-
1
-
-
0037118759
-
An approach to solve the minimum expected makespan flow-shop problem subject to breakdowns
-
Alcaide D, Rodriguez-Gonzalez A, Sicilia J (2002) An approach to solve the minimum expected makespan flow-shop problem subject to breakdowns. Europ J Oper Res 140(2):384-398
-
(2002)
Europ J Oper Res
, vol.140
, Issue.2
, pp. 384-398
-
-
Alcaide, D.1
Rodriguez-Gonzalez, A.2
Sicilia, J.3
-
2
-
-
0005782864
-
A tabu search algorithm for the open shop problem
-
Alcaide D, Sicilia J, Vigo D (1997) A tabu search algorithm for the open shop problem. Top 5(2):283-296
-
(1997)
Top
, vol.5
, Issue.2
, pp. 283-296
-
-
Alcaide, D.1
Sicilia, J.2
Vigo, D.3
-
3
-
-
2042534906
-
Optimal policies for a deterministic two-machine semi-ordered flowshop with maximum lateness objective
-
Allahverdi A (1994) Optimal policies for a deterministic two-machine semi-ordered flowshop with maximum lateness objective. Int Trans Oper Res 6:47-54
-
(1994)
Int Trans Oper Res
, vol.6
, pp. 47-54
-
-
Allahverdi, A.1
-
4
-
-
0029343965
-
Two-stage production scheduling with separate setup times and stochastic breakdowns
-
Allah verdi A (1995) Two-stage production scheduling with separate setup times and stochastic breakdowns. J Oper Res Soc 46:896-904
-
(1995)
J Oper Res Soc
, vol.46
, pp. 896-904
-
-
Allah Verdi, A.1
-
5
-
-
0030270129
-
Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness
-
Allahverdi A (1996) Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness. Comp Oper Res 23:909-916
-
(1996)
Comp Oper Res
, vol.23
, pp. 909-916
-
-
Allahverdi, A.1
-
6
-
-
0031258858
-
Scheduling in stochastic flowshops with independent setup, processing, and removal times
-
Allahverdi A (1997) Scheduling in stochastic flowshops with independent setup, processing, and removal times. Comp Oper Res 24:955-960
-
(1997)
Comp Oper Res
, vol.24
, pp. 955-960
-
-
Allahverdi, A.1
-
7
-
-
0033079039
-
Stochastically minimizing total flowtime in flowshops with no waiting space
-
Allahverdi A (1999) Stochastically minimizing total flowtime in flowshops with no waiting space. Europ J Oper Res 113:101-112
-
(1999)
Europ J Oper Res
, vol.113
, pp. 101-112
-
-
Allahverdi, A.1
-
8
-
-
38149147609
-
Two-machine ordered flowshop scheduling under random breakdowns
-
Allahverdi A, Mittenthal J (1994a) Two-machine ordered flowshop scheduling under random breakdowns. Math Comp Model 20:9-17
-
(1994)
Math Comp Model
, vol.20
, pp. 9-17
-
-
Allahverdi, A.1
Mittenthal, J.2
-
9
-
-
0028481410
-
Scheduling on m parallel machines subject to random breakdowns to minimize expected mean flowtime
-
Allahverdi A, Mittenthal J (1994b) Scheduling on m parallel machines subject to random breakdowns to minimize expected mean flowtime. Naval Res Logist 41:677-682
-
(1994)
Naval Res Logist
, vol.41
, pp. 677-682
-
-
Allahverdi, A.1
Mittenthal, J.2
-
10
-
-
0029632622
-
Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective function
-
Allahverdi A, Mittenthal J (1995) Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective function. Europ J Oper Res 81:376-387
-
(1995)
Europ J Oper Res
, vol.81
, pp. 376-387
-
-
Allahverdi, A.1
Mittenthal, J.2
-
11
-
-
0347834986
-
Dual criteria scheduling on a two-machine flowshop subject to random breakdowns
-
Allahverdi A, Mittenthal J (1998) Dual criteria scheduling on a two-machine flowshop subject to random breakdowns. Int Trans Oper Res 5:317-324
-
(1998)
Int Trans Oper Res
, vol.5
, pp. 317-324
-
-
Allahverdi, A.1
Mittenthal, J.2
-
12
-
-
0035309165
-
Stochastic proportionate flowshop scheduling with setups
-
Allahverdi A, Savsar M (2001) Stochastic proportionate flowshop scheduling with setups. Comp Ind Eng 39:357-369
-
(2001)
Comp Ind Eng
, vol.39
, pp. 357-369
-
-
Allahverdi, A.1
Savsar, M.2
-
13
-
-
0042629519
-
Stochastic machine dominance in flowshops
-
Allahverdi A, Tatari MF (1997) Stochastic machine dominance in flowshops. Comp Ind Eng 32:735-741
-
(1997)
Comp Ind Eng
, vol.32
, pp. 735-741
-
-
Allahverdi, A.1
Tatari, M.F.2
-
14
-
-
0001371924
-
Machine scheduling
-
Aarts E, Lenstra JK (eds) Wiley, New York
-
Anderson EJ, Glass CA, Potts CN (1997) Machine scheduling. In: Aarts E, Lenstra JK (eds) Local search in combinatorial optimization, Ch. 11. Wiley, New York
-
(1997)
Local Search in Combinatorial Optimization, Ch.
