메뉴 건너뛰기




Volumn 8, Issue 3, 2006, Pages 292-319

Integrated real-time capacity and inventory allocation for reparable service parts in a two-echelon supply system

Author keywords

Emergency shipment; Inventory; Limited capacity; Multiechelon system; Periodic review; Priority dispatch rule; Real time allocation; Reparable service parts

Indexed keywords

EMERGENCY SHIPMENT; INVENTORY; LIMITED CAPACITY; MULTIECHELON SYSTEMS; PERIODIC REVIEW; PRIORITY DISPATCH RULE; REAL-TIME ALLOCATION; REPARABLE SERVICE PARTS;

EID: 33747192873     PISSN: 15234614     EISSN: 15265498     Source Type: Journal    
DOI: 10.1287/msom.1060.0107     Document Type: Article
Times cited : (47)

References (43)
  • 1
    • 0028400719 scopus 로고
    • Order expedition in multiechelon production/distribution systems
    • Aggarwal, P. K., K. Moinzadeh. 1994. Order expedition in multiechelon production/distribution systems. IIE Trans. 26 86-96.
    • (1994) IIE Trans. , vol.26 , pp. 86-96
    • Aggarwal, P.K.1    Moinzadeh, K.2
  • 2
    • 0027590001 scopus 로고
    • A comparison of allocation policies in a two-echelon repairable-item inventory model
    • Buyukkurt, M. D., M. Parlar. 1993. A comparison of allocation policies in a two-echelon repairable-item inventory model. Internat. J. Production Econom. 29 291-302.
    • (1993) Internat. J. Production Econom. , vol.29 , pp. 291-302
    • Buyukkurt, M.D.1    Parlar, M.2
  • 3
    • 33747152060 scopus 로고    scopus 로고
    • Real-time capacity and inventory allocation decisions for reparables in a two-echelon system with emergency shipments
    • School of Operations Research and Industrial Engineering, Cornell University, Ithaca, NY
    • Caggiano, K. E., J. A. Muckstadt, J. A. Rappold. 2003. Real-time capacity and inventory allocation decisions for reparables in a two-echelon system with emergency shipments. Technical report, School of Operations Research and Industrial Engineering, Cornell University, Ithaca, NY.
    • (2003) Technical Report
    • Caggiano, K.E.1    Muckstadt, J.A.2    Rappold, J.A.3
  • 4
    • 33747175520 scopus 로고    scopus 로고
    • Determining and allocating capacity-driven safety stock in multi-item, multiechelon systems
    • School of Business, University of Wisconsin, Madison, WI
    • Chan, E. W., J. A. Rappold, J. A. Muckstadt. 1999. Determining and allocating capacity-driven safety stock in multi-item, multiechelon systems. Working paper, School of Business, University of Wisconsin, Madison, WI.
    • (1999) Working Paper
    • Chan, E.W.1    Rappold, J.A.2    Muckstadt, J.A.3
  • 5
    • 0038559803 scopus 로고    scopus 로고
    • Optimal replenishment for a periodic review inventory system with two supply modes
    • Chiang, C. 2003. Optimal replenishment for a periodic review inventory system with two supply modes. Eur. J. Oper. Res. 149 229-244.
    • (2003) Eur. J. Oper. Res. , vol.149 , pp. 229-244
    • Chiang, C.1
  • 6
    • 0032024070 scopus 로고    scopus 로고
    • Optimal control policies for a periodic review inventory system with emergency orders
    • Chiang, C., G. Gutierrez. 1998. Optimal control policies for a periodic review inventory system with emergency orders. Naval Res. Logist. 45 187-204.
    • (1998) Naval Res. Logist. , vol.45 , pp. 187-204
    • Chiang, C.1    Gutierrez, G.2
  • 7
    • 0022659627 scopus 로고
    • Optimal stocking policies for low usage items in multiechelon inventory systems
    • Cohen, M., P. Kleindorfer, H. L. Lee. 1986. Optimal stocking policies for low usage items in multiechelon inventory systems. Naval Res. Logist. Quart. 33 17-38.
    • (1986) Naval Res. Logist. Quart. , vol.33 , pp. 17-38
    • Cohen, M.1    Kleindorfer, P.2    Lee, H.L.3
  • 9
    • 0028417245 scopus 로고
