메뉴 건너뛰기




Volumn 41, Issue 2, 2007, Pages 148-158

The scheduled waiting time on railway lines

Author keywords

Queueing; Railway capacity; Railway scheduling

Indexed keywords

MARKOV PROCESSES; MATHEMATICAL MODELS; QUEUEING THEORY; SCHEDULING;

EID: 33748859651     PISSN: 01912615     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.trb.2006.02.009     Document Type: Article
Times cited : (58)

References (14)
  • 1
    • 33750431690 scopus 로고    scopus 로고
    • Bäuerle, N., Engelhardt-Funke, O., Kolonko, M., 2006. On the waiting time of arriving aircrafts and the capacity of airports with one or two runways. European Journal of Operational Research, in press, doi:10.1016/j.ejor.2006.01.002.
  • 2
    • 4244179714 scopus 로고
    • Directive 95/19/EC on the allocation of railway infrastructure capacity and the charging of infrastructure fees
    • European Community. Directive 95/19/EC on the allocation of railway infrastructure capacity and the charging of infrastructure fees. Official Journal of the European Communities L143 (1995) 75-78
    • (1995) Official Journal of the European Communities , vol.L143 , pp. 75-78
    • European Community1
  • 3
    • 59749090475 scopus 로고    scopus 로고
    • Directive 2001/14/EC on the allocation of railway infrastructure capacity and the levying of charges for the use of railway infrastructure and safety certification
    • European Community. Directive 2001/14/EC on the allocation of railway infrastructure capacity and the levying of charges for the use of railway infrastructure and safety certification. Official Journal of the European Communities L75 (2001) 29-46
    • (2001) Official Journal of the European Communities , vol.L75 , pp. 29-46
    • European Community1
  • 4
    • 85029848726 scopus 로고    scopus 로고
    • WIT Press, Southampton pp. 537-582
    • Gröger Th. Timetable simulation by sophisticated conflict resolution between train paths. Computers in Railways IX (2004), WIT Press, Southampton pp. 537-582
    • (2004) Computers in Railways , vol.IX
    • Gröger, Th.1
  • 5
    • 4644349692 scopus 로고
    • Sperrzeiten als Grundlage für die Fahrplankonstruktion
    • Happel O. Sperrzeiten als Grundlage für die Fahrplankonstruktion. Eisenbahntechnische Rundschau (ETR) 8 (1959) 79-90
    • (1959) Eisenbahntechnische Rundschau (ETR) , vol.8 , pp. 79-90
    • Happel, O.1
  • 6
    • 0009432950 scopus 로고
    • Some explicite formulas for the steady-state behavior of the queue with semi-Markovian service times
    • Neuts M.F. Some explicite formulas for the steady-state behavior of the queue with semi-Markovian service times. Advances in Applied Probability 9 (1977) 141-157
    • (1977) Advances in Applied Probability , vol.9 , pp. 141-157
    • Neuts, M.F.1
  • 7
    • 85029880578 scopus 로고    scopus 로고
    • Schwanhäußer, W., 1974. Die Bemessung der Pufferzeiten im Fahrplangefüge der Eisenbahn. Veröffentlichungen des Verkehrswissenschaftliches Instituts der RWTH Aachen, vol. 20.
  • 8
    • 33748856349 scopus 로고
    • Die Ermittlung der Leistungsfähigkeit von großen Fahrstraßenknoten und von Teilen des Eisenbahnnetzes
    • Schwanhäußer W. Die Ermittlung der Leistungsfähigkeit von großen Fahrstraßenknoten und von Teilen des Eisenbahnnetzes. AET 33 (1978) 7-18
    • (1978) AET , vol.33 , pp. 7-18
    • Schwanhäußer, W.1
  • 9
    • 85029830291 scopus 로고    scopus 로고
    • Union Internationale des Chemins de Fer, 2004. Code 406 Capacity, UIC, Paris.
  • 10
    • 85029861367 scopus 로고    scopus 로고
    • Wakob, H., 1985. Ableitung eines generellen Wartemodells zur Ermittlung der planmäßigen Wartezeiten im Eisenbahnbetrieb unter besonderer Berücksichtigung der Aspekte der Leistungsfähigkeit und der Anlagenbelastung. Veröffentlichungen des Verkehrswissenschaftliches Instituts der RWTH Aachen, vol. 36.
  • 11
    • 4644221247 scopus 로고
    • Weiterentwicklung der Sperrzeitentreppe für moderne Signalsysteme
    • Wendler E. Weiterentwicklung der Sperrzeitentreppe für moderne Signalsysteme. Signal + Draht 87 (1995) 268-273
    • (1995) Signal + Draht , vol.87 , pp. 268-273
    • Wendler, E.1
  • 12
    • 85029885571 scopus 로고    scopus 로고
    • Wendler, E. 1995b. Influences of modern signalling systems on railway capacity. Proceedings of the 2nd Erasmus-network conference on Transportation and traffic engineering, Kerkrade, pp. 50-60.
  • 13
    • 85029853921 scopus 로고    scopus 로고
    • Wendler, E., 1998. Scheduled waiting time and uncertain traffic demand. Proceedings of the Symposium 'Planning Traffic Networks for a Dynamic Transport Market-Rail Traffic Compared to Air Traffic', Utrecht, pp. 61-68.
  • 14
    • 85029883985 scopus 로고    scopus 로고
    • Wendler, E., 1999. Analytische Berechnung der planmäßigen Wartezeiten bei asynchroner Fahrplankonstruktion. Veröffentlichungen des Verkehrswissenschaftliches Instituts der RWTH Aachen, vol. 55.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.