Volumn 20, Issue 7, 2006, Pages 585-607

Comparative study of dispatching rules in a real-life job shop environment

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SIMULATION; MATHEMATICAL MODELS; PERFORMANCE; SCHEDULING;

EID: 33747889825     PISSN: 08839514     EISSN: 10876545     Source Type: Journal    
DOI: 10.1080/08839510600779738     Document Type: Article
Times cited : (17)

References (18)
  • 4
    • 0032679758 scopus 로고    scopus 로고
    • Reducing total tardiness cost in manufacturing cell scheduling by a multifactor priority rule
    • Chen, S. G. and L. Lin. 1999. Reducing total tardiness cost in manufacturing cell scheduling by a multifactor priority rule. International Journal of Production Research 37:2939-2956.
    • (1999) International Journal of Production Research , vol.37 , pp. 2939-2956
    • Chen, S.G.1    Lin, L.2
  • 5
    • 0031542280 scopus 로고    scopus 로고
    • A computational study of shifting bottleneck procedures for shop scheduling problems
    • Demirkol, E., S. Mehta, and R. Uzsoy. 1997. A computational study of shifting bottleneck procedures for shop scheduling problems. Journal of Heuristics 3:111-137.
    • (1997) Journal of Heuristics , vol.3 , pp. 111-137
    • Demirkol, E.1    Mehta, S.2    Uzsoy, R.3
  • 7
    • 0030121742 scopus 로고    scopus 로고
    • Extending the shifting bottleneck procedure to real life applications
    • Ivens, P. and M. Lambrecht. 1996. Extending the shifting bottleneck procedure to real life applications. European Journal of Operational Research 90:252-268.
    • (1996) European Journal of Operational Research , vol.90 , pp. 252-268
    • Ivens, P.1    Lambrecht, M.2
  • 9
    • 0029387523 scopus 로고
    • Technical note: Evaluation of scheduling rules with commensurate customer priorities in job shops
    • Jensen, J. B., P. R. Philipoom, and M. K. Malhotra. 1995. Technical note: Evaluation of scheduling rules with commensurate customer priorities in job shops. Journal of Operations Management 13:213-228.
    • (1995) Journal of Operations Management , vol.13 , pp. 213-228
    • Jensen, J.B.1    Philipoom, P.R.2    Malhotra, M.K.3
  • 10
    • 0027306874 scopus 로고
    • Resource-constrained multi project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics
    • Lawrence, S. R. and T. E. Morton. 1993. Resource-constrained multi project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics. European Journal of Operational Research 64:168-197.
    • (1993) European Journal of Operational Research , vol.64 , pp. 168-197
    • Lawrence, S.R.1    Morton, T.E.2
  • 11
    • 0032183949 scopus 로고    scopus 로고
    • Dispatching rules for stochastic finite capacity scheduling
    • Liu K. C. 1998. Dispatching rules for stochastic finite capacity scheduling. Computers and Engineering 35:113-116.
    • (1998) Computers and Engineering , vol.35 , pp. 113-116
    • Liu, K.C.1
  • 13
    • 0023437076 scopus 로고
    • A comparative analysis of the COVERT job sequencing rule using various shop performance measures
    • Russel, R. S., E. M. Dar-el, and B. W. Taylor. 1987. A comparative analysis of the COVERT job sequencing rule using various shop performance measures. International Journal of Production Research 25:2287-2305.
    • (1987) International Journal of Production Research , vol.25 , pp. 2287-2305
    • Russel, R.S.1    Dar-El, E.M.2    Taylor, B.W.3
  • 15
    • 0030072218 scopus 로고    scopus 로고
    • Combinatorial evaluation of six dispatching rules in a dynamic two-machine How shop
    • Sarper, H. and M. C. Henry. 1996. Combinatorial evaluation of six dispatching rules in a dynamic two-machine How shop. International Journal of Management Science, 24:73-81.
    • (1996) International Journal of Management Science , vol.24 , pp. 73-81
    • Sarper, H.1    Henry, M.C.2
  • 17
    • 0003147390 scopus 로고    scopus 로고
    • Two heuristics for scheduling multiple projects with resource constraints
    • Tsai, D. M. and H. N. Chiu. 1996. Two heuristics for scheduling multiple projects with resource constraints. Construction Management and Economics 14:325-340.
    • (1996) Construction Management and Economics , vol.14 , pp. 325-340
    • Tsai, D.M.1    Chiu, H.N.2
  • 18
    • 0023399009 scopus 로고
    • Priority rules for job shops with weighted tardiness costs
    • Vepsalainen, A. P. J. and T. E. Morton. 1987. Priority rules for job shops with weighted tardiness costs. Management Science 33(8):1035-1047.
    • (1987) Management Science , vol.33 , Issue.8 , pp. 1035-1047
    • Vepsalainen, A.P.J.1    Morton, T.E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.