-
1
-
-
33746243090
-
-
Brauner, N., Finke, G., 1997. Final Results on the One-cycle Conjecture in Robotic Cells. Internal note, Laboratoire LEIBNIZ, Institut IMAG, Grenoble, France.
-
-
-
-
2
-
-
0031272146
-
Cyclic scheduling of identical parts in a robotic cell
-
Crama Y., and van de Klundert J. Cyclic scheduling of identical parts in a robotic cell. Operations Research 45 (1997) 952-965
-
(1997)
Operations Research
, vol.45
, pp. 952-965
-
-
Crama, Y.1
van de Klundert, J.2
-
3
-
-
0002604088
-
Cyclic scheduling in 3-machine robotic flow shops
-
Crama Y., and van de Klundert J. Cyclic scheduling in 3-machine robotic flow shops. Journal of Scheduling 4 (1999) 35-54
-
(1999)
Journal of Scheduling
, vol.4
, pp. 35-54
-
-
Crama, Y.1
van de Klundert, J.2
-
5
-
-
33746243088
-
-
Dawande, M., Geismar, H.N., Sethi, S.P., 2002a. Dominance of cyclic solutions and challenges in the scheduling of robotic cells. Working paper, University of Texas at Dallas, to appear in SIAM Review.
-
-
-
-
7
-
-
33746193683
-
-
Dawande, M., Geismar, H.N., Sethi, S.P., Sriskandarajah, C. 2003. Sequencing and scheduling in robotic cells: Recent developments. Working paper, University of Texas at Dallas, to appear in Journal of Scheduling.
-
-
-
-
9
-
-
0027591340
-
A synthesis of decision models for tool management in automated manufacturing
-
Gray A.E., Seidmann A., and Stecke K.E. A synthesis of decision models for tool management in automated manufacturing. Management Science 39 (1993) 549-567
-
(1993)
Management Science
, vol.39
, pp. 549-567
-
-
Gray, A.E.1
Seidmann, A.2
Stecke, K.E.3
-
10
-
-
0031142587
-
Scheduling in robotic cells: Classification, two and three machine cells
-
Hall N.G., Kamoun H., and Sriskandarajah C. Scheduling in robotic cells: Classification, two and three machine cells. Operations Research 45 (1997) 421-439
-
(1997)
Operations Research
, vol.45
, pp. 421-439
-
-
Hall, N.G.1
Kamoun, H.2
Sriskandarajah, C.3
-
12
-
-
0027569359
-
Robot task scheduling in a flexible manufacturing cell
-
King R.E., Hodgson T.J., and Chafee F.C. Robot task scheduling in a flexible manufacturing cell. IIE Transactions 25 (1993) 80-87
-
(1993)
IIE Transactions
, vol.25
, pp. 80-87
-
-
King, R.E.1
Hodgson, T.J.2
Chafee, F.C.3
-
13
-
-
0026124166
-
Automated two-machine flowshop scheduling: A solvable case
-
Kise H., Shioyama T., and Ibaraki T. Automated two-machine flowshop scheduling: A solvable case. IIE Transactions 23 (1991) 10-16
-
(1991)
IIE Transactions
, vol.23
, pp. 10-16
-
-
Kise, H.1
Shioyama, T.2
Ibaraki, T.3
-
15
-
-
0000222016
-
Sequencing of parts and robot moves in a robotic cell
-
Sethi S.P., Sriskandarajah C., Sorger G., Blazewicz J., and Kubiak W. Sequencing of parts and robot moves in a robotic cell. International Journal of Flexible Manufacturing Systems 4 (1992) 331-358
-
(1992)
International Journal of Flexible Manufacturing Systems
, vol.4
, pp. 331-358
-
-
Sethi, S.P.1
Sriskandarajah, C.2
Sorger, G.3
Blazewicz, J.4
Kubiak, W.5
|