, vol.11
-
-
Anderson, E.J.1
Glass, C.A.2
Potts, C.N.3
-
16
-
-
0004048738
-
-
Springer-Verlag, New York
-
Blazewicz J, Ecker K, Pesch E, Schmidt G, Weglarz J (2001) Scheduling computer and manufacturing processes. Springer-Verlag, New York
-
(2001)
Scheduling Computer and Manufacturing Processes
-
-
Blazewicz, J.1
Ecker, K.2
Pesch, E.3
Schmidt, G.4
Weglarz, J.5
-
18
-
-
0032654777
-
Stochastic scheduling on parallel machines subject to random breakdowns to minimize expected costs for earliness and tardy jobs
-
Cai X, Zhou S (1999) Stochastic scheduling on parallel machines subject to random breakdowns to minimize expected costs for earliness and tardy jobs. Oper Res 47(3):422-437
-
(1999)
Oper Res
, vol.47
, Issue.3
, pp. 422-437
-
-
Cai, X.1
Zhou, S.2
-
19
-
-
33745694003
-
Indus oper res
-
Prentice-Hall, New Jersey French S (1982) An Introduction to the mathematics of the job shop, Wiley, New York
-
Fabrycky WJ, Ghare PM, Torgersen PE (1972) Indus oper res. Prentice-Hall, New Jersey French S (1982) Sequencing and scheduling. An Introduction to the mathematics of the job shop, Wiley, New York
-
(1972)
Sequencing and Scheduling
-
-
Fabrycky, W.J.1
Ghare, P.M.2
Torgersen, P.E.3
-
20
-
-
0017012325
-
Open shop scheduling to minimize finish time
-
Gonzalez T, Sahni S (1976) Open shop scheduling to minimize finish time. J Assoc Comp Mach 23:665-679
-
(1976)
J Assoc Comp Mach
, vol.23
, pp. 665-679
-
-
Gonzalez, T.1
Sahni, S.2
-
21
-
-
0017918132
-
Flowshop and jobshop schedules: Complexity and approximation
-
Gonzalez T, Sahni S (1978) Flowshop and jobshop schedules: Complexity and approximation. Oper Res 26(1):665-679
-
(1978)
Oper Res
, vol.26
, Issue.1
, pp. 665-679
-
-
Gonzalez, T.1
Sahni, S.2
-
22
-
-
74849101820
-
Optimization and approximation in deterministic sequencing and scheduling: A survey
-
Graham RL, Lawler EL, Lenstra JK, Rinnooy Kan AHG (1979) Optimization and approximation in deterministic sequencing and scheduling: a survey. Ann Discr Math 5:287-326
-
(1979)
Ann Discr Math
, vol.5
, pp. 287-326
-
-
Graham, R.L.1
Lawler, E.L.2
Lenstra, J.K.3
Ahg, R.K.4
-
24
-
-
0019525293
-
Minimizing maximum lateness in a two machine open shop
-
Erratum. Math Oper Res 7:635
-
Lawler EL, Lenstra JK, Rinnooy-Kan AHG (1981) Minimizing maximum lateness in a two machine open shop. Math of Oper res 6:153-158. Erratum. Math Oper Res 7:635
-
(1981)
Math of Oper Res
, vol.6
, pp. 153-158
-
-
Lawler, E.L.1
Lenstra, J.K.2
Ahg, R.-K.3
-
25
-
-
0007992513
-
Recent developments in deterministic sequencing and scheduling: A survey
-
Dempster MAH, Lenstra JK, Rinnooy Kan AHG (eds) NATO Advanced Study Institute Series. Serie C. Reidel Publishing Company, Dordrecht, Holland
-
Lawler EL, Lenstra JK, Rinnooy-Kan AHG (1982) Recent developments in deterministic sequencing and scheduling: A survey. In: Dempster MAH, Lenstra JK, Rinnooy Kan AHG (eds) Deterministic and stochastic scheduling, NATO Advanced Study Institute Series. Serie C. Reidel Publishing Company, Dordrecht, Holland
-
(1982)
Deterministic and Stochastic Scheduling
-
-
Lawler, E.L.1
Lenstra, J.K.2
Ahg, R.-K.3
-
26
-
-
0345901561
-
Sequencing and scheduling : Algorithms and complexity
-
Graves SC, Rinnooy Kan AHG, Zipkin PH (eds) Logistics of Production and Inventory, Ch. 9. North Holland, Amsterdam, The Netherlands
-
