메뉴 건너뛰기




Volumn 92, Issue 1, 2007, Pages 65-73

Reliability evaluation and optimisation of imperfect inspections for a component with multi-defects

Author keywords

Defect; Failure; Imperfect inspection; Optimisation; Reliability

Indexed keywords

ALGORITHMS; DEFECTS; FAILURE (MECHANICAL); INSPECTION; MATHEMATICAL MODELS; NUMERICAL METHODS; OPTIMIZATION;

EID: 33748320818     PISSN: 09518320     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ress.2005.11.003     Document Type: Article
Times cited : (69)

References (17)
  • 2
    • 0023994581 scopus 로고
    • Optimal continuous-wear limit replacement under periodic inspections
    • Park Y.S. Optimal continuous-wear limit replacement under periodic inspections. IEEE Trans Reliab 37 1 (1988) 97-102
    • (1988) IEEE Trans Reliab , vol.37 , Issue.1 , pp. 97-102
    • Park, Y.S.1
  • 3
    • 0026171773 scopus 로고
    • Reliability assurance for fatigue crack growth by repeated in-service inspections
    • Tanaka T., and Tsurui A. Reliability assurance for fatigue crack growth by repeated in-service inspections. Struct Safety 9 4 (1991) 305-314
    • (1991) Struct Safety , vol.9 , Issue.4 , pp. 305-314
    • Tanaka, T.1    Tsurui, A.2
  • 4
    • 0141458358 scopus 로고    scopus 로고
    • A comprehensive framework for evaluation of piping reliability due to erosion-corrosion for risk-informed inservice inspection
    • Gopika V., Bidharb S.K., Kushwahaa H.S., Vermab A.K., and Srividyab A. A comprehensive framework for evaluation of piping reliability due to erosion-corrosion for risk-informed inservice inspection. Reliab Eng Syst Safety 82 2 (2003) 187-193
    • (2003) Reliab Eng Syst Safety , vol.82 , Issue.2 , pp. 187-193
    • Gopika, V.1    Bidharb, S.K.2    Kushwahaa, H.S.3    Vermab, A.K.4    Srividyab, A.5
  • 5
    • 0032669583 scopus 로고    scopus 로고
    • Optimal degradation processes control by two-level policies
    • Kopnov V.A. Optimal degradation processes control by two-level policies. Reliab Eng Syst Safety 66 1 (1999) 1-11
    • (1999) Reliab Eng Syst Safety , vol.66 , Issue.1 , pp. 1-11
    • Kopnov, V.A.1
  • 6
    • 0021444682 scopus 로고
    • Reducing production downtime using delay time analysis
    • Christer A.H., and Waller W.M. Reducing production downtime using delay time analysis. J Oper Res Soc 35 6 (1984) 499-512
    • (1984) J Oper Res Soc , vol.35 , Issue.6 , pp. 499-512
    • Christer, A.H.1    Waller, W.M.2
  • 7
    • 0000608699 scopus 로고
    • A delay time based maintenance model of multi-component system
    • Christer A.H., and Wang W. A delay time based maintenance model of multi-component system. IMA J Math Appl Bus Ind 6 2 (1995) 205-220
    • (1995) IMA J Math Appl Bus Ind , vol.6 , Issue.2 , pp. 205-220
    • Christer, A.H.1    Wang, W.2
  • 8
    • 0037211716 scopus 로고    scopus 로고
    • Solution algorithm for a non-homogeneous multi-component inspection model
    • Wang W., and Christer A.H. Solution algorithm for a non-homogeneous multi-component inspection model. Comput Oper Res 30 1 (2003) 19-34
    • (2003) Comput Oper Res , vol.30 , Issue.1 , pp. 19-34
    • Wang, W.1    Christer, A.H.2
  • 9
    • 0030575689 scopus 로고    scopus 로고
    • Imperfect maintenance
    • Pham H., and Wang H. Imperfect maintenance. Eur J Oper Res 94 3 (1996) 425-438
    • (1996) Eur J Oper Res , vol.94 , Issue.3 , pp. 425-438
    • Pham, H.1    Wang, H.2
  • 10
    • 0036837706 scopus 로고    scopus 로고
    • Optimal inspection and preventive maintenance of units with revealed and unrevealed failures
    • Badia F.G., Berrade M.D., and Campos C.A. Optimal inspection and preventive maintenance of units with revealed and unrevealed failures. Reliab Eng Syst Safety 78 2 (2002) 157-163
    • (2002) Reliab Eng Syst Safety , vol.78 , Issue.2 , pp. 157-163
    • Badia, F.G.1    Berrade, M.D.2    Campos, C.A.3
  • 11
    • 0034248564 scopus 로고    scopus 로고
    • Refining the delay-time-based PM inspection model with non-negligible system downtime estimates of the expected number of failures
    • Christer A.H., and Lee C. Refining the delay-time-based PM inspection model with non-negligible system downtime estimates of the expected number of failures. Int J Prod Econ 67 1 (2000) 77-85
    • (2000) Int J Prod Econ , vol.67 , Issue.1 , pp. 77-85
    • Christer, A.H.1    Lee, C.2
  • 12
    • 0034250626 scopus 로고    scopus 로고
    • A data deficiency based parameter estimating problem and case study in delay time PM modelling
    • Christer A.H., Lee C., and Wang W. A data deficiency based parameter estimating problem and case study in delay time PM modelling. Int J Prod Econ 67 1 (2000) 63-76
    • (2000) Int J Prod Econ , vol.67 , Issue.1 , pp. 63-76
    • Christer, A.H.1    Lee, C.2    Wang, W.3
  • 13
    • 0023326879 scopus 로고
    • Delay-time model of reliability of equipment subject to inspection monitoring
    • Christer A.H. Delay-time model of reliability of equipment subject to inspection monitoring. J Oper Res Soc 38 4 (1987) 329-334
    • (1987) J Oper Res Soc , vol.38 , Issue.4 , pp. 329-334
    • Christer, A.H.1
  • 14
    • 0027624651 scopus 로고
    • Inspection interval for maximum future reliability using the delay time model
    • Cerone P. Inspection interval for maximum future reliability using the delay time model. Eur J Oper Res 68 2 (1993) 236-250
    • (1993) Eur J Oper Res , vol.68 , Issue.2 , pp. 236-250
    • Cerone, P.1
  • 15
    • 33748319134 scopus 로고    scopus 로고
    • Society for Industrial and Applied Mathematics, Philadelphia
    • Parzen E. Stochastic processes (1999), Society for Industrial and Applied Mathematics, Philadelphia
    • (1999) Stochastic processes
    • Parzen, E.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.