-
1
-
-
0028769377
-
Multi-level production-inventory control: Material requirements planning or reorder point policies
-
Axsäter, S. and Rosling, K., Multi-level production-inventory control: Material requirements planning or reorder point policies. Euro. J. Op. Res., 1994, 75, 405-412.
-
(1994)
Euro. J. Op. Res.
, vol.75
, pp. 405-412
-
-
Axsäter, S.1
Rosling, K.2
-
2
-
-
0028430132
-
An analytical framework for comparing material requirements planning to reorder point systems
-
Bregman, R.L., An analytical framework for comparing material requirements planning to reorder point systems. Euro. J. Op. Res., 1994, 75, 74-88.
-
(1994)
Euro. J. Op. Res.
, vol.75
, pp. 74-88
-
-
Bregman, R.L.1
-
4
-
-
0036928986
-
Use of GI/G/1 queuing approximations to set tactical parameters for the simulation of MRP systems
-
edited by E. Yücesan, C.H. Chen, J.L. Snowdon and J.M. Charnes (IEEE: New York, NY)
-
Enns, S.T. and Choi, S., Use of GI/G/1 queuing approximations to set tactical parameters for the simulation of MRP systems. In Proceedings of the 2002 Winter Simulation Conference, edited by E. Yücesan, C.H. Chen, J.L. Snowdon and J.M. Charnes, 2002, pp. 1122-1129 (IEEE: New York, NY).
-
(2002)
Proceedings of the 2002 Winter Simulation Conference
, pp. 1122-1129
-
-
Enns, S.T.1
Choi, S.2
-
5
-
-
1642436936
-
A simulation test bed for production and supply chain modelling
-
edited by S. Chick, P.J. Sanchéz, S. Ferrin and D.J. Morrice (IEEE: New York, NY)
-
Enns, S.T. and Suwanruji, P., A simulation test bed for production and supply chain modelling. In Proceedings of the 2003 Winter Simulation Conference, edited by S. Chick, P.J. Sanchéz, S. Ferrin and D.J. Morrice, 2003, pp. 1174-1182 (IEEE: New York, NY).
-
(2003)
Proceedings of the 2003 Winter Simulation Conference
, pp. 1174-1182
-
-
Enns, S.T.1
Suwanruji, P.2
-
6
-
-
17744364119
-
Optimal lot-sizing with capacity constraints and auto-correlated interarrivai times
-
edited by R.G. Ingalls, M.D. Rossetti, J.S. Smith and B.A. Peters (IEEE: New York)
-
Enns, S.T. and Li, L., Optimal lot-sizing with capacity constraints and auto-correlated interarrivai times. In Proceedings of the 2004 Winter Simulation Conference, edited by R.G. Ingalls, M.D. Rossetti, J.S. Smith and B.A. Peters, 2004, pp. 1073-1078 (IEEE: New York).
-
(2004)
Proceedings of the 2004 Winter Simulation Conference
, pp. 1073-1078
-
-
Enns, S.T.1
Li, L.2
-
7
-
-
84985788242
-
A comparison of reorder point and material requirements planning inventory control logic
-
Jacobs, F.R. and Whybark, D.C., A comparison of reorder point and material requirements planning inventory control logic. Decision Sci., 1992, 23, 332-342.
-
(1992)
Decision Sci.
, vol.23
, pp. 332-342
-
-
Jacobs, F.R.1
Whybark, D.C.2
-
8
-
-
0343704345
-
-
Network Dynamics, Inc.: Burlington, MA
-
MPX User Manual, 1991 (Network Dynamics, Inc.: Burlington, MA).
-
(1991)
MPX User Manual
-
-
-
9
-
-
0024715082
-
A comparative analysis of an MRP lot-for-lot system and a Kanban system for a multistage production operation
-
Rees, L.P., Huang, P.Y. and Taylor, B.W., A comparative analysis of an MRP lot-for-lot system and a Kanban system for a multistage production operation. Int. J. Prod. Res., 1989, 27, 1427-1443.