Lawler EL, Lenstra JK, Rinnooy Kan AHG, Shmoys DB (1993) Sequencing and scheduling : Algorithms and complexity, In: Graves SC, Rinnooy Kan AHG, Zipkin PH (eds) Handbooks in operations research and management science, vol. 4, Logistics of Production and Inventory, Ch. 9. North Holland, Amsterdam, The Netherlands
-
(1993)
Handbooks in Operations Research and Management Science
, vol.4
-
-
Lawler, E.L.1
Lenstra, J.K.2
Ahg, R.K.3
Shmoys, D.B.4
-
27
-
-
0008819041
-
Stochastic scheduling on a single machine subject to multiple breakdowns according to different probabilities
-
Li W, Cao J (1995) Stochastic scheduling on a single machine subject to multiple breakdowns according to different probabilities. Oper Res Lett 18:81-91
-
(1995)
Oper Res Lett
, vol.18
, pp. 81-91
-
-
Li, W.1
Cao, J.2
-
28
-
-
0019710683
-
A note on the two-machine job shop with exponential processing time
-
Pinedo ML (1981) A note on the two-machine job shop with exponential processing time. Nav Res Logist Quart 28:693-696
-
(1981)
Nav Res Logist Quart
, vol.28
, pp. 693-696
-
-
Pinedo, M.L.1
-
30
-
-
0002472057
-
A note on stochastic scheduling on a single machine subject to breakdowns and repair
-
Pinedo ML, Rammouz E (1988) A note on stochastic scheduling on a single machine subject to breakdowns and repair. Probab Eng Inform Sci 2:41-49
-
(1988)
Probab Eng Inform Sci
, vol.2
, pp. 41-49
-
-
Pinedo, M.L.1
Rammouz, E.2
-
31
-
-
0008819773
-
Minimizing expected makespan in stochastic open shops
-
Pinedo ML, Ross SM (1982) Minimizing expected makespan in stochastic open shops. Adv Appl Probab 14:898-911
-
(1982)
Adv Appl Probab
, vol.14
, pp. 898-911
-
-
Pinedo, M.L.1
Ross, S.M.2
-
32
-
-
0008824985
-
Stochastic shop scheduling: A survey
-
Dempster MAH, Lenstra JK, Rinnooy Kan AHG (eds) NATO Advanced Study Institute Series. Serie C, Reidel Publishing Company, Dordrecht, Holland
-
Pinedo ML, Schrage L (1982) Stochastic shop scheduling: A survey. In: Dempster MAH, Lenstra JK, Rinnooy Kan AHG (eds) Deterministic and stochastic scheduling, NATO Advanced Study Institute Series. Serie C, Reidel Publishing Company, Dordrecht, Holland
-
(1982)
Deterministic and Stochastic Scheduling
-
-
Pinedo, M.L.1
Schrage, L.2
-
33
-
-
84982073995
-
Inequalities for stochastic flow shops and job shops
-
Pinedo ML, Wie SH (1986) Inequalities for stochastic flow shops and job shops. Appl Stoch Mod Data Anal 2:61-69
-
(1986)
Appl Stoch Mod Data Anal
, vol.2
, pp. 61-69
-
-
Pinedo, M.L.1
Wie, S.H.2
-
34
-
-
0008861641
-
Multiserver stochastic scheduling
-
Dempster MAH, Lenstra JK Rinnooy Kan AHG, (eds), NATO Advanced Study Institute Series. Serie C, Reidel Publishing Company, Dordrecht, Holland
-
Weiss G (1982) Multiserver stochastic scheduling. In: Dempster MAH, Lenstra JK Rinnooy Kan AHG, (eds), Deterministic and stochastic scheduling, NATO Advanced Study Institute Series. Serie C, Reidel Publishing Company, Dordrecht, Holland
-
(1982)
Deterministic and Stochastic Scheduling
-
-
Weiss, G.1
-
35
-
-
0002394637
-
A tutorial in stochastic scheduling
-
P. Chretienne, E.G. Coffman, J.K. Lenstra, Z. Liu (eds) Wiley, New York
-
Weiss G (1995) A tutorial in stochastic scheduling. In: P. Chretienne, E.G. Coffman, J.K. Lenstra, Z. Liu (eds) Scheduling theory and its applications. Wiley, New York
-
(1995)
Scheduling Theory and Its Applications.
-
-
Weiss, G.1
|