    • Base stock level determination for high cost low demand critical repairable spares
    • Dhakar, T. S., C. P. Schmidt. 1994. Base stock level determination for high cost low demand critical repairable spares. Comput. Oper. Res. 21 411-420.
    • (1994) Comput. Oper. Res. , vol.21 , pp. 411-420
    • Dhakar, T.S.1    Schmidt, C.P.2
  • 10
    • 0028547827 scopus 로고
    • A simple release policy for networks of queues with controllable inputs
    • Duenyas, I. 1994. A simple release policy for networks of queues with controllable inputs. Oper. Res. 42 1162-1171.
    • (1994) Oper. Res. , vol.42 , pp. 1162-1171
    • Duenyas, I.1
  • 11
    • 0021156045 scopus 로고
    • Approximations of dynamic multi-location production and inventory problems
    • Federgruen, A., P. Zipkin. 1984. Approximations of dynamic multi-location production and inventory problems. Management Sci. 30 69-84.
    • (1984) Management Sci. , vol.30 , pp. 69-84
    • Federgruen, A.1    Zipkin, P.2
  • 12
    • 0000867308 scopus 로고
    • The (S - 1, S) inventory policy under compound Poisson demand
    • Feeney, G. J., C. C. Sherbrooke. 1966. The (S - 1, S) inventory policy under compound Poisson demand. Management Sci. 12 391-411.
    • (1966) Management Sci. , vol.12 , pp. 391-411
    • Feeney, G.J.1    Sherbrooke, C.C.2
  • 13
    • 33747167195 scopus 로고    scopus 로고
    • Air Force inventory: Parts shortages are impacting operations and maintenance effectiveness
    • United States General Accounting Office, Washington, D.C.
    • GAO. 2001. Air Force inventory: Parts shortages are impacting operations and maintenance effectiveness. Report to Congressional Committees GAO-01-587, United States General Accounting Office, Washington, D.C.
    • (2001) Report to Congressional Committees GAO-01-587
  • 14
    • 0022146583 scopus 로고
    • A multi-echelon inventory model for a repairable item with one-for-one replenishment
    • Graves, S. C. 1985. A multi-echelon inventory model for a repairable item with one-for-one replenishment. Management Sci. 31 1247-1256.
    • (1985) Management Sci. , vol.31 , pp. 1247-1256
    • Graves, S.C.1
  • 16
    • 0031249294 scopus 로고    scopus 로고
    • Repairable inventory theory: Models and applications
    • Guide, D. R., R. Srivastava. 1997. Repairable inventory theory: Models and applications. Eur. J. Oper. Res. 102 1-20.
    • (1997) Eur. J. Oper. Res. , vol.102 , pp. 1-20
    • Guide, D.R.1    Srivastava, R.2
  • 17
    • 0020204870 scopus 로고
    • Priority scheduling rules for repairable inventory systems
    • Hausman, W. H., G. D. Scudder. 1982. Priority scheduling rules for repairable inventory systems. Management Sci. 29 1215-1232.
    • (1982) Management Sci. , vol.29 , pp. 1215-1232
    • Hausman, W.H.1    Scudder, G.D.2
  • 20
    • 0030407745 scopus 로고    scopus 로고
    • Dynamic release control policy for the semiconductor wafer fabrication lines
    • Kim, J., R. C. Leachman, B. Suh. 1996. Dynamic release control policy for the semiconductor wafer fabrication lines. J. Oper. Res. Soc. 47 1516-1525.
    • (1996) J. Oper. Res. Soc. , vol.47 , pp. 1516-1525
    • Kim, J.1    Leachman, R.C.2    Suh, B.3
  • 21
    • 0023436887 scopus 로고
    • A multiechelon inventory model for repairable items with emergency lateral transshipments
    • Lee, H. L. 1987. A multiechelon inventory model for repairable items with emergency lateral transshipments. Management Sci. 33 1302-1316.
    • (1987) Management Sci. , vol.33 , pp. 1302-1316
    • Lee, H.L.1
  • 22
    • 0023366385 scopus 로고
    • Operating characteristics of a two-echelon inventory system for repairable and consumable items under batch ordering and shipment policy
