-
1
-
-
33748268152
-
World class manufacturing and benchmarking - The philosophy of performance enhancement
-
Agarwal, S.C. (2000), "World class manufacturing and benchmarking - the philosophy of performance enhancement", Productivity, Vol. 41 No. 2, pp. 206-9.
-
(2000)
Productivity
, vol.41
, Issue.2
, pp. 206-209
-
-
Agarwal, S.C.1
-
2
-
-
33748275155
-
Benchmarking and world-class manufacturing for competitive advantage
-
Ajay Pandit, K.K. and Yunjing, K. (2000), "Benchmarking and world-class manufacturing for competitive advantage", Productivity, Vol. 41 No. 2, pp. 201-5.
-
(2000)
Productivity
, vol.41
, Issue.2
, pp. 201-205
-
-
Ajay Pandit, K.K.1
Yunjing, K.2
-
4
-
-
33748257316
-
Application of TPM to vertical boring machine
-
Barve, S.B., Birajdar, M.S., Bhongade, A.S. and Chaudhari, H. (2004), "Application of TPM to vertical boring machine", Industrial Engineering Journal, Vol. 33 No. 7, pp. 22-7.
-
(2004)
Industrial Engineering Journal
, vol.33
, Issue.7
, pp. 22-27
-
-
Barve, S.B.1
Birajdar, M.S.2
Bhongade, A.S.3
Chaudhari, H.4
-
5
-
-
0030681870
-
An enhanced approach for implementing TPM in the manufacturing environment
-
Blanchard, B.S. (1997), "An enhanced approach for implementing TPM in the manufacturing environment", Journal of Quality in Maintenance Engineering, Vol. 3 No. 2, pp. 69-80.
-
(1997)
Journal of Quality in Maintenance Engineering
, vol.3
, Issue.2
, pp. 69-80
-
-
Blanchard, B.S.1
-
6
-
-
10444282169
-
Implementing total productive maintenance: A case study
-
Chan, F.T.S., Lau, H.C.W., Ip, R.W.L., Chan, H.K. and Kong, S. (2004), "Implementing total productive maintenance: a case study", International Journal of Production Economics, Vol. 95 No. 1, pp. 71-94.
-
(2004)
International Journal of Production Economics
, vol.95
, Issue.1
, pp. 71-94
-
-
Chan, F.T.S.1
Lau, H.C.W.2
Ip, R.W.L.3
Chan, H.K.4
Kong, S.5
-
7
-
-
33748286050
-
Equipment effectiveness and six big losses
-
Chowdhury, C. and Mandal, T.K. (1995), "Equipment effectiveness and six big losses", Productivity, Vol. 36 No. 1, pp. 110-7.
-
(1995)
Productivity
, vol.36
, Issue.1
, pp. 110-117
-
-
Chowdhury, C.1
Mandal, T.K.2
-
8
-
-
3543111420
-
Overall equipment effectiveness as a measure of operational improvement
-
Dal, B., Tugwell, P. and Greatbanks, R. (2000), "Overall equipment effectiveness as a measure of operational improvement", International Journal of Operations & Production Management, Vol. 20 No. 12, pp. 1488-502.
-
(2000)
International Journal of Operations & Production Management
, vol.20
, Issue.12
, pp. 1488-1502
-
-
Dal, B.1
Tugwell, P.2
Greatbanks, R.3
-
9
-
-
33746903648
-
TPM: A comprehensive tool for achieving excellence in operations system - A case study
-
Das, D. (2001), "TPM: a comprehensive tool for achieving excellence in operations system - a case study", Industrial Engineering Journal, Vol. 30 No. 10, pp. 15-23.
-
(2001)
Industrial Engineering Journal
, vol.30
, Issue.10
, pp. 15-23
-
-
Das, D.1
-
10
-
-
5044227167
-
Implementing TPM in Nigerian manufacturing industries
-
Eti, M.C., Ogaji, S.O.T. and Probert, S.D. (2004), "Implementing TPM in Nigerian manufacturing industries", Applied Energy, Vol. 79 No. 4, pp. 385-401.
-
(2004)
Applied Energy
, vol.79
, Issue.4
, pp. 385-401
-
-
Eti, M.C.1
Ogaji, S.O.T.2
Probert, S.D.3
-
11
-
-
0036449680
-
TPM: Situation and procedure for a soft introduction in Italian factories
-
Ferrai, E., Pareshchi, A., Persona, A. and Regattieri, A. (2002), "TPM: situation and procedure for a soft introduction in Italian factories", The TQM Magazine, Vol. 14 No. 6, pp. 350-8.
-
(2002)
The TQM Magazine
, vol.14
, Issue.6
, pp. 350-358
-
-
Ferrai, E.1
Pareshchi, A.2
Persona, A.3
Regattieri, A.4
-
12
-
-
33748253115
-
TPM - A study
-
Fluloria, S. and Bharadwaj, S. (2003), "TPM - a study", The ICFAI Journal of Operations Management, Vol. 11 No. 4, pp. 31-52.
