-
1
-
-
0033340198
-
Reconfigurable manufacturing systems
-
Koren, Y., Heisel, U., Jovane, F., Moriwaki, T., Pritchow, G., Van Brussel, H., and Ulsoy, A. G., 1999, "Reconfigurable Manufacturing Systems," CIRP Ann., 48(2), pp. 527-540.
-
(1999)
CIRP Ann.
, vol.48
, Issue.2
, pp. 527-540
-
-
Koren, Y.1
Heisel, U.2
Jovane, F.3
Moriwaki, T.4
Pritchow, G.5
Van Brussel, H.6
Ulsoy, A.G.7
-
2
-
-
0032046605
-
Formation of independent flow-line cells based on operation requirements and machine capabilities
-
Askin, G. R., and Zhou, M., 1998, "Formation of Independent Flow-Line Cells Based on Operation Requirements and Machine Capabilities," IIE Trans., 30, pp. 319-329.
-
(1998)
IIE Trans.
, vol.30
, pp. 319-329
-
-
Askin, G.R.1
Zhou, M.2
-
3
-
-
0034466407
-
Minimal investment budgets for flow line configuration
-
Kimms, A., 2000, "Minimal Investment Budgets for Flow Line Configuration," IIE Trans., 32, pp. 287-298.
-
(2000)
IIE Trans.
, vol.32
, pp. 287-298
-
-
Kimms, A.1
-
4
-
-
0036778710
-
Optimal design of stochastic production lines: A dynamic programming approach
-
Donohue, K. L., Hopp, Wallace J., and Spearman, M. L., 2002, "Optimal Design of Stochastic Production Lines: A Dynamic Programming Approach," IIE Trans., 34, pp. 891-903.
-
(2002)
IIE Trans.
, vol.34
, pp. 891-903
-
-
Donohue, K.L.1
Hopp, W.J.2
Spearman, M.L.3
-
5
-
-
23244465483
-
Concurrent line-balancing, equipment selection and throughput analysis for multi-part optimal line design
-
Ann Arbor, MI
-
Tang, L., Yip-Hoi, D. M., Wang, W., and Koren, Y., 2003, "Concurrent Line-Balancing, Equipment Selection and Throughput Analysis for Multi-Part Optimal Line Design," CIRP 2nd International Conference on Reconfigurable Manufacturing, Ann Arbor, MI.
-
(2003)
CIRP 2nd International Conference on Reconfigurable Manufacturing
-
-
Tang, L.1
Yip-Hoi, D.M.2
Wang, W.3
Koren, Y.4
-
6
-
-
0036726123
-
A non-linear redesign methodology for manufacturing systems in SMEs
-
Bradford, J., and Childe, S. I., 2002, "A Non-Linear Redesign Methodology for Manufacturing Systems in SMEs," Comput Ind., 49(1), pp. 9-23.
-
(2002)
Comput Ind.
, vol.49
, Issue.1
, pp. 9-23
-
-
Bradford, J.1
Childe, S.I.2
-
7
-
-
22044457811
-
Synergy between business process and systems reengineering
-
Aiken, P., and Hodgson, L., 1998, "Synergy Between Business Process and Systems Reengineering," Information Systems Management, 15(4), pp. 55-67.
-
(1998)
Information Systems Management
, vol.15
, Issue.4
, pp. 55-67
-
-
Aiken, P.1
Hodgson, L.2
-
8
-
-
0035300673
-
The applications of flexible manufacturing technologies in business process reengineering
-
Chan, F. T. S., and Jiang, B., 2001, "The Applications of Flexible Manufac turing Technologies in Business Process Reengineering," Int. J. Flexible Manuf. Syst., 13, pp. 131-144.
-
(2001)
Int. J. Flexible Manuf. Syst.
, vol.13
, pp. 131-144
-
-
Chan, F.T.S.1
Jiang, B.2
-
9
-
-
77953153609
-
Generalized kinematic modeling method for reconfigurable machine tools
-
Atlanta, GA
-
Moon, Y.-M., and Kota, S., 1998, "Generalized Kinematic Modeling Method for Reconfigurable Machine Tools," Proceedings of ASME Design Engineering Technical Conference, Atlanta, GA.
