-
1
-
-
0022076491
-
A variable demand lot-sizing procedure and a comparison with various well known strategies
-
Aucamp D. A variable demand lot-sizing procedure and a comparison with various well known strategies. Production and Inventory Management 2 (1985) 1-20
-
(1985)
Production and Inventory Management
, vol.2
, pp. 1-20
-
-
Aucamp, D.1
-
2
-
-
33745173298
-
-
Bahl, H.C., Boykin, R., 2000. Manufacturing resource planning concepts in enterprise resource planning software. Proceedings of the 12th Annual CSU-POM Conference, California State University, Sacramento.
-
-
-
-
3
-
-
84989444315
-
Heuristic lot-sizing performance in a rolling-schedule environment
-
Blackburn J., and Millen R. Heuristic lot-sizing performance in a rolling-schedule environment. Decision Sciences 11 (1980) 691-701
-
(1980)
Decision Sciences
, vol.11
, pp. 691-701
-
-
Blackburn, J.1
Millen, R.2
-
4
-
-
0019913634
-
Improved heuristics for mutli-stage requirements planning systems
-
Blackburn J.D., and Millen R.A. Improved heuristics for mutli-stage requirements planning systems. Management Science 28 (1982) 44-56
-
(1982)
Management Science
, vol.28
, pp. 44-56
-
-
Blackburn, J.D.1
Millen, R.A.2
-
5
-
-
84985807771
-
Replenishment analysis in distribution requirements planning
-
Bookbinder J., and Heath D. Replenishment analysis in distribution requirements planning. Decision Sciences 19 (1988) 477-489
-
(1988)
Decision Sciences
, vol.19
, pp. 477-489
-
-
Bookbinder, J.1
Heath, D.2
-
6
-
-
38249038883
-
Production lot sizing for deterministic rolling schedules
-
Bookbinder J., and H'ng B. Production lot sizing for deterministic rolling schedules. Journal of Operations Management 3 (1986) 349-362
-
(1986)
Journal of Operations Management
, vol.3
, pp. 349-362
-
-
Bookbinder, J.1
H'ng, B.2
-
8
-
-
84989491970
-
The effectiveness of extending the horizon in rolling production scheduling
-
Carlson R., Beckman S., and Kropp D. The effectiveness of extending the horizon in rolling production scheduling. Decision Sciences 13 (1982) 129-146
-
(1982)
Decision Sciences
, vol.13
, pp. 129-146
-
-
Carlson, R.1
Beckman, S.2
Kropp, D.3
-
10
-
-
84989457223
-
Cost increases due to demand uncertainty in mrp lot sizing
-
De Bodt M.A., and Van Wassenhove L.N. Cost increases due to demand uncertainty in mrp lot sizing. Decision Sciences 14 (1983) 345-362
-
(1983)
Decision Sciences
, vol.14
, pp. 345-362
-
-
De Bodt, M.A.1
Van Wassenhove, L.N.2
-
12
-
-
1642337072
-
-
Dellaert, N., Jeunet, J., 2003. Controlling multi-level production in a rolling-schedule environment. International Journal of Production Economics, 113-121.
-
-
-
-
13
-
-
33745144127
-
-
Fildes, R., Kingsman, B., 2005. Demand uncertainty and lot sizing in manufacturing systems: The effects of forecasting errors and mis-specification. Technical Report, Lancaster University Management School.
-
-
-
-
14
-
-
0012597342
-
Multi-stage lot sizing: An iterative procedure
-
Schwarz L.B. (Ed), North-Holland, Amsterdam
-
Graves S.C. Multi-stage lot sizing: An iterative procedure. In: Schwarz L.B. (Ed). Multi-Level Production/Inventory Control Systems (1981), North-Holland, Amsterdam
-
(1981)
Multi-Level Production/Inventory Control Systems
-
-
Graves, S.C.1
-
15
-
-
0026852429
-
Comparative analysis of lot-sizing models for multi-stage systems: A simulation study
-
Gupta Y., Keung Y., and Gupta M. Comparative analysis of lot-sizing models for multi-stage systems: A simulation study. International Journal of Production Research 30 (1992) 695-716
-
(1992)
International Journal of Production Research
, vol.30
, pp. 695-716
-
-
Gupta, Y.1
Keung, Y.2
Gupta, M.3
-
16
-
-
0003066666
-
Multi-stage lot-sizing for general production systems
-
Axsäter S., Schneeweiss C., and Silver E. (Eds), Springer, Berlin
-
Heinrich C.E., and Schneeweiss C. Multi-stage lot-sizing for general production systems. In: Axsäter S., Schneeweiss C., and Silver E. (Eds). Multi-Stage Production Planning and Inventory Control (1986), Springer, Berlin 150-181
-
(1986)
Multi-Stage Production Planning and Inventory Control
, pp. 150-181
-
-
Heinrich, C.E.1
Schneeweiss, C.2
-
17
-
-
33745182678
-
-
Kimms, A., 1997. Multi-level lot-sizing and scheduling methods for capacitated, dynamic and deterministic models. Physica Verlag Series on Production and Logistics. Springer, Berlin.
