메뉴 건너뛰기




Volumn 44, Issue 21, 2006, Pages 4607-4629

Evaluating the effects of capacity constraints and demand patterns on supply chain replenishment strategies

Author keywords

Design of experiments (DOE); Distribution requirements planning (DRP); Inventory replenishment; Kanban (KBN); Material requirements planning (MRP); Multi echelon inventory; Re order point (ROP); Simulation; Supply chain management

Indexed keywords

COMPUTER SIMULATION; CONSTRAINT THEORY; DISTRIBUTION OF GOODS; PRODUCTION ENGINEERING; STATISTICAL METHODS;

EID: 33748706339     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540500494527     Document Type: Article
Times cited : (34)

References (17)
  • 1
    • 0028769377 scopus 로고
    • Multi-level production-inventory control: Material requirements planning or reorder point policies
    • Axsäter, S. and Rosling, K., Multi-level production-inventory control: Material requirements planning or reorder point policies. Euro. J. Op. Res., 1994, 75, 405-412.
    • (1994) Euro. J. Op. Res. , vol.75 , pp. 405-412
    • Axsäter, S.1    Rosling, K.2
  • 2
    • 0028430132 scopus 로고
    • An analytical framework for comparing material requirements planning to reorder point systems
    • Bregman, R.L., An analytical framework for comparing material requirements planning to reorder point systems. Euro. J. Op. Res., 1994, 75, 74-88.
    • (1994) Euro. J. Op. Res. , vol.75 , pp. 74-88
    • Bregman, R.L.1
  • 4
    • 0036928986 scopus 로고    scopus 로고
    • Use of GI/G/1 queuing approximations to set tactical parameters for the simulation of MRP systems
    • edited by E. Yücesan, C.H. Chen, J.L. Snowdon and J.M. Charnes (IEEE: New York, NY)
    • Enns, S.T. and Choi, S., Use of GI/G/1 queuing approximations to set tactical parameters for the simulation of MRP systems. In Proceedings of the 2002 Winter Simulation Conference, edited by E. Yücesan, C.H. Chen, J.L. Snowdon and J.M. Charnes, 2002, pp. 1122-1129 (IEEE: New York, NY).
    • (2002) Proceedings of the 2002 Winter Simulation Conference , pp. 1122-1129
    • Enns, S.T.1    Choi, S.2
  • 5
    • 1642436936 scopus 로고    scopus 로고
    • A simulation test bed for production and supply chain modelling
    • edited by S. Chick, P.J. Sanchéz, S. Ferrin and D.J. Morrice (IEEE: New York, NY)
    • Enns, S.T. and Suwanruji, P., A simulation test bed for production and supply chain modelling. In Proceedings of the 2003 Winter Simulation Conference, edited by S. Chick, P.J. Sanchéz, S. Ferrin and D.J. Morrice, 2003, pp. 1174-1182 (IEEE: New York, NY).
    • (2003) Proceedings of the 2003 Winter Simulation Conference , pp. 1174-1182
    • Enns, S.T.1    Suwanruji, P.2
  • 6
    • 17744364119 scopus 로고    scopus 로고
    • Optimal lot-sizing with capacity constraints and auto-correlated interarrivai times
    • edited by R.G. Ingalls, M.D. Rossetti, J.S. Smith and B.A. Peters (IEEE: New York)
    • Enns, S.T. and Li, L., Optimal lot-sizing with capacity constraints and auto-correlated interarrivai times. In Proceedings of the 2004 Winter Simulation Conference, edited by R.G. Ingalls, M.D. Rossetti, J.S. Smith and B.A. Peters, 2004, pp. 1073-1078 (IEEE: New York).
    • (2004) Proceedings of the 2004 Winter Simulation Conference , pp. 1073-1078
    • Enns, S.T.1    Li, L.2
  • 7
    • 84985788242 scopus 로고
    • A comparison of reorder point and material requirements planning inventory control logic
    • Jacobs, F.R. and Whybark, D.C., A comparison of reorder point and material requirements planning inventory control logic. Decision Sci., 1992, 23, 332-342.
