메뉴 건너뛰기




Volumn 38, Issue 10, 2006, Pages 813-828

Determining production sequences for single-stage multifunctional machining systems based on the tradeoff between fixture cost, re-fixturing and tool replenishment

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; MACHINING CENTERS; OPERATIONS RESEARCH; OPTIMIZATION; PROCESS ENGINEERING; THROUGHPUT; TIME AND MOTION STUDY;

EID: 33746430109     PISSN: 0740817X     EISSN: 15458830     Source Type: Journal    
DOI: 10.1080/07408170500516707     Document Type: Article
Times cited : (4)

References (24)
  • 1
    • 0030284842 scopus 로고    scopus 로고
    • Tool magazine arrangement and operations sequencing on CNC machines
    • [CSA]
    • Avci, S. and Akturk, M. (1996) Tool magazine arrangement and operations sequencing on CNC machines Computers Operations Research, 23(11), pp. 1069-1081. [CSA]
    • (1996) Computers Operations Research , vol.23 , Issue.11 , pp. 1069-1081
    • Avci, S.1    Akturk, M.2
  • 2
    • 0029469956 scopus 로고
    • Impact of job-sequence on the down-time of a deteriorating flexible machine
    • [CSA] [CROSSREF]
    • Chakravarty, A. and Balakrishnan, N. (1995) Impact of job-sequence on the down-time of a deteriorating flexible machine European Journal of Operational Research, 87(2), pp. 299-315. [CSA] [CROSSREF]
    • (1995) European Journal of Operational Research , vol.87 , Issue.2 , pp. 299-315
    • Chakravarty, A.1    Balakrishnan, N.2
  • 3
    • 0027848396 scopus 로고
    • Jobs and tool sequencing in an automated manufacturing environment
    • [CSA]
    • Chandra, P. and Li, S. and Stan, M. (1993) Jobs and tool sequencing in an automated manufacturing environment International Journal of Production Research, 31(12), pp. 2911-2925. [CSA]
    • (1993) International Journal of Production Research , vol.31 , Issue.12 , pp. 2911-2925
    • Chandra, P.1    Li, S.2    Stan, M.3
  • 5
    • 0028518280 scopus 로고
    • A column approach to job grouping for flexible manufacturing systems
    • [CSA] [CROSSREF]
    • Crama, Y. and Oerlemans, A. (1994) A column approach to job grouping for flexible manufacturing systems European Journal of Operational Research, 78, pp. 58-80. [CSA] [CROSSREF]
    • (1994) European Journal of Operational Research , vol.78 , pp. 58-80
    • Crama, Y.1    Oerlemans, A.2
  • 6
    • 0027591340 scopus 로고
    • Synthesis of decision models for tool management in automated manufacturing
    • [CSA]
    • Gray, A. and Seidmann, A. and Stecke, K. (1992) Synthesis of decision models for tool management in automated manufacturing Management Science, 39(5), pp. 549-567. [CSA]
    • (1992) Management Science , vol.39 , Issue.5 , pp. 549-567
    • Gray, A.1    Seidmann, A.2    Stecke, K.3
  • 8
    • 0028273650 scopus 로고
    • Performance analysis of LIM-based high-speed tool delivery system for machining
    • [CSA]
    • Hahn, H. and Sanders, J. (1994) Performance analysis of LIM-based high-speed tool delivery system for machining International Journal of Production Research, 32(1), pp. 179-207. [CSA]
    • (1994) International Journal of Production Research , vol.32 , Issue.1 , pp. 179-207
    • Hahn, H.1    Sanders, J.2
  • 9
    • 0032131897 scopus 로고    scopus 로고
    • Heuristics for minimizing toll switches when scheduling part types on a flexible machine
    • [CSA] [CROSSREF]
    • Hertz, A. and Laporte, G. and Mittaz, M. and Stecke, K. (1998) Heuristics for minimizing toll switches when scheduling part types on a flexible machine IIE Transactions, 30(8), pp. 689-694. [CSA] [CROSSREF]
    • (1998) IIE Transactions , vol.30 , Issue.8 , pp. 689-694
    • Hertz, A.1    Laporte, G.2    Mittaz, M.3    Stecke, K.4
  • 10
    • 0024116476 scopus 로고
    • Fast mounting system for jigs and fixtures
    • [CSA]
    • Hoffman, E. (1988) Fast mounting system for jigs and fixtures Modern Machine Shop, 61(6), pp. 78-83. [CSA]
    • (1988) Modern Machine Shop , vol.61 , Issue.6 , pp. 78-83
    • Hoffman, E.1
  • 11
    • 0032624321 scopus 로고    scopus 로고
    • Setup and fixture planning in automated process planning systems
    • [CSA] [CROSSREF]
    • Joneja, A. and Chang, T. (1999) Setup and fixture planning in automated process planning systems IIE Transactions, 7, pp. 653-665. [CSA] [CROSSREF]