-
-
-
-
19
-
-
0001396613
-
Planning horizons for the dynamic lot size model: Zabel vs protective procedures and computational results
-
Lundin R., and Morton T. Planning horizons for the dynamic lot size model: Zabel vs protective procedures and computational results. Operations Research 23 (1975) 711-734
-
(1975)
Operations Research
, vol.23
, pp. 711-734
-
-
Lundin, R.1
Morton, T.2
-
20
-
-
0027568692
-
The relative significance of forecast errors in multistage manufacturing
-
Ritzman L.P., and King B.E. The relative significance of forecast errors in multistage manufacturing. Journal of Operations Management 11 1 (1993) 51-65
-
(1993)
Journal of Operations Management
, vol.11
, Issue.1
, pp. 51-65
-
-
Ritzman, L.P.1
King, B.E.2
-
21
-
-
0027539456
-
Horizon extension for rolling production schedules: Length and accuracy requirements
-
Russel R., and Urban T. Horizon extension for rolling production schedules: Length and accuracy requirements. International Journal of Production Economics 29 (1993) 111-122
-
(1993)
International Journal of Production Economics
, vol.29
, pp. 111-122
-
-
Russel, R.1
Urban, T.2
-
22
-
-
63349089352
-
The response of a concerned management scientist
-
Silver E.A. The response of a concerned management scientist. Production and Inventory Management 17 (1976) 108-112
-
(1976)
Production and Inventory Management
, vol.17
, pp. 108-112
-
-
Silver, E.A.1
-
23
-
-
0002657699
-
A heuristic for selecting lot size requirements for the case of a deterministic time-varying demand rate and discrete opportunities for replenishment
-
Silver E.A., and Meal H.C. A heuristic for selecting lot size requirements for the case of a deterministic time-varying demand rate and discrete opportunities for replenishment. Production and Inventory Management 14 (1973) 64-74
-
(1973)
Production and Inventory Management
, vol.14
, pp. 64-74
-
-
Silver, E.A.1
Meal, H.C.2
-
24
-
-
0033116507
-
Multiple level production in rolling horizon assembly environments
-
Simpson N. Multiple level production in rolling horizon assembly environments. European Journal of Operational Research 114 (1999) 15-28
-
(1999)
European Journal of Operational Research
, vol.114
, pp. 15-28
-
-
Simpson, N.1
-
25
-
-
0033886730
-
Improved rolling schedules for the dynamic single-level lot-sizing problem
-
Stadtler H. Improved rolling schedules for the dynamic single-level lot-sizing problem. Management Science 46 (2000) 318-326
-
(2000)
Management Science
, vol.46
, pp. 318-326
-
-
Stadtler, H.1
-
26
-
-
0002661308
-
The performance of a simple incremental lot-sizing rule in a multilevel inventory environment
-
Veral E.A., and Laforge R.L. The performance of a simple incremental lot-sizing rule in a multilevel inventory environment. Decision Sciences 16 (1985) 57-72
-
(1985)
Decision Sciences
, vol.16
, pp. 57-72
-
-
Veral, E.A.1
Laforge, R.L.2
-
27
-
-
0001962762
-
Dynamic version of the economic lot size model
-
Wagner H.M., and Whitin T.M. Dynamic version of the economic lot size model. Management Science 5 (1958) 89-96
-
(1958)
Management Science
, vol.5
, pp. 89-96
-
-
Wagner, H.M.1
Whitin, T.M.2
|