    • Lee, H. L., K. Moinzadeh. 1987. Operating characteristics of a two-echelon inventory system for repairable and consumable items under batch ordering and shipment policy. Naval Res. Logist. 34 365-380.
    • (1987) Naval Res. Logist. , vol.34 , pp. 365-380
    • Lee, H.L.1    Moinzadeh, K.2
  • 24
    • 0031223930 scopus 로고    scopus 로고
    • An information based multiechelon inventory system with emergency orders
    • Moinzadeh, K., P. K. Aggarwal. 1997. An information based multiechelon inventory system with emergency orders. Oper. Res. 45 694-701.
    • (1997) Oper. Res. , vol.45 , pp. 694-701
    • Moinzadeh, K.1    Aggarwal, P.K.2
  • 25
    • 0026117295 scopus 로고
    • An (S -1, S) inventory system with emergency orders
    • Moinzadeh, K., C. P. Schmidt. 1991. An (S -1, S) inventory system with emergency orders. Oper. Res. 39 308-321.
    • (1991) Oper. Res. , vol.39 , pp. 308-321
    • Moinzadeh, K.1    Schmidt, C.P.2
  • 26
    • 0015768797 scopus 로고
    • A model for a multi-item, multi-echelon, multi-indenture inventory system
    • Muckstadt, J. A. 1973. A model for a multi-item, multi-echelon, multi-indenture inventory system. Management Sci. 20 472-481.
    • (1973) Management Sci. , vol.20 , pp. 472-481
    • Muckstadt, J.A.1
  • 27
    • 0018014606 scopus 로고
    • Some approximations in multi-item, multiechelon inventory systems for recoverable items
    • Muckstadt, J. A. 1978. Some approximations in multi-item, multiechelon inventory systems for recoverable items. Naval Res. Logist. Quart. 25 377-394.
    • (1978) Naval Res. Logist. Quart. , vol.25 , pp. 377-394
    • Muckstadt, J.A.1
  • 28
    • 0003042140 scopus 로고
    • Analysis of the Erlang traffic formula for busy signal arrangements
    • Palm, C. 1938. Analysis of the Erlang traffic formula for busy signal arrangements. Ericsson Technics 5 39-58.
    • (1938) Ericsson Technics , vol.5 , pp. 39-58
    • Palm, C.1
  • 29
    • 0031268975 scopus 로고    scopus 로고
    • Dynamic scheduling rules for a multiproduct make-to-stock queue
    • Peña Perez, A., P. Zipkin. 1997. Dynamic scheduling rules for a multiproduct make-to-stock queue. Oper. Res. 45 919-930.
    • (1997) Oper. Res. , vol.45 , pp. 919-930
    • Peña Perez, A.1    Zipkin, P.2
  • 30
    • 0025387771 scopus 로고
    • Priority repair and dispatch policies for repairable-item logisitics systems
    • Pyke, D. F. 1990. Priority repair and dispatch policies for repairable-item logisitics systems. Naval Res. Logist. 37 1-30.
    • (1990) Naval Res. Logist. , vol.37 , pp. 1-30
    • Pyke, D.F.1
  • 31
    • 21444437948 scopus 로고    scopus 로고
    • Lean logistics: High-velocity logistics infrastructure and the C-5 Galaxy
    • RAND Corporation, Santa Monica, CA
    • Ramey, T. L. 1999. Lean logistics: High-velocity logistics infrastructure and the C-5 Galaxy. Technical Report MR-581-AF, RAND Corporation, Santa Monica, CA.
    • (1999) Technical Report , vol.MR-581-AF
    • Ramey, T.L.1
  • 32
    • 33747200019 scopus 로고    scopus 로고
    • Inventory models with expedited ordering: Single index policies
    • Tepper School of Business, Carnegie Mellon University, Pittsburgh, PA
    • Scheller-Wolf, A., G.-J. van Houtum, S. Veeraraghavan. 2003. Inventory models with expedited ordering: Single index policies. Technical Report 2003-E52, Tepper School of Business, Carnegie Mellon University, Pittsburgh, PA.
    • (2003) Technical Report , vol.2003 , Issue.E52
    • Scheller-Wolf, A.1    Van Houtum, G.-J.2    Veeraraghavan, S.3
  • 33
    • 0021445189 scopus 로고
    • Priority scheduling and spares stocking policies for a repair shop: The multiple failure case
    • Scudder, G. D. 1984. Priority scheduling and spares stocking policies for a repair shop: The multiple failure case. Management Sci. 30 739-749.