    • (1999) IIE Transactions , vol.7 , pp. 653-665
    • Joneja, A.1    Chang, T.2
  • 12
    • 0033099219 scopus 로고    scopus 로고
    • Real-time operation and tool selection in single stage multifunctional machine systems
    • [CSA] [CROSSREF]
    • Koo, P. and Tanchoco, J. (1999) Real-time operation and tool selection in single stage multifunctional machine systems International Journal of Production Research, 37(5), pp. 1023-1039. [CSA] [CROSSREF]
    • (1999) International Journal of Production Research , vol.37 , Issue.5 , pp. 1023-1039
    • Koo, P.1    Tanchoco, J.2
  • 13
    • 0025444954 scopus 로고
    • Optimal selection of machinable volumes
    • [CSA]
    • Kusiak, A. (1990) Optimal selection of machinable volumes IIE Transactions, 22(2), pp. 151-162. [CSA]
    • (1990) IIE Transactions , vol.22 , Issue.2 , pp. 151-162
    • Kusiak, A.1
  • 14
    • 0004542855 scopus 로고
    • Algorithm for tool placement in an automatic tool change magazine
    • [CSA]
    • Levitin, G. and Rubinovitz, J. (1995) Algorithm for tool placement in an automatic tool change magazine International Journal of Production Research, 33(2), pp. 351-360. [CSA]
    • (1995) International Journal of Production Research , vol.33 , Issue.2 , pp. 351-360
    • Levitin, G.1    Rubinovitz, J.2
  • 15
    • 0035371898 scopus 로고    scopus 로고
    • Scheduling of the optimal tool replacement times in a flexible manufacturing system
    • [CSA] [CROSSREF]
    • Liu, P. and Makis, V. and Jardine, A. (2001) Scheduling of the optimal tool replacement times in a flexible manufacturing system IIE Transactions, 33(6), pp. 487-495. [CSA] [CROSSREF]
    • (2001) IIE Transactions , vol.33 , Issue.6 , pp. 487-495
    • Liu, P.1    Makis, V.2    Jardine, A.3
  • 17
    • 33746441984 scopus 로고    scopus 로고
    • Quick setup times critical
    • [CSA]
    • Ohm, L. (2000) Quick setup times critical FDM Magazine, 72(15), pp. 82-83. [CSA]
    • (2000) FDM Magazine , vol.72 , Issue.15 , pp. 82-83
    • Ohm, L.1
  • 18
    • 0024119088 scopus 로고    scopus 로고
    • Indexing fixtures enhance vertical machining center
    • [CSA]
    • Poling, D. (1998) Indexing fixtures enhance vertical machining center Modern Machine Shop, 61(6), pp. 62-66. [CSA]
    • (1998) Modern Machine Shop , vol.61 , Issue.6 , pp. 62-66
    • Poling, D.1
  • 19
    • 0002274363 scopus 로고    scopus 로고
    • Algorithms for the minimization of setups and tool changes in "simply fixturable" components of milling
    • [CSA]
    • Sarma, S. and Wright, P. (1996) Algorithms for the minimization of setups and tool changes in "simply fixturable" components of milling Journal of Manufacturing Systems, 15(2), pp. 95-111. [CSA]
    • (1996) Journal of Manufacturing Systems , vol.15 , Issue.2 , pp. 95-111
    • Sarma, S.1    Wright, P.2
  • 21
    • 0032364575 scopus 로고    scopus 로고
    • Process selection and cell assignment in cellular manufacturing using genetic algorithms
    • [CSA] [CROSSREF]
    • Sinriech, D. and Abekasis, M. (1998) Process selection and cell assignment in cellular manufacturing using genetic algorithms Annals of Operations Research, 77, pp. 51-78. [CSA] [CROSSREF]
    • (1998) Annals of Operations Research , vol.77 , pp. 51-78
    • Sinriech, D.1    Abekasis, M.2
  • 22
    • 0035480394 scopus 로고    scopus 로고
    • Sequencing, scheduling and tooling single stage multifuncional machines in a small batch environment
    • [CSA] [CROSSREF]
    • Sinriech, D. and Rubinovitz, J. and Milo, D. and Nakbily, G. (2001) Sequencing, scheduling and tooling single stage multifuncional machines in a small batch environment IIE Transactions, 33(10), pp. 897-911. [CSA] [CROSSREF]
    • (2001) IIE Transactions , vol.33 , Issue.10 , pp. 897-911
    • Sinriech, D.1    Rubinovitz, J.2    Milo, D.3    Nakbily, G.4
  • 23
  • 24
    • 0030192480 scopus 로고    scopus 로고
    • Setup savings
    • [CSA]
    • Venjara, Y. (1996) Setup savings Manufacturing Engineering, 117(1), pp. 96-102. [CSA]
    • (1996) Manufacturing Engineering , vol.117 , Issue.1 , pp. 96-102
    • Venjara, Y.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.