-
(1998)
Proceedings of ASME Design Engineering Technical Conference
-
-
Moon, Y.-M.1
Kota, S.2
-
10
-
-
23244434258
-
A genetic algorithm approach for the design of machining system families
-
Haifa, Israel
-
Son, S.-Y., Olsen, T. L., and Yip-Hoi, D., 2000, "A Genetic Algorithm Approach for the Design of Machining System Families," Proceedings of the 2000 International CIRP Design Seminar, Design With Manufacturing: Intelligent Design Concepts, Methods and Algorithms, Haifa, Israel.
-
(2000)
Proceedings of the 2000 International CIRP Design Seminar, Design with Manufacturing: Intelligent Design Concepts, Methods and Algorithms
-
-
Son, S.-Y.1
Olsen, T.L.2
Yip-Hoi, D.3
-
11
-
-
0004116989
-
-
MIT Press, Cambridge, MA
-
Cormen, T. H., Leiserson, C. E., Rivest, R. L., and Stein, C., 2001, Introduction to Algorithms, 2nd ed., MIT Press, Cambridge, MA.
-
(2001)
Introduction to Algorithms, 2nd Ed.
-
-
Cormen, T.H.1
Leiserson, C.E.2
Rivest, R.L.3
Stein, C.4
-
12
-
-
0022094206
-
Generalized best-first search strategies and the optimality of A*
-
Dechter, R., and Pearl, J., 1985, "Generalized Best-First Search Strategies and the Optimality of A*," J. Assoc. Comput. Mach., 32(3), pp. 505-536.
-
(1985)
J. Assoc. Comput. Mach.
, vol.32
, Issue.3
, pp. 505-536
-
-
Dechter, R.1
Pearl, J.2
-
13
-
-
0033311731
-
Planning quasi-static fingertip manipulations for reconfiguring objects
-
Cherif, M. a. G. K. K., 1999, "Planning Quasi-Static Fingertip Manipulations for Reconfiguring Objects," IEEE Trans. Rob. Autom., 15(5), pp. 837-848.
-
(1999)
IEEE Trans. Rob. Autom.
, vol.15
, Issue.5
, pp. 837-848
-
-
Cherif, M.A.G.K.K.1
-
15
-
-
0032094502
-
Development of an automated flexible fixture for planar objects
-
Du, H., and Lin, G. C, I., 1998, "Development of an Automated Flexible Fixture for Planar Objects," Rob. Comput.-Integr. Manufact., 14(3), pp. 173-183.
-
(1998)
Rob. Comput.-integr. Manufact.
, vol.14
, Issue.3
, pp. 173-183
-
-
Du, H.1
Lin, G.C.I.2
-
17
-
-
0038176421
-
Design principles for machining system configuration
-
Spicer, P., Koren, Y., Shpitalni, M., and Yip-Hoi, D., 2002, "Design Principles for Machining System Configuration," CIRP Ann., 51(1), pp. 275-278.
-
(2002)
CIRP Ann.
, vol.51
, Issue.1
, pp. 275-278
-
-
Spicer, P.1
Koren, Y.2
Shpitalni, M.3
Yip-Hoi, D.4
-
18
-
-
0034418978
-
Modeling and analysis of multi-stage transfer lines with unreliable machines and finite buffers
-
Yang, S., Wu, C., and Hu, S. J., 2000, "Modeling and Analysis of Multi-Stage Transfer Lines With Unreliable Machines and Finite Buffers," Ann. Operat. Res., 93, pp. 405-421.
-
(2000)
Ann. Operat. Res.
, vol.93
, pp. 405-421
-
-
Yang, S.1
Wu, C.2
Hu, S.J.3
-
19
-
-
0003584577
-
-
Prentice-Hall, Inc., Englewood Cliffs, NJ
-
Russell, S. J., and Norvig, P., 1995, Artificial Intelligence: A Modern Approach, Prentice-Hall, Inc., Englewood Cliffs, NJ.
-
(1995)
Artificial Intelligence: A Modern Approach
-
-
Russell, S.J.1
Norvig, P.2
|