-
1
-
-
0029462583
-
Steel scheduling optimization for IPSCO's rolling mill and reheat furnace
-
New York: IEEE
-
ASSAF, I., M. CHEN and J. KATZBERG (1995) Steel scheduling optimization for IPSCO's rolling mill and reheat furnace, WESCANEX '95 Proceedings, New York: IEEE, 294-299.
-
(1995)
WESCANEX '95 Proceedings
, pp. 294-299
-
-
Assaf, I.1
Chen, M.2
Katzberg, J.3
-
2
-
-
0012601112
-
Constraint satisfaction approach to scheduling DHCR process
-
New York: IEEE
-
CHANG, S.Y., Y.S. HONG and C.Y. JUN (1993) Constraint satisfaction approach to scheduling DHCR process, CDC '93 Proceedings, New York: IEEE, 464-470.
-
(1993)
CDC '93 Proceedings
, pp. 464-470
-
-
Chang, S.Y.1
Hong, Y.S.2
Jun, C.Y.3
-
3
-
-
0038789162
-
A flexible decision support system for steel hot rolling mill scheduling
-
COWLING, P. (2003) A flexible decision support system for steel hot rolling mill scheduling, Computers and Industrial Engineering, 45, 307-321.
-
(2003)
Computers and Industrial Engineering
, vol.45
, pp. 307-321
-
-
Cowling, P.1
-
4
-
-
0141919583
-
A multi-agent architecture for dynamic scheduling of steel hot rolling
-
COWLING, P., D. OUELHADJ and S. PETROVIC (2003) A multi-agent architecture for dynamic scheduling of steel hot rolling, Journal of Intelligent Manufacturing, 14, 457-470.
-
(2003)
Journal of Intelligent Manufacturing
, vol.14
, pp. 457-470
-
-
Cowling, P.1
Ouelhadj, D.2
Petrovic, S.3
-
5
-
-
0030259058
-
Comparison of iterative improvement techniques for schedule optimisation
-
DORN, J., M. GIRSCH, G. SKELE and W. SLANY (1996) Comparison of iterative improvement techniques for schedule optimisation, European Journal of Operational Research, 94, 349-361.
-
(1996)
European Journal of Operational Research
, vol.94
, pp. 349-361
-
-
Dorn, J.1
Girsch, M.2
Skele, G.3
Slany, W.4
-
6
-
-
37949023929
-
Expert system for manufacturing sequence determination in hot rolling process of seamless steel pipe
-
FUKAYA, N. and T. KATAGIRI (1991) Expert system for manufacturing sequence determination in hot rolling process of seamless steel pipe, Kawasaki Steel Giho, 23(3), 191-196.
-
(1991)
Kawasaki Steel Giho
, vol.23
, Issue.3
, pp. 191-196
-
-
Fukaya, N.1
Katagiri, T.2
-
7
-
-
0029392162
-
Hybridizing a genetic algorithm with algorithm with rule-base reasoning for production planning
-
HAMADA, K., T. BABA, K. SATO and M. YUFU (1995) Hybridizing a genetic algorithm with algorithm with rule-base reasoning for production planning, IEEE Expert, 10, 60-67.
-
(1995)
IEEE Expert
, vol.10
, pp. 60-67
-
-
Hamada, K.1
Baba, T.2
Sato, K.3
Yufu, M.4
-
8
-
-
0035890549
-
A decomposition approach for the scheduling of a steel plant production
-
HARJUNKOSKI, I. and I.E. GROSSMANN (2001) A decomposition approach for the scheduling of a steel plant production, Computers and Chemical Engineering, 25, 1647-1660.
-
(2001)
Computers and Chemical Engineering
, vol.25
, pp. 1647-1660
-
-
Harjunkoski, I.1
Grossmann, I.E.2
-
9
-
-
0030102183
-
Primary production scheduling at steelmaking industries
-
LEE, H.S., S.S. MURTHY, S.W. HAIDER and D.V. MORSE (1996) Primary production scheduling at steelmaking industries, IBM Journal of Research and Development, 40, 231-252.
-
(1996)
IBM Journal of Research and Development
, vol.40
, pp. 231-252
-
-
Lee, H.S.1
Murthy, S.S.2
Haider, S.W.3
Morse, D.V.4
-
10
-
-
0032049311
-
The hot strip mill production scheduling problem; a tabu search approach
-
LOPEZ, L., M.W. CARTER and M. GENDREAU (1998) The hot strip mill production scheduling problem; a tabu search approach, European Journal of Operational Research, 106, 317-335.
-
(1998)
European Journal of Operational Research
, vol.106
, pp. 317-335
-
-
Lopez, L.1
Carter, M.W.2
Gendreau, M.3
-
11
-
-
0142248195
-
Mathematical modeling and optimization strategies (genetic algorithm and knowledge base) applied to the continuous casting of steel
-
SANTOS, C.A., J.A. SPIM and A. GARCIA (2003) Mathematical modeling and optimization strategies (genetic algorithm and knowledge base) applied to the continuous casting of steel, Engineering Applications of Artificial Intelligence, 16, 511-527.
-
(2003)
Engineering Applications of Artificial Intelligence
, vol.16
, pp. 511-527
-
-
Santos, C.A.1
Spim, J.A.2
Garcia, A.3
-
13
-
-
0032000378
-
Evaluation on ordering strategies for constraint satisfaction reactive scheduling
-
SUM, M.S., A. LEE, Y.J. LEE and K.Y. Ko (1998) Evaluation on ordering strategies for constraint satisfaction reactive scheduling, Decision Support Systems, 22, 187-197.
-
(1998)
Decision Support Systems
, vol.22
, pp. 187-197
-
-
Sum, M.S.1
Lee, A.2
Lee, Y.J.3
Ko, K.Y.4
-
14
-
-
85002949113
-
Synchronized scheduling method in manufacturing steel sheets
-
TAMARU, R., M. NAGAI, Y. NAKAGAWA, T. TANIZAKI and H. NAKAJIMA (1998) Synchronized scheduling method in manufacturing steel sheets, International Transactions on Operational Research, 5 (3), 189-199.
-
(1998)
International Transactions on Operational Research
, vol.5
, Issue.3
, pp. 189-199
-
-
Tamaru, R.1
Nagai, M.2
Nakagawa, Y.3
Tanizaki, T.4
Nakajima, H.5
-
15
-
-
4744366066
-
Research on hot-rolling scheduling for tube production
-
TANG, L.X., G.F. ZHANG, Z.H. YANG and M.G. WANG (1999) Research on hot-rolling scheduling for tube production, Chinese Journal of Iron and Steel, 34 (4), 73-76.
-
(1999)
Chinese Journal of Iron and Steel
, vol.34
, Issue.4
, pp. 73-76
-
-
Tang, L.X.1
Zhang, G.F.2
Yang, Z.H.3
Wang, M.G.4
-
16
-
-
0033741404
-
A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron & Steel Complex
-
TANG, L.X., J.Y. LIU, A.Y. RONG and Z.H. YANG (2000) A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron & Steel Complex, European Journal of Operational Research, 124, 267-282.
-
(2000)
European Journal of Operational Research
, vol.124
, pp. 267-282
-
-
Tang, L.X.1
Liu, J.Y.2
Rong, A.Y.3
Yang, Z.H.4
|