-
1
-
-
0030284842
-
Tool magazine arrangement and operations sequencing on CNC machines
-
[CSA]
-
Avci, S. and Akturk, M. (1996) Tool magazine arrangement and operations sequencing on CNC machines Computers Operations Research, 23(11), pp. 1069-1081. [CSA]
-
(1996)
Computers Operations Research
, vol.23
, Issue.11
, pp. 1069-1081
-
-
Avci, S.1
Akturk, M.2
-
2
-
-
0029469956
-
Impact of job-sequence on the down-time of a deteriorating flexible machine
-
[CSA] [CROSSREF]
-
Chakravarty, A. and Balakrishnan, N. (1995) Impact of job-sequence on the down-time of a deteriorating flexible machine European Journal of Operational Research, 87(2), pp. 299-315. [CSA] [CROSSREF]
-
(1995)
European Journal of Operational Research
, vol.87
, Issue.2
, pp. 299-315
-
-
Chakravarty, A.1
Balakrishnan, N.2
-
3
-
-
0027848396
-
Jobs and tool sequencing in an automated manufacturing environment
-
[CSA]
-
Chandra, P. and Li, S. and Stan, M. (1993) Jobs and tool sequencing in an automated manufacturing environment International Journal of Production Research, 31(12), pp. 2911-2925. [CSA]
-
(1993)
International Journal of Production Research
, vol.31
, Issue.12
, pp. 2911-2925
-
-
Chandra, P.1
Li, S.2
Stan, M.3
-
4
-
-
0028014137
-
Minimizing the number of tool switches on a flexible machine
-
[CSA] [CROSSREF]
-
Crama, Y. and Kolen, A. and Oerlemans, A. and Spieksma, F. (1994) Minimizing the number of tool switches on a flexible machine International Journal of Flexible Manufacturing Systems, 6(1), pp. 33-54. [CSA] [CROSSREF]
-
(1994)
International Journal of Flexible Manufacturing Systems
, vol.6
, Issue.1
, pp. 33-54
-
-
Crama, Y.1
Kolen, A.2
Oerlemans, A.3
Spieksma, F.4
-
5
-
-
0028518280
-
A column approach to job grouping for flexible manufacturing systems
-
[CSA] [CROSSREF]
-
Crama, Y. and Oerlemans, A. (1994) A column approach to job grouping for flexible manufacturing systems European Journal of Operational Research, 78, pp. 58-80. [CSA] [CROSSREF]
-
(1994)
European Journal of Operational Research
, vol.78
, pp. 58-80
-
-
Crama, Y.1
Oerlemans, A.2
-
6
-
-
0027591340
-
Synthesis of decision models for tool management in automated manufacturing
-
[CSA]
-
Gray, A. and Seidmann, A. and Stecke, K. (1992) Synthesis of decision models for tool management in automated manufacturing Management Science, 39(5), pp. 549-567. [CSA]
-
(1992)
Management Science
, vol.39
, Issue.5
, pp. 549-567
-
-
Gray, A.1
Seidmann, A.2
Stecke, K.3
-
7
-
-
0000329136
-
Simulation of tool and part flow in FMS
-
[CSA]
-
Grieco, A. and Semeraro, Q. and Tolio, T. and Toma, S. (1995) Simulation of tool and part flow in FMS International Journal of Production Research, 33(3), pp. 643-658. [CSA]
-
(1995)
International Journal of Production Research
, vol.33
, Issue.3
, pp. 643-658
-
-
Grieco, A.1
Semeraro, Q.2
Tolio, T.3
Toma, S.4
-
8
-
-
0028273650
-
Performance analysis of LIM-based high-speed tool delivery system for machining
-
[CSA]
-
Hahn, H. and Sanders, J. (1994) Performance analysis of LIM-based high-speed tool delivery system for machining International Journal of Production Research, 32(1), pp. 179-207. [CSA]
-
(1994)
International Journal of Production Research
, vol.32
, Issue.1
, pp. 179-207
-
-
Hahn, H.1
Sanders, J.2
-
9
-
-
0032131897
-
Heuristics for minimizing toll switches when scheduling part types on a flexible machine
-
[CSA] [CROSSREF]
-
Hertz, A. and Laporte, G. and Mittaz, M. and Stecke, K. (1998) Heuristics for minimizing toll switches when scheduling part types on a flexible machine IIE Transactions, 30(8), pp. 689-694. [CSA] [CROSSREF]
-
(1998)
IIE Transactions
, vol.30
, Issue.8
, pp. 689-694
-
-
Hertz, A.1
Laporte, G.2
Mittaz, M.3
Stecke, K.4
-
10
-
-
0024116476
-
Fast mounting system for jigs and fixtures
-
[CSA]
-
Hoffman, E. (1988) Fast mounting system for jigs and fixtures Modern Machine Shop, 61(6), pp. 78-83. [CSA]
-
(1988)
Modern Machine Shop
, vol.61
, Issue.6
, pp. 78-83
-
-
Hoffman, E.1
-
11
-
-
0032624321
-
Setup and fixture planning in automated process planning systems
-
[CSA] [CROSSREF]
-