-
(2003)
The ICFAI Journal of Operations Management
, vol.11
, Issue.4
, pp. 31-52
-
-
Fluloria, S.1
Bharadwaj, S.2
-
13
-
-
0242269802
-
Manufacturing productivity improvement using effectiveness metrics and simulation analysis
-
Huang, S.H., Dismukes, J.P., Shi, J. and Su, Q.I. (2003), "Manufacturing productivity improvement using effectiveness metrics and simulation analysis", International Journal of Production Research, Vol. 41 No. 3, pp. 513-27.
-
(2003)
International Journal of Production Research
, vol.41
, Issue.3
, pp. 513-527
-
-
Huang, S.H.1
Dismukes, J.P.2
Shi, J.3
Su, Q.I.4
-
14
-
-
0035640727
-
Operational efficiency and effectiveness measurement
-
Jeong, K-Y. and Philips, D.T. (2001), "Operational efficiency and effectiveness measurement", International Journal of Operations & Production Management, Vol. 21 No. 11, pp. 1404-16.
-
(2001)
International Journal of Operations & Production Management
, vol.21
, Issue.11
, pp. 1404-1416
-
-
Jeong, K.-Y.1
Philips, D.T.2
-
15
-
-
0033481849
-
Evaluation and improvement of manufacturing performance measurement systems - The role of OEE
-
Johnson, P. and Lesshammer, M. (1999), "Evaluation and improvement of manufacturing performance measurement systems - the role of OEE", International Journal of Operations & Production Management, Vol. 19 No. 1, pp. 55-77.
-
(1999)
International Journal of Operations & Production Management
, vol.19
, Issue.1
, pp. 55-77
-
-
Johnson, P.1
Lesshammer, M.2
-
16
-
-
33748280344
-
Implementing TPM - A practical experience
-
Kant, K. (2004), "Implementing TPM - a practical experience", Industrial Engineering Journal, Vol. 33 No. 7, pp. 22-7.
-
(2004)
Industrial Engineering Journal
, vol.33
, Issue.7
, pp. 22-27
-
-
Kant, K.1
-
17
-
-
3543045474
-
Consistency, accuracy lead to maximum OEE benefits
-
AITPM, Productivity Inc., Norwalk, CT
-
Kotze, D. (1993), "Consistency, accuracy lead to maximum OEE benefits", TPM News Letter, Vol. 4 No. 2, AITPM, Productivity Inc., Norwalk, CT.
-
(1993)
TPM News Letter
, vol.4
, Issue.2
-
-
Kotze, D.1
-
18
-
-
0032396016
-
Measurement of overall equipment effectiveness as a basis for TPM activities
-
Lungberg, O. (1998), "Measurement of overall equipment effectiveness as a basis for TPM activities", International Journal of Operations & Production Management, Vol. 13 No. 5, pp. 495-507.
-
(1998)
International Journal of Operations & Production Management
, vol.13
, Issue.5
, pp. 495-507
-
-
Lungberg, O.1
-
19
-
-
33748252532
-
Analysis of OEE - A case study
-
Muthukumar, N., Nachiappan, R.M., Kannan, S.M. and Sevagan, K. (2001), "Analysis of OEE - a case study", Proceeding of First International Conference on Logistics and Supply Chain Management (ILSCM-01), PSG College of Technology, Coimbatore, India.
-
(2001)
Proceeding of First International Conference on Logistics and Supply Chain Management (ILSCM-01), PSG College of Technology, Coimbatore, India
-
-
Muthukumar, N.1
Nachiappan, R.M.2
Kannan, S.M.3
Sevagan, K.4
-
20
-
-
0003410612
-
-
Productivity Press Cambridge, MA
-
Nakajima, S. (1988), Introduction to TPM, Productivity Press, Cambridge, MA.
-
(1988)
Introduction to TPM
-
-
Nakajima, S.1
-
21
-
-
33748255124
-
The buzz on benchmarking: Compare your performance with the best to improve production and out cost
-
available at: www.maintenance resources.com
-
Queen, M.C. (1999), "The buzz on benchmarking: compare your performance with the best to improve production and out cost", Maintenance Technology, available at: www.maintenance resources.com.
-
(1999)
Maintenance Technology
-
-
Queen, M.C.1
-
24
-
-
33748254773
-
-
TPM activity pre audit report Internal circulation copy, Sundaram Industries Limited, Madurai
-
TPM Chairman (2004) TPM activity pre audit report, Internal circulation copy, Sundaram Industries Limited, Madurai.
-
(2004)
-
-
Chairman, T.1
-
26
-
-
0042919600
-
Learning curve analysis in TPM
-
Wang, F.K. and Lee, W. (2001), "Learning curve analysis in TPM", The International Journal of Management Science, Vol. 29, pp. 491-9.
-
(2001)
The International Journal of Management Science
, vol.29
, pp. 491-499
-
-
Wang, F.K.1
Lee, W.2
|