메뉴 건너뛰기




Volumn 44, Issue 15, 2006, Pages 3147-3158

New expression of scheduling performance measures

Author keywords

Performance measures; Scheduling; Shop floor control

Indexed keywords

ALGORITHMS; JOB ANALYSIS; PERFORMANCE; PRODUCTION CONTROL; SCHEDULING;

EID: 33745140200     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540500469628     Document Type: Article
Times cited : (2)

References (23)
  • 1
    • 0030784108 scopus 로고    scopus 로고
    • Control policies for multi-product multi-stage manufacturing systems: An experimental approach
    • Arain, M. and Altiok, T., Control policies for multi-product multi-stage manufacturing systems: an experimental approach. Int. J. Prod. Res., 1997, 35(1), 201-223.
    • (1997) Int. J. Prod. Res. , vol.35 , Issue.1 , pp. 201-223
    • Arain, M.1    Altiok, T.2
  • 2
    • 0021496929 scopus 로고
    • Sequencing rules and due-date assignments in a job shop
    • Baker, K.R., Sequencing rules and due-date assignments in a job shop. Manage. Sci., 1984, 30, 1093-1104.
    • (1984) Manage. Sci. , vol.30 , pp. 1093-1104
    • Baker, K.R.1
  • 3
    • 0000229534 scopus 로고
    • Matching up scheduling with multiple resources, release dates and disruptions
    • Bean, J., Birge, J.R., Mittenthal, J. and Noon, C.E., Matching up scheduling with multiple resources, release dates and disruptions. Op. Res., 1991, 39(3), 470-483.
    • (1991) Op. Res. , vol.39 , Issue.3 , pp. 470-483
    • Bean, J.1    Birge, J.R.2    Mittenthal, J.3    Noon, C.E.4
  • 4
    • 0020013653 scopus 로고
    • A state-of-the-art survey of dispatching rules for manufacturing job shop operations
    • Blackstone, J.H., Phillips, D.T. and Hogg, G.L., A state-of-the-art survey of dispatching rules for manufacturing job shop operations. Int. J. Prod. Res., 1982, 20, 27-45.
    • (1982) Int. J. Prod. Res. , vol.20 , pp. 27-45
    • Blackstone, J.H.1    Phillips, D.T.2    Hogg, G.L.3
  • 5
    • 0025555793 scopus 로고
    • Reacting to scheduling exceptions in FMS environments
    • Dutta, A., Reacting to scheduling exceptions in FMS environments. IIE Trans., 1990, 22(4), 300-314.
    • (1990) IIE Trans. , vol.22 , Issue.4 , pp. 300-314
    • Dutta, A.1
  • 7
    • 0024480465 scopus 로고
    • Hierarchical flow control: A framework for scheduling and planning discrete events in manufacturing systems
    • Gershwin, S.B., Hierarchical flow control: a framework for scheduling and planning discrete events in manufacturing systems. Proceedings of the IEEE, 1989, 77(1), 195-209.
    • (1989) Proceedings of the IEEE , vol.77 , Issue.1 , pp. 195-209
    • Gershwin, S.B.1
  • 9
    • 0019585243 scopus 로고
    • A review of production scheduling
    • Graves, S.C., A review of production scheduling. Op. Res., 1981, 29, 646-675.
    • (1981) Op. Res. , vol.29 , pp. 646-675
    • Graves, S.C.1
  • 10
    • 34249973653 scopus 로고
    • A survey of priority rule-based scheduling
    • Haupt, R., A survey of priority rule-based scheduling. OR Spektrum, 1989, 11, 3-16.
    • (1989) OR Spektrum , vol.11 , pp. 3-16
    • Haupt, R.1
  • 11
    • 0031076549 scopus 로고    scopus 로고
    • Improving job shop performance by coordinating dispatching rules
