메뉴 건너뛰기




Volumn 103, Issue 1, 2006, Pages 401-419

Demand forecast accuracy and performance of inventory policies under multi-level rolling schedule environments

Author keywords

Forecast errors; Heuristics; Material requirements planning; Multi level lot sizing; Rolling schedule

Indexed keywords

COST EFFECTIVENESS; ERROR ANALYSIS; HEURISTIC METHODS; MATERIALS HANDLING; SCHEDULING; STRATEGIC PLANNING; TECHNOLOGICAL FORECASTING;

EID: 33745140214     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2005.10.003     Document Type: Article
Times cited : (19)

References (28)
  • 1
    • 0022076491 scopus 로고
    • A variable demand lot-sizing procedure and a comparison with various well known strategies
    • Aucamp D. A variable demand lot-sizing procedure and a comparison with various well known strategies. Production and Inventory Management 2 (1985) 1-20
    • (1985) Production and Inventory Management , vol.2 , pp. 1-20
    • Aucamp, D.1
  • 2
    • 33745173298 scopus 로고    scopus 로고
    • Bahl, H.C., Boykin, R., 2000. Manufacturing resource planning concepts in enterprise resource planning software. Proceedings of the 12th Annual CSU-POM Conference, California State University, Sacramento.
  • 3
    • 84989444315 scopus 로고
    • Heuristic lot-sizing performance in a rolling-schedule environment
    • Blackburn J., and Millen R. Heuristic lot-sizing performance in a rolling-schedule environment. Decision Sciences 11 (1980) 691-701
    • (1980) Decision Sciences , vol.11 , pp. 691-701
    • Blackburn, J.1    Millen, R.2
  • 4
    • 0019913634 scopus 로고
    • Improved heuristics for mutli-stage requirements planning systems
    • Blackburn J.D., and Millen R.A. Improved heuristics for mutli-stage requirements planning systems. Management Science 28 (1982) 44-56
    • (1982) Management Science , vol.28 , pp. 44-56
    • Blackburn, J.D.1    Millen, R.A.2
  • 5
    • 84985807771 scopus 로고
    • Replenishment analysis in distribution requirements planning
    • Bookbinder J., and Heath D. Replenishment analysis in distribution requirements planning. Decision Sciences 19 (1988) 477-489
    • (1988) Decision Sciences , vol.19 , pp. 477-489
    • Bookbinder, J.1    Heath, D.2
  • 6
    • 38249038883 scopus 로고
    • Production lot sizing for deterministic rolling schedules
    • Bookbinder J., and H'ng B. Production lot sizing for deterministic rolling schedules. Journal of Operations Management 3 (1986) 349-362
    • (1986) Journal of Operations Management , vol.3 , pp. 349-362
    • Bookbinder, J.1    H'ng, B.2
  • 7
  • 8
    • 84989491970 scopus 로고
    • The effectiveness of extending the horizon in rolling production scheduling
    • Carlson R., Beckman S., and Kropp D. The effectiveness of extending the horizon in rolling production scheduling. Decision Sciences 13 (1982) 129-146
    • (1982) Decision Sciences , vol.13 , pp. 129-146
    • Carlson, R.1    Beckman, S.2    Kropp, D.3
  • 10
    • 84989457223 scopus 로고
    • Cost increases due to demand uncertainty in mrp lot sizing
    • De Bodt M.A., and Van Wassenhove L.N. Cost increases due to demand uncertainty in mrp lot sizing. Decision Sciences 14 (1983) 345-362
    • (1983) Decision Sciences , vol.14 , pp. 345-362
    • De Bodt, M.A.1    Van Wassenhove, L.N.2
  • 12
    • 1642337072 scopus 로고    scopus 로고
    • Dellaert, N., Jeunet, J., 2003. Controlling multi-level production in a rolling-schedule environment. International Journal of Production Economics, 113-121.
  • 13
    • 33745144127 scopus 로고    scopus 로고
    • Fildes, R., Kingsman, B., 2005. Demand uncertainty and lot sizing in manufacturing systems: The effects of forecasting errors and mis-specification. Technical Report, Lancaster University Management School.
  • 14
    • 0012597342 scopus 로고
    • Multi-stage lot sizing: An iterative procedure
    • Schwarz L.B. (Ed), North-Holland, Amsterdam
    • Graves S.C. Multi-stage lot sizing: An iterative procedure. In: Schwarz L.B. (Ed). Multi-Level Production/Inventory Control Systems (1981), North-Holland, Amsterdam
    • (1981) Multi-Level Production/Inventory Control Systems
    • Graves, S.C.1
  • 15
    • 0026852429 scopus 로고
    • Comparative analysis of lot-sizing models for multi-stage systems: A simulation study
    • Gupta Y., Keung Y., and Gupta M. Comparative analysis of lot-sizing models for multi-stage systems: A simulation study. International Journal of Production Research 30 (1992) 695-716