    • (1984) Management Sci. , vol.30 , pp. 739-749
    • Scudder, G.D.1
  • 34
    • 0020145482 scopus 로고
    • Spares stocking policies for repairable items with dependent repair times
    • Scudder, G. D., W. H. Hausman. 1982. Spares stocking policies for repairable items with dependent repair times. Naval Res. Logist. Quart. 29 303-322.
    • (1982) Naval Res. Logist. Quart. , vol.29 , pp. 303-322
    • Scudder, G.D.1    Hausman, W.H.2
  • 35
    • 0000946660 scopus 로고
    • METRIC: A multi-echelon technique for recoverable item control
    • Sherbrooke, C. C. 1968. METRIC: A multi-echelon technique for recoverable item control. Oper. Res. 16 122-141.
    • (1968) Oper. Res. , vol.16 , pp. 122-141
    • Sherbrooke, C.C.1
  • 36
    • 0022674625 scopus 로고
    • VARI-METRIC: Improved approximations for multi-indenture, multi-echelon availability models
    • Sherbrooke, C. C. 1986. VARI-METRIC: Improved approximations for multi-indenture, multi-echelon availability models. Oper. Res. 34 311-319.
    • (1986) Oper. Res. , vol.34 , pp. 311-319
    • Sherbrooke, C.C.1
  • 37
    • 33747160628 scopus 로고
    • VARI-METRIC: An approach to modeling multiechelon resupply when the demand process is Poisson with gamma prior
    • Logistics Management Institute, Washington, D.C.
    • Slay, F. M. 1984. VARI-METRIC: An approach to modeling multiechelon resupply when the demand process is Poisson with gamma prior. Working Note AF301-3, Logistics Management Institute, Washington, D.C.
    • (1984) Working Note , vol.AF301-3
    • Slay, F.M.1
  • 38
    • 0035295088 scopus 로고    scopus 로고
    • A periodic review inventory system with emergency replenishments
    • Tagaras, G., D. Vlachos. 2001. A periodic review inventory system with emergency replenishments. Management Sci. 47 415-429.
    • (2001) Management Sci. , vol.47 , pp. 415-429
    • Tagaras, G.1    Vlachos, D.2
  • 39
    • 0035427082 scopus 로고    scopus 로고
    • An inventory system with periodic regular review and flexible emergency review
    • Teunter, R., D. Vlachos. 2001. An inventory system with periodic regular review and flexible emergency review. IIE Trans. 33 625-635.
    • (2001) IIE Trans. , vol.33 , pp. 625-635
    • Teunter, R.1    Vlachos, D.2
  • 40
    • 0031998566 scopus 로고    scopus 로고
    • A trade-off between emergency repair and inventory investment
    • Verrijdt, J., I. Adan, T. de Kok. 1998. A trade-off between emergency repair and inventory investment. IIE Trans. 30 119-132.
    • (1998) IIE Trans. , vol.30 , pp. 119-132
    • Verrijdt, J.1    Adan, I.2    De Kok, T.3
  • 41
    • 0035973394 scopus 로고    scopus 로고
    • An inventory system with two supply modes and capacity constraints
    • Vlachos, D., G. Tagaras. 2001. An inventory system with two supply modes and capacity constraints. Internat. J. Production Econom. 72 41-58.
    • (2001) Internat. J. Production Econom. , vol.72 , pp. 41-58
    • Vlachos, D.1    Tagaras, G.2
  • 42
    • 0026859187 scopus 로고
    • Scheduling networks of queues: Heavy traffic analysis of a multistation network with controllable inputs
    • Wein, L. M. 1992. Scheduling networks of queues: Heavy traffic analysis of a multistation network with controllable inputs. Oper. Res. 40 S312-S334.
    • (1992) Oper. Res. , vol.40
    • Wein, L.M.1
  • 43
    • 0026884810 scopus 로고
    • A broader view of the job-shop scheduling problem
    • Wein, L. M., P. B. Chevalier. 1992. A broader view of the job-shop scheduling problem. Management Sci. 38 1018-1033.
    • (1992) Management Sci. , vol.38 , pp. 1018-1033
    • Wein, L.M.1    Chevalier, P.B.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.