-
1
-
-
0022076491
-
A variable demand lot-sizing procedure and a comparison with various well known strategies
-
Aucamp D.C. A variable demand lot-sizing procedure and a comparison with various well known strategies. Production and Inventory Management. 2:1985;1-20.
-
(1985)
Production and Inventory Management
, vol.2
, pp. 1-20
-
-
Aucamp, D.C.1
-
2
-
-
84989493292
-
An experimental study of the effectiveness of rolling schedules in production planning
-
Baker K.R. An experimental study of the effectiveness of rolling schedules in production planning. Decision Sciences. 8:1977;19-27.
-
(1977)
Decision Sciences
, vol.8
, pp. 19-27
-
-
Baker, K.R.1
-
3
-
-
84989444315
-
Heuristic lot-sizing performance in a rolling-schedule environment
-
Blackburn J.D., Millen R.A. Heuristic lot-sizing performance in a rolling-schedule environment. Decision Sciences. 11:1980;691-701.
-
(1980)
Decision Sciences
, vol.11
, pp. 691-701
-
-
Blackburn, J.D.1
Millen, R.A.2
-
4
-
-
0019913634
-
Improved heuristics for multi-stage requirements planning systems
-
Blackburn J.D., Millen R.A. Improved heuristics for multi-stage requirements planning systems. Management Science. 28:1982;44-56.
-
(1982)
Management Science
, vol.28
, pp. 44-56
-
-
Blackburn, J.D.1
Millen, R.A.2
-
6
-
-
84989491970
-
The effectiveness of extending the horizon in rolling production scheduling
-
Carlson R.C., Beckman S.L., Kropp D.H. The effectiveness of extending the horizon in rolling production scheduling. Decision Sciences. 13:1982;129-146.
-
(1982)
Decision Sciences
, vol.13
, pp. 129-146
-
-
Carlson, R.C.1
Beckman, S.L.2
Kropp, D.H.3
-
7
-
-
84989463359
-
A note on dynamic lot sizing in a rolling-horizon environment
-
Chand S. A note on dynamic lot sizing in a rolling-horizon environment. Decision Sciences. 13:1982;113-119.
-
(1982)
Decision Sciences
, vol.13
, pp. 113-119
-
-
Chand, S.1
-
8
-
-
0020704199
-
Rolling horizon procedures for the facilities in series inventory model with nested schedules
-
Chand S. Rolling horizon procedures for the facilities in series inventory model with nested schedules. Management Science. 29:1983;237-249.
-
(1983)
Management Science
, vol.29
, pp. 237-249
-
-
Chand, S.1
-
10
-
-
1642313407
-
Multi-level lot-sizing in a rolling schedule environment
-
Sevilla
-
Dellaert, N.P., Jeunet, J., 2000. Multi-level lot-sizing in a rolling schedule environment, Paper presented at POMS Conference, Sevilla.
-
(2000)
POMS Conference
-
-
Dellaert, N.P.1
Jeunet, J.2
-
12
-
-
0018296191
-
A lot sizing rule for time-phased component demand
-
Groff G.K. A lot sizing rule for time-phased component demand. Production and Inventory Management. 20:1979;47-53.
-
(1979)
Production and Inventory Management
, vol.20
, pp. 47-53
-
-
Groff, G.K.1
-
14
-
-
0003066666
-
Multi-stage lot-sizing for general production systems
-
Axsäter, S., Schneeweiss, C., Silver, E. (Eds.), Multi-Stage Production Planning and Control, Springer, Berlin
-
Heinrich, C.E., Schneeweiss, C., 1986. Multi-stage lot-sizing for general production systems. In: Axsäter, S., Schneeweiss, C., Silver, E. (Eds.), Multi-Stage Production Planning and Control, Lecture Notes in Economics and Mathematical Systems, Springer, Berlin, pp. 150-181.
-
(1986)
Lecture Notes in Economics and Mathematical Systems
, pp. 150-181
-
-
Heinrich, C.E.1
Schneeweiss, C.2
-
16
-
-
0027539456
-
Horizon extension for rolling production schedules: Length and accuracy requirements
-
Russel R.A., Urban T.L. Horizon extension for rolling production schedules. Length and accuracy requirements International Journal of Production Economics. 29:1993;111-122.
-
(1993)
International Journal of Production Economics
, vol.29
, pp. 111-122
-
-
Russel, R.A.1
Urban, T.L.2
-
17
-
-
0002657699
-
A heuristic for selecting lot size requirements for the case of a deterministic time-varying demand rate and discrete opportunities for replenishment
-
Silver E.A., Meal H.C. A heuristic for selecting lot size requirements for the case of a deterministic time-varying demand rate and discrete opportunities for replenishment. Production and Inventory Management. 14:1973;64-74.
-
(1973)
Production and Inventory Management
, vol.14
, pp. 64-74
-
-
Silver, E.A.1
Meal, H.C.2
-
18
-
-
0033116507
-
Multiple level production in rolling horizon assembly environments
-
Simpson N.C. Multiple level production in rolling horizon assembly environments. European Journal of Operational Research. 114:1999;15-28.
-
(1999)
European Journal of Operational Research
, vol.114
, pp. 15-28
-
-
Simpson, N.C.1
-
19
-
-
0033886730
-
Improved rolling schedules for the dynamic single-level lot-sizing problem
-
Stadtler H. Improved rolling schedules for the dynamic single-level lot-sizing problem. Management Science. 46:2000;318-326.
-
(2000)
Management Science
, vol.46
, pp. 318-326
-
-
Stadtler, H.1
-
20
-
-
0001962762
-
Dynamic version of the economic lot size model
-
Wagner H.M., Whitin T.M. Dynamic version of the economic lot size model. Management Science. 5:1958;89-96.
-
(1958)
Management Science
, vol.5
, pp. 89-96
-
-
Wagner, H.M.1
Whitin, T.M.2
|