Joneja, A. and Chang, T. (1999) Setup and fixture planning in automated process planning systems IIE Transactions, 7, pp. 653-665. [CSA] [CROSSREF]
-
(1999)
IIE Transactions
, vol.7
, pp. 653-665
-
-
Joneja, A.1
Chang, T.2
-
12
-
-
0033099219
-
Real-time operation and tool selection in single stage multifunctional machine systems
-
[CSA] [CROSSREF]
-
Koo, P. and Tanchoco, J. (1999) Real-time operation and tool selection in single stage multifunctional machine systems International Journal of Production Research, 37(5), pp. 1023-1039. [CSA] [CROSSREF]
-
(1999)
International Journal of Production Research
, vol.37
, Issue.5
, pp. 1023-1039
-
-
Koo, P.1
Tanchoco, J.2
-
13
-
-
0025444954
-
Optimal selection of machinable volumes
-
[CSA]
-
Kusiak, A. (1990) Optimal selection of machinable volumes IIE Transactions, 22(2), pp. 151-162. [CSA]
-
(1990)
IIE Transactions
, vol.22
, Issue.2
, pp. 151-162
-
-
Kusiak, A.1
-
14
-
-
0004542855
-
Algorithm for tool placement in an automatic tool change magazine
-
[CSA]
-
Levitin, G. and Rubinovitz, J. (1995) Algorithm for tool placement in an automatic tool change magazine International Journal of Production Research, 33(2), pp. 351-360. [CSA]
-
(1995)
International Journal of Production Research
, vol.33
, Issue.2
, pp. 351-360
-
-
Levitin, G.1
Rubinovitz, J.2
-
15
-
-
0035371898
-
Scheduling of the optimal tool replacement times in a flexible manufacturing system
-
[CSA] [CROSSREF]
-
Liu, P. and Makis, V. and Jardine, A. (2001) Scheduling of the optimal tool replacement times in a flexible manufacturing system IIE Transactions, 33(6), pp. 487-495. [CSA] [CROSSREF]
-
(2001)
IIE Transactions
, vol.33
, Issue.6
, pp. 487-495
-
-
Liu, P.1
Makis, V.2
Jardine, A.3
-
17
-
-
33746441984
-
Quick setup times critical
-
[CSA]
-
Ohm, L. (2000) Quick setup times critical FDM Magazine, 72(15), pp. 82-83. [CSA]
-
(2000)
FDM Magazine
, vol.72
, Issue.15
, pp. 82-83
-
-
Ohm, L.1
-
18
-
-
0024119088
-
Indexing fixtures enhance vertical machining center
-
[CSA]
-
Poling, D. (1998) Indexing fixtures enhance vertical machining center Modern Machine Shop, 61(6), pp. 62-66. [CSA]
-
(1998)
Modern Machine Shop
, vol.61
, Issue.6
, pp. 62-66
-
-
Poling, D.1
-
19
-
-
0002274363
-
Algorithms for the minimization of setups and tool changes in "simply fixturable" components of milling
-
[CSA]
-
Sarma, S. and Wright, P. (1996) Algorithms for the minimization of setups and tool changes in "simply fixturable" components of milling Journal of Manufacturing Systems, 15(2), pp. 95-111. [CSA]
-
(1996)
Journal of Manufacturing Systems
, vol.15
, Issue.2
, pp. 95-111
-
-
Sarma, S.1
Wright, P.2
-
21
-
-
0032364575
-
Process selection and cell assignment in cellular manufacturing using genetic algorithms
-
[CSA] [CROSSREF]
-
Sinriech, D. and Abekasis, M. (1998) Process selection and cell assignment in cellular manufacturing using genetic algorithms Annals of Operations Research, 77, pp. 51-78. [CSA] [CROSSREF]
-
(1998)
Annals of Operations Research
, vol.77
, pp. 51-78
-
-
Sinriech, D.1
Abekasis, M.2
-
22
-
-
0035480394
-
Sequencing, scheduling and tooling single stage multifuncional machines in a small batch environment
-
[CSA] [CROSSREF]
-
Sinriech, D. and Rubinovitz, J. and Milo, D. and Nakbily, G. (2001) Sequencing, scheduling and tooling single stage multifuncional machines in a small batch environment IIE Transactions, 33(10), pp. 897-911. [CSA] [CROSSREF]
-
(2001)
IIE Transactions
, vol.33
, Issue.10
, pp. 897-911
-
-
Sinriech, D.1
Rubinovitz, J.2
Milo, D.3
Nakbily, G.4
-
23
-
-
0242269881
-
Non-identical parallel CNC machine scheduling
-
[CSA] [CROSSREF]
-
Turkcan, A. and Akturk, M. and Storer, R. (2003) Non-identical parallel CNC machine scheduling International Journal of Production Research, 41(10), pp. 2143-2168. [CSA] [CROSSREF]
-
(2003)
International Journal of Production Research
, vol.41
, Issue.10
, pp. 2143-2168
-
-
Turkcan, A.1
Akturk, M.2
Storer, R.3
-
24
-
-
0030192480
-
Setup savings
-
[CSA]
-
Venjara, Y. (1996) Setup savings Manufacturing Engineering, 117(1), pp. 96-102. [CSA]
-
(1996)
Manufacturing Engineering
, vol.117
, Issue.1
, pp. 96-102
-
-
Venjara, Y.1
|