-
(1989)
Int. J. Prod. Res.
, vol.27
, pp. 1427-1443
-
-
Rees, L.P.1
Huang, P.Y.2
Taylor, B.W.3
-
10
-
-
33748676671
-
-
Unpublished doctoral dissertation, Ohio State University, Ohio
-
Reid, R.D., A comparative analysis of inventory planning systems in a multiechelon, multiproduct distribution system supplied by a limited capacity manufacturer. Unpublished doctoral dissertation, Ohio State University, Ohio, 1987.
-
(1987)
A Comparative Analysis of Inventory Planning Systems in a Multiechelon, Multiproduct Distribution System Supplied by a Limited Capacity Manufacturer
-
-
Reid, R.D.1
-
11
-
-
0021142762
-
Comparisons of material requirements planning and reorder point systems
-
Ritzman, L.P. and Krajewski, L.J., Comparisons of material requirements planning and reorder point systems. Simu. Councils Proc. Series, 1983, 12, 47-54.
-
(1983)
Simu. Councils Proc. Series
, vol.12
, pp. 47-54
-
-
Ritzman, L.P.1
Krajewski, L.J.2
-
12
-
-
21844517678
-
From CAN-Q to MPX: Evolution of queuing software for manufacturing
-
Suri, R., Diehl, G., de Treville, S. and Tomsicek, M., From CAN-Q to MPX: Evolution of queuing software for manufacturing. Interfaces, 1995, 25, 128-150.
-
(1995)
Interfaces
, vol.25
, pp. 128-150
-
-
Suri, R.1
Diehl, G.2
De Treville, S.3
Tomsicek, M.4
-
13
-
-
1642381428
-
Information and logic requirements for replenishment systems
-
Suwanruji, P. and Enns, S.T., Information and logic requirements for replenishment systems. Int. J. Op. & Quant. Manage., 2002, 8, 149-164.
-
(2002)
Int. J. Op. & Quant. Manage.
, vol.8
, pp. 149-164
-
-
Suwanruji, P.1
Enns, S.T.2
-
14
-
-
17744368528
-
Evaluating the performance of supply chain simulations with trade-offs between multiple objectives
-
edited by R.G. Ingalls, M.D. Rossetti, J.S. Smith and B.A. Peters (IEEE: New York, NY)
-
Suwanruji, P. and Enns, S.T., Evaluating the performance of supply chain simulations with trade-offs between multiple objectives. In Proceedings of the 2004 Winter Simulation Conference, edited by R.G. Ingalls, M.D. Rossetti, J.S. Smith and B.A. Peters, 2004, pp. 1399-1403 (IEEE: New York, NY).
-
(2004)
Proceedings of the 2004 Winter Simulation Conference
, pp. 1399-1403
-
-
Suwanruji, P.1
Enns, S.T.2
-
15
-
-
33748714349
-
Comparison of supply chain replenishment strategies in an uncapacitated distribution system
-
forthcoming
-
Suwanruji, P. and Enns, S.T., Comparison of supply chain replenishment strategies in an uncapacitated distribution system. Int. J. Risk Assess. & Manage., 2005, forthcoming.
-
(2005)
Int. J. Risk Assess. & Manage.
-
-
Suwanruji, P.1
Enns, S.T.2
-
16
-
-
0020848139
-
The queueing network analyzer
-
Whitt, W., The queueing network analyzer. Bell Syst. Tech. J., 1983, 62, 2779-2813.
-
(1983)
Bell Syst. Tech. J.
, vol.62
, pp. 2779-2813
-
-
Whitt, W.1
-
17
-
-
0032089976
-
A comparison of reorder point and kanban policies for a single machine production system
-
Yang, K.K., A comparison of reorder point and kanban policies for a single machine production system. Prod. Plan. & Cont., 1998, 9, 385-390.
-
(1998)
Prod. Plan. & Cont.
, vol.9
, pp. 385-390
-
-
Yang, K.K.1
|