    • (1992) Decision Sci. , vol.23 , pp. 332-342
    • Jacobs, F.R.1    Whybark, D.C.2
  • 8
    • 0343704345 scopus 로고
    • Network Dynamics, Inc.: Burlington, MA
    • MPX User Manual, 1991 (Network Dynamics, Inc.: Burlington, MA).
    • (1991) MPX User Manual
  • 9
    • 0024715082 scopus 로고
    • A comparative analysis of an MRP lot-for-lot system and a Kanban system for a multistage production operation
    • Rees, L.P., Huang, P.Y. and Taylor, B.W., A comparative analysis of an MRP lot-for-lot system and a Kanban system for a multistage production operation. Int. J. Prod. Res., 1989, 27, 1427-1443.
    • (1989) Int. J. Prod. Res. , vol.27 , pp. 1427-1443
    • Rees, L.P.1    Huang, P.Y.2    Taylor, B.W.3
  • 11
    • 0021142762 scopus 로고
    • Comparisons of material requirements planning and reorder point systems
    • Ritzman, L.P. and Krajewski, L.J., Comparisons of material requirements planning and reorder point systems. Simu. Councils Proc. Series, 1983, 12, 47-54.
    • (1983) Simu. Councils Proc. Series , vol.12 , pp. 47-54
    • Ritzman, L.P.1    Krajewski, L.J.2
  • 12
    • 21844517678 scopus 로고
    • From CAN-Q to MPX: Evolution of queuing software for manufacturing
    • Suri, R., Diehl, G., de Treville, S. and Tomsicek, M., From CAN-Q to MPX: Evolution of queuing software for manufacturing. Interfaces, 1995, 25, 128-150.
    • (1995) Interfaces , vol.25 , pp. 128-150
    • Suri, R.1    Diehl, G.2    De Treville, S.3    Tomsicek, M.4
  • 13
    • 1642381428 scopus 로고    scopus 로고
    • Information and logic requirements for replenishment systems
    • Suwanruji, P. and Enns, S.T., Information and logic requirements for replenishment systems. Int. J. Op. & Quant. Manage., 2002, 8, 149-164.
    • (2002) Int. J. Op. & Quant. Manage. , vol.8 , pp. 149-164
    • Suwanruji, P.1    Enns, S.T.2
  • 14
    • 17744368528 scopus 로고    scopus 로고
    • Evaluating the performance of supply chain simulations with trade-offs between multiple objectives
    • edited by R.G. Ingalls, M.D. Rossetti, J.S. Smith and B.A. Peters (IEEE: New York, NY)
    • Suwanruji, P. and Enns, S.T., Evaluating the performance of supply chain simulations with trade-offs between multiple objectives. In Proceedings of the 2004 Winter Simulation Conference, edited by R.G. Ingalls, M.D. Rossetti, J.S. Smith and B.A. Peters, 2004, pp. 1399-1403 (IEEE: New York, NY).
    • (2004) Proceedings of the 2004 Winter Simulation Conference , pp. 1399-1403
    • Suwanruji, P.1    Enns, S.T.2
  • 15
    • 33748714349 scopus 로고    scopus 로고
    • Comparison of supply chain replenishment strategies in an uncapacitated distribution system
    • forthcoming
    • Suwanruji, P. and Enns, S.T., Comparison of supply chain replenishment strategies in an uncapacitated distribution system. Int. J. Risk Assess. & Manage., 2005, forthcoming.
    • (2005) Int. J. Risk Assess. & Manage.
    • Suwanruji, P.1    Enns, S.T.2
  • 16
    • 0020848139 scopus 로고
    • The queueing network analyzer
    • Whitt, W., The queueing network analyzer. Bell Syst. Tech. J., 1983, 62, 2779-2813.
    • (1983) Bell Syst. Tech. J. , vol.62 , pp. 2779-2813
    • Whitt, W.1
  • 17
    • 0032089976 scopus 로고    scopus 로고
    • A comparison of reorder point and kanban policies for a single machine production system
    • Yang, K.K., A comparison of reorder point and kanban policies for a single machine production system. Prod. Plan. & Cont., 1998, 9, 385-390.
    • (1998) Prod. Plan. & Cont. , vol.9 , pp. 385-390
    • Yang, K.K.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.