메뉴 건너뛰기




Volumn 34, Issue 1, 2007, Pages 48-69

Scheduling with flexible resources in parallel workcenters to minimize maximum completion time

Author keywords

Dual resource scheduling; Makespan; Maximum completion time; Parallel machines scheduling

Indexed keywords

COMPETITION; HEURISTIC METHODS; PARALLEL PROCESSING SYSTEMS; PROBLEM SOLVING; SCHEDULING;

EID: 33746239345     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cor.2005.02.042     Document Type: Article
Times cited : (26)

References (11)
  • 1
    • 0033080067 scopus 로고    scopus 로고
    • Heuristics for parallel machine flexible resource scheduling problems with unspecified job assignment
    • Daniels R.L., Hua S.Y., and Webster S. Heuristics for parallel machine flexible resource scheduling problems with unspecified job assignment. Computers and Operations Research 26 (1999) 143-155
    • (1999) Computers and Operations Research , vol.26 , pp. 143-155
    • Daniels, R.L.1    Hua, S.Y.2    Webster, S.3
  • 2
    • 0001691215 scopus 로고    scopus 로고
    • Scheduling parallel manufacturing cells with resource flexibility
    • Daniels R.L., Hoopes B.J., and Mazzola J.B. Scheduling parallel manufacturing cells with resource flexibility. Management Science 42 (1996) 1260-1276
    • (1996) Management Science , vol.42 , pp. 1260-1276
    • Daniels, R.L.1    Hoopes, B.J.2    Mazzola, J.B.3
  • 3
    • 0034135525 scopus 로고    scopus 로고
    • A method for scheduling in parallel manufacturing systems with flexible resources
    • Olafsson S., and Shi L. A method for scheduling in parallel manufacturing systems with flexible resources. IIE Transactions 32 (2000) 135-146
    • (2000) IIE Transactions , vol.32 , pp. 135-146
    • Olafsson, S.1    Shi, L.2
  • 4
    • 0242366706 scopus 로고    scopus 로고
    • Scheduling problems for parallel dedicated machines under multiple resource constraints
    • Kellerer H., and Strusevich V.A. Scheduling problems for parallel dedicated machines under multiple resource constraints. Discrete Applied Mathematics 133 1-3 (2004) 45-68
    • (2004) Discrete Applied Mathematics , vol.133 , Issue.1-3 , pp. 45-68
    • Kellerer, H.1    Strusevich, V.A.2
  • 5
    • 0034561557 scopus 로고    scopus 로고
    • The impact of resource flexibility and staffing decisions on cellular and departmental performance
    • Jensen J.B. The impact of resource flexibility and staffing decisions on cellular and departmental performance. European Journal of Operational Research 127 (2000) 279-296
    • (2000) European Journal of Operational Research , vol.127 , pp. 279-296
    • Jensen, J.B.1
  • 7
    • 1842530914 scopus 로고    scopus 로고
    • Makespan minimization on uniform parallel machines with release times
    • Koulamas C., and Kyparisis G. Makespan minimization on uniform parallel machines with release times. European Journal of Operational Research 157 (2004) 262-266
    • (2004) European Journal of Operational Research , vol.157 , pp. 262-266
    • Koulamas, C.1    Kyparisis, G.2
  • 11
    • 0024051185 scopus 로고
    • Multiprocessor scheduling: combining LPT and MULTIFIT
    • Lee C.Y., and Massey J.D. Multiprocessor scheduling: combining LPT and MULTIFIT. Discrete Applied Mathematics 20 (1988) 233-242
    • (1988) Discrete Applied Mathematics , vol.20 , pp. 233-242
    • Lee, C.Y.1    Massey, J.D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.