메뉴 건너뛰기




Volumn 23, Issue 3, 2006, Pages 145-158

A case of rule-based heuristics for scheduling hot rolling seamless steel tube production

Author keywords

Heuristics; Hot rolling seamless steel tube production; Scheduling

Indexed keywords

COMPUTATIONAL COMPLEXITY; HOT ROLLING; OPTIMIZATION; SCHEDULING; STEEL; TUBES (COMPONENTS);

EID: 33744963420     PISSN: 02664720     EISSN: 14680394     Source Type: Journal    
DOI: 10.1111/j.1468-0394.2006.00330.x     Document Type: Article
Times cited : (11)

References (16)
  • 1
    • 0029462583 scopus 로고
    • Steel scheduling optimization for IPSCO's rolling mill and reheat furnace
    • New York: IEEE
    • ASSAF, I., M. CHEN and J. KATZBERG (1995) Steel scheduling optimization for IPSCO's rolling mill and reheat furnace, WESCANEX '95 Proceedings, New York: IEEE, 294-299.
    • (1995) WESCANEX '95 Proceedings , pp. 294-299
    • Assaf, I.1    Chen, M.2    Katzberg, J.3
  • 2
    • 0012601112 scopus 로고
    • Constraint satisfaction approach to scheduling DHCR process
    • New York: IEEE
    • CHANG, S.Y., Y.S. HONG and C.Y. JUN (1993) Constraint satisfaction approach to scheduling DHCR process, CDC '93 Proceedings, New York: IEEE, 464-470.
    • (1993) CDC '93 Proceedings , pp. 464-470
    • Chang, S.Y.1    Hong, Y.S.2    Jun, C.Y.3
  • 3
    • 0038789162 scopus 로고    scopus 로고
    • A flexible decision support system for steel hot rolling mill scheduling
    • COWLING, P. (2003) A flexible decision support system for steel hot rolling mill scheduling, Computers and Industrial Engineering, 45, 307-321.
    • (2003) Computers and Industrial Engineering , vol.45 , pp. 307-321
    • Cowling, P.1
  • 4
  • 6
    • 37949023929 scopus 로고
    • Expert system for manufacturing sequence determination in hot rolling process of seamless steel pipe
    • FUKAYA, N. and T. KATAGIRI (1991) Expert system for manufacturing sequence determination in hot rolling process of seamless steel pipe, Kawasaki Steel Giho, 23(3), 191-196.
    • (1991) Kawasaki Steel Giho , vol.23 , Issue.3 , pp. 191-196
    • Fukaya, N.1    Katagiri, T.2
  • 7
    • 0029392162 scopus 로고
    • Hybridizing a genetic algorithm with algorithm with rule-base reasoning for production planning
    • HAMADA, K., T. BABA, K. SATO and M. YUFU (1995) Hybridizing a genetic algorithm with algorithm with rule-base reasoning for production planning, IEEE Expert, 10, 60-67.
    • (1995) IEEE Expert , vol.10 , pp. 60-67
    • Hamada, K.1    Baba, T.2    Sato, K.3    Yufu, M.4
  • 8
    • 0035890549 scopus 로고    scopus 로고
    • A decomposition approach for the scheduling of a steel plant production
    • HARJUNKOSKI, I. and I.E. GROSSMANN (2001) A decomposition approach for the scheduling of a steel plant production, Computers and Chemical Engineering, 25, 1647-1660.
    • (2001) Computers and Chemical Engineering , vol.25 , pp. 1647-1660
    • Harjunkoski, I.1    Grossmann, I.E.2
  • 10
  • 11
    • 0142248195 scopus 로고    scopus 로고
    • Mathematical modeling and optimization strategies (genetic algorithm and knowledge base) applied to the continuous casting of steel
    • SANTOS, C.A., J.A. SPIM and A. GARCIA (2003) Mathematical modeling and optimization strategies (genetic algorithm and knowledge base) applied to the continuous casting of steel, Engineering Applications of Artificial Intelligence, 16, 511-527.
    • (2003) Engineering Applications of Artificial Intelligence , vol.16 , pp. 511-527
    • Santos, C.A.1    Spim, J.A.2    Garcia, A.3
  • 13
    • 0032000378 scopus 로고    scopus 로고
    • Evaluation on ordering strategies for constraint satisfaction reactive scheduling
    • SUM, M.S., A. LEE, Y.J. LEE and K.Y. Ko (1998) Evaluation on ordering strategies for constraint satisfaction reactive scheduling, Decision Support Systems, 22, 187-197.
    • (1998) Decision Support Systems , vol.22 , pp. 187-197
    • Sum, M.S.1    Lee, A.2    Lee, Y.J.3    Ko, K.Y.4
  • 16
    • 0033741404 scopus 로고    scopus 로고
    • A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron & Steel Complex
    • TANG, L.X., J.Y. LIU, A.Y. RONG and Z.H. YANG (2000) A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron & Steel Complex, European Journal of Operational Research, 124, 267-282.
    • (2000) European Journal of Operational Research , vol.124 , pp. 267-282
    • Tang, L.X.1    Liu, J.Y.2    Rong, A.Y.3    Yang, Z.H.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.