    • Holthaus, O. and Ziegler, H., Improving job shop performance by coordinating dispatching rules. Im. J. Prod. Res., 1997, 35(2), 539-549.
    • (1997) Im. J. Prod. Res. , vol.35 , Issue.2 , pp. 539-549
    • Holthaus, O.1    Ziegler, H.2
  • 12
    • 0028499648 scopus 로고
    • Robustness measures and robust scheduling for job shops
    • Leon, V.J., Wu, S.D. and Storer, R.H., Robustness measures and robust scheduling for job shops. IIE Trans., 1994, 26, 32-43.
    • (1994) IIE Trans. , vol.26 , pp. 32-43
    • Leon, V.J.1    Wu, S.D.2    Storer, R.H.3
  • 14
    • 0000107307 scopus 로고
    • Characterising the manufacturing scheduling problem
    • Parunak, H.V.D., Characterising the manufacturing scheduling problem. J. Manuf. Syst., 1991, 10, 241-259.
    • (1991) J. Manuf. Syst. , vol.10 , pp. 241-259
    • Parunak, H.V.D.1
  • 16
    • 0000580617 scopus 로고
    • A price-directed approach to real-time scheduling of production operations
    • Roundy, R.O., Maxwell, W.L., Herer, Y.T., Tayur, S.R. and Getzler, A.W., A price-directed approach to real-time scheduling of production operations. IIE Trans., 1991, 23(2), 149-160.
    • (1991) IIE Trans. , vol.23 , Issue.2 , pp. 149-160
    • Roundy, R.O.1    Maxwell, W.L.2    Herer, Y.T.3    Tayur, S.R.4    Getzler, A.W.5
  • 17
    • 0023437076 scopus 로고
    • A comparative analysis of the COVERT job sequencing rule using various shop performance measures
    • Russell, R.S., Dar-El, E.M. and Taylor, B.W., A comparative analysis of the COVERT job sequencing rule using various shop performance measures. Int. J. Prod. Res., 1987, 25, 1523-1540.
    • (1987) Int. J. Prod. Res. , vol.25 , pp. 1523-1540
    • Russell, R.S.1    Dar-El, E.M.2    Taylor, B.W.3
  • 18
    • 0034326104 scopus 로고    scopus 로고
    • Analysis of reactive scheduling problems in a job shop environment
    • Sabuncuoglu, I. and Bayiz, M., Analysis of reactive scheduling problems in a job shop environment. Euro. J. Op. Res., 2000, 126, 567-586.
    • (2000) Euro. J. Op. Res. , vol.126 , pp. 567-586
    • Sabuncuoglu, I.1    Bayiz, M.2
  • 19
    • 0343963100 scopus 로고    scopus 로고
    • Scheduling with limited machine availability
    • Schmidt, G., Scheduling with limited machine availability. Euro. J. Op. Res., 2000, 121, 1-15.
    • (2000) Euro. J. Op. Res. , vol.121 , pp. 1-15
    • Schmidt, G.1
  • 21
    • 0020717649 scopus 로고
    • A branch and bound procedure to solve a bi-criterion scheduling problem
    • Sen, T. and Gupta, S.K., A branch and bound procedure to solve a bi-criterion scheduling problem. IIE Trans., 1983, 15, 84-88.
    • (1983) IIE Trans. , vol.15 , pp. 84-88
    • Sen, T.1    Gupta, S.K.2
  • 22
    • 0001872156 scopus 로고
    • Production planning and scheduling in CIM
    • Solberg, J.J., Production planning and scheduling in CIM. Inform. Process., 1989, 89, 919-925.
    • (1989) Inform. Process. , vol.89 , pp. 919-925
    • Solberg, J.J.1
  • 23
    • 0022097890 scopus 로고
    • Scheduling in the manufacturing operating system environment
    • Yamamoto, M. and Nof, S.Y., Scheduling in the manufacturing operating system environment. Int. J. Prod. Res., 1985, 23(4), 705-722.
    • (1985) Int. J. Prod. Res. , vol.23 , Issue.4 , pp. 705-722
    • Yamamoto, M.1    Nof, S.Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.