메뉴 건너뛰기




Volumn 17, Issue 7, 2006, Pages 987-1008

Evaluation of overall line effectiveness (OLE) in a continuous product line manufacturing system

Author keywords

Benchmarking; Line management; Performance measurement (quality); Productive maintenance

Indexed keywords

BENCHMARKING; COMPUTER SIMULATION; PRODUCT DESIGN; PRODUCT DEVELOPMENT; RESEARCH AND DEVELOPMENT MANAGEMENT;

EID: 33748257602     PISSN: 1741038X     EISSN: None     Source Type: Journal    
DOI: 10.1108/17410380610688278     Document Type: Article
Times cited : (102)

References (26)
  • 1
    • 33748268152 scopus 로고    scopus 로고
    • World class manufacturing and benchmarking - The philosophy of performance enhancement
    • Agarwal, S.C. (2000), "World class manufacturing and benchmarking - the philosophy of performance enhancement", Productivity, Vol. 41 No. 2, pp. 206-9.
    • (2000) Productivity , vol.41 , Issue.2 , pp. 206-209
    • Agarwal, S.C.1
  • 2
    • 33748275155 scopus 로고    scopus 로고
    • Benchmarking and world-class manufacturing for competitive advantage
    • Ajay Pandit, K.K. and Yunjing, K. (2000), "Benchmarking and world-class manufacturing for competitive advantage", Productivity, Vol. 41 No. 2, pp. 201-5.
    • (2000) Productivity , vol.41 , Issue.2 , pp. 201-205
    • Ajay Pandit, K.K.1    Yunjing, K.2
  • 5
    • 0030681870 scopus 로고    scopus 로고
    • An enhanced approach for implementing TPM in the manufacturing environment
    • Blanchard, B.S. (1997), "An enhanced approach for implementing TPM in the manufacturing environment", Journal of Quality in Maintenance Engineering, Vol. 3 No. 2, pp. 69-80.
    • (1997) Journal of Quality in Maintenance Engineering , vol.3 , Issue.2 , pp. 69-80
    • Blanchard, B.S.1
  • 7
    • 33748286050 scopus 로고
    • Equipment effectiveness and six big losses
    • Chowdhury, C. and Mandal, T.K. (1995), "Equipment effectiveness and six big losses", Productivity, Vol. 36 No. 1, pp. 110-7.
    • (1995) Productivity , vol.36 , Issue.1 , pp. 110-117
    • Chowdhury, C.1    Mandal, T.K.2
  • 9
    • 33746903648 scopus 로고    scopus 로고
    • TPM: A comprehensive tool for achieving excellence in operations system - A case study
    • Das, D. (2001), "TPM: a comprehensive tool for achieving excellence in operations system - a case study", Industrial Engineering Journal, Vol. 30 No. 10, pp. 15-23.
    • (2001) Industrial Engineering Journal , vol.30 , Issue.10 , pp. 15-23
    • Das, D.1
  • 10
    • 5044227167 scopus 로고    scopus 로고
    • Implementing TPM in Nigerian manufacturing industries
    • Eti, M.C., Ogaji, S.O.T. and Probert, S.D. (2004), "Implementing TPM in Nigerian manufacturing industries", Applied Energy, Vol. 79 No. 4, pp. 385-401.
    • (2004) Applied Energy , vol.79 , Issue.4 , pp. 385-401
    • Eti, M.C.1    Ogaji, S.O.T.2    Probert, S.D.3
  • 11
    • 0036449680 scopus 로고    scopus 로고
    • TPM: Situation and procedure for a soft introduction in Italian factories
    • Ferrai, E., Pareshchi, A., Persona, A. and Regattieri, A. (2002), "TPM: situation and procedure for a soft introduction in Italian factories", The TQM Magazine, Vol. 14 No. 6, pp. 350-8.
    • (2002) The TQM Magazine , vol.14 , Issue.6 , pp. 350-358
    • Ferrai, E.1    Pareshchi, A.2    Persona, A.3    Regattieri, A.4
  • 13
    • 0242269802 scopus 로고    scopus 로고
    • Manufacturing productivity improvement using effectiveness metrics and simulation analysis
    • Huang, S.H., Dismukes, J.P., Shi, J. and Su, Q.I. (2003), "Manufacturing productivity improvement using effectiveness metrics and simulation analysis", International Journal of Production Research, Vol. 41 No. 3, pp. 513-27.
    • (2003) International Journal of Production Research , vol.41 , Issue.3 , pp. 513-527
    • Huang, S.H.1    Dismukes, J.P.2    Shi, J.3    Su, Q.I.4
  • 15
    • 0033481849 scopus 로고    scopus 로고
    • Evaluation and improvement of manufacturing performance measurement systems - The role of OEE
    • Johnson, P. and Lesshammer, M. (1999), "Evaluation and improvement of manufacturing performance measurement systems - the role of OEE", International Journal of Operations & Production Management, Vol. 19 No. 1, pp. 55-77.
    • (1999) International Journal of Operations & Production Management , vol.19 , Issue.1 , pp. 55-77
    • Johnson, P.1    Lesshammer, M.2
  • 16
    • 33748280344 scopus 로고    scopus 로고
    • Implementing TPM - A practical experience
    • Kant, K. (2004), "Implementing TPM - a practical experience", Industrial Engineering Journal, Vol. 33 No. 7, pp. 22-7.
    • (2004) Industrial Engineering Journal , vol.33 , Issue.7 , pp. 22-27
    • Kant, K.1
  • 17
    • 3543045474 scopus 로고
    • Consistency, accuracy lead to maximum OEE benefits
    • AITPM, Productivity Inc., Norwalk, CT
    • Kotze, D. (1993), "Consistency, accuracy lead to maximum OEE benefits", TPM News Letter, Vol. 4 No. 2, AITPM, Productivity Inc., Norwalk, CT.
    • (1993) TPM News Letter , vol.4 , Issue.2
    • Kotze, D.1
  • 18
    • 0032396016 scopus 로고    scopus 로고
    • Measurement of overall equipment effectiveness as a basis for TPM activities
    • Lungberg, O. (1998), "Measurement of overall equipment effectiveness as a basis for TPM activities", International Journal of Operations & Production Management, Vol. 13 No. 5, pp. 495-507.
    • (1998) International Journal of Operations & Production Management , vol.13 , Issue.5 , pp. 495-507
    • Lungberg, O.1
  • 20
  • 21
    • 33748255124 scopus 로고    scopus 로고
    • The buzz on benchmarking: Compare your performance with the best to improve production and out cost
    • available at: www.maintenance resources.com
    • Queen, M.C. (1999), "The buzz on benchmarking: compare your performance with the best to improve production and out cost", Maintenance Technology, available at: www.maintenance resources.com.
    • (1999) Maintenance Technology
    • Queen, M.C.1
  • 24
    • 33748254773 scopus 로고    scopus 로고
    • TPM activity pre audit report Internal circulation copy, Sundaram Industries Limited, Madurai
    • TPM Chairman (2004) TPM activity pre audit report, Internal circulation copy, Sundaram Industries Limited, Madurai.
    • (2004)
    • Chairman, T.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.