    • (1992) International Journal of Production Research , vol.30 , pp. 695-716
    • Gupta, Y.1    Keung, Y.2    Gupta, M.3
  • 16
    • 0003066666 scopus 로고
    • Multi-stage lot-sizing for general production systems
    • Axsäter S., Schneeweiss C., and Silver E. (Eds), Springer, Berlin
    • Heinrich C.E., and Schneeweiss C. Multi-stage lot-sizing for general production systems. In: Axsäter S., Schneeweiss C., and Silver E. (Eds). Multi-Stage Production Planning and Inventory Control (1986), Springer, Berlin 150-181
    • (1986) Multi-Stage Production Planning and Inventory Control , pp. 150-181
    • Heinrich, C.E.1    Schneeweiss, C.2
  • 17
    • 33745182678 scopus 로고    scopus 로고
    • Kimms, A., 1997. Multi-level lot-sizing and scheduling methods for capacitated, dynamic and deterministic models. Physica Verlag Series on Production and Logistics. Springer, Berlin.
  • 19
    • 0001396613 scopus 로고
    • Planning horizons for the dynamic lot size model: Zabel vs protective procedures and computational results
    • Lundin R., and Morton T. Planning horizons for the dynamic lot size model: Zabel vs protective procedures and computational results. Operations Research 23 (1975) 711-734
    • (1975) Operations Research , vol.23 , pp. 711-734
    • Lundin, R.1    Morton, T.2
  • 20
    • 0027568692 scopus 로고
    • The relative significance of forecast errors in multistage manufacturing
    • Ritzman L.P., and King B.E. The relative significance of forecast errors in multistage manufacturing. Journal of Operations Management 11 1 (1993) 51-65
    • (1993) Journal of Operations Management , vol.11 , Issue.1 , pp. 51-65
    • Ritzman, L.P.1    King, B.E.2
  • 21
    • 0027539456 scopus 로고
    • Horizon extension for rolling production schedules: Length and accuracy requirements
    • Russel R., and Urban T. Horizon extension for rolling production schedules: Length and accuracy requirements. International Journal of Production Economics 29 (1993) 111-122
    • (1993) International Journal of Production Economics , vol.29 , pp. 111-122
    • Russel, R.1    Urban, T.2
  • 22
    • 63349089352 scopus 로고
    • The response of a concerned management scientist
    • Silver E.A. The response of a concerned management scientist. Production and Inventory Management 17 (1976) 108-112
    • (1976) Production and Inventory Management , vol.17 , pp. 108-112
    • Silver, E.A.1
  • 23
    • 0002657699 scopus 로고
    • A heuristic for selecting lot size requirements for the case of a deterministic time-varying demand rate and discrete opportunities for replenishment
    • Silver E.A., and Meal H.C. A heuristic for selecting lot size requirements for the case of a deterministic time-varying demand rate and discrete opportunities for replenishment. Production and Inventory Management 14 (1973) 64-74
    • (1973) Production and Inventory Management , vol.14 , pp. 64-74
    • Silver, E.A.1    Meal, H.C.2
  • 24
    • 0033116507 scopus 로고    scopus 로고
    • Multiple level production in rolling horizon assembly environments
    • Simpson N. Multiple level production in rolling horizon assembly environments. European Journal of Operational Research 114 (1999) 15-28
    • (1999) European Journal of Operational Research , vol.114 , pp. 15-28
    • Simpson, N.1
  • 25
    • 0033886730 scopus 로고    scopus 로고
    • Improved rolling schedules for the dynamic single-level lot-sizing problem
    • Stadtler H. Improved rolling schedules for the dynamic single-level lot-sizing problem. Management Science 46 (2000) 318-326
    • (2000) Management Science , vol.46 , pp. 318-326
    • Stadtler, H.1
  • 26
    • 0002661308 scopus 로고
    • The performance of a simple incremental lot-sizing rule in a multilevel inventory environment
    • Veral E.A., and Laforge R.L. The performance of a simple incremental lot-sizing rule in a multilevel inventory environment. Decision Sciences 16 (1985) 57-72
    • (1985) Decision Sciences , vol.16 , pp. 57-72
    • Veral, E.A.1    Laforge, R.L.2
  • 27
    • 0001962762 scopus 로고
    • Dynamic version of the economic lot size model
    • Wagner H.M., and Whitin T.M. Dynamic version of the economic lot size model. Management Science 5 (1958) 89-96
    • (1958) Management Science , vol.5 , pp. 89-96
    • Wagner, H.M.1    Whitin, T.M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.