. Journal of the Operational Research Society 45 (1994) 509-518
    • (1994) Journal of the Operational Research Society , vol.45 , pp. 509-518
    • Monplaisir, M.H.1    Armugadasan, N.2
  • 9
    • 0346338151 scopus 로고    scopus 로고
    • The control of the setting up of a predictive maintenance programme using a system of indicators
    • Moya M.C.C. The control of the setting up of a predictive maintenance programme using a system of indicators. International Journal of Management Science-Omega 32 (2004) 57-75
    • (2004) International Journal of Management Science-Omega , vol.32 , pp. 57-75
    • Moya, M.C.C.1
  • 12
    • 0035393584 scopus 로고    scopus 로고
    • Targeting quality improvement efforts through knowledge of capacity constraints: The case of a low technology ceramics manufacturer
    • Shaw N.E., and Burgess T.F. Targeting quality improvement efforts through knowledge of capacity constraints: The case of a low technology ceramics manufacturer. Journal of Operational Research 52 (2001) 739-749
    • (2001) Journal of Operational Research , vol.52 , pp. 739-749
    • Shaw, N.E.1    Burgess, T.F.2
  • 15
    • 0018444869 scopus 로고
    • The effect of interstage buffer storage on the output of two unreliable production units in series, with different production rates
    • Wijngaard J. The effect of interstage buffer storage on the output of two unreliable production units in series, with different production rates. American Institute of Industrial Engineers Transactions 11 (1979) 42-47
    • (1979) American Institute of Industrial Engineers Transactions , vol.11 , pp. 42-47
    • Wijngaard, J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.