Volumn 132, Issue 5, 2006, Pages 452-464

Reliability and stability buffering approach: Focusing on the issues of errors and changes in concurrent design and construction projects

Author keywords

Change management; Fast track construction; Scheduling; Simulation

Indexed keywords

CHANGE MANAGEMENT; CIVIL INFRASTRUCTURE PROJECTS; FAST TRACK CONSTRUCTION; STRATEGIC UTILIZATION;

EID: 33646192032     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2006)132:5(452)     Document Type: Article
Times cited : (42)

References (29)
  • 4
    • 1642563373 scopus 로고
    • Toward construction JIT
    • Ballard, G., and Howell, G. (1995). " Toward construction JIT.. " 11th Annual ARCOM Conf., Association of Researchers in Construction Management (ARCOM).
    • (1995) 11th Annual ARCOM Conf.
    • Ballard, G.1    Howell, G.2
  • 6
    • 33646189600 scopus 로고    scopus 로고
    • Construction modeling and buffer management with integrated production scheduler
    • Chou, D., and Shen, L. (2001). " Construction modeling and buffer management with integrated production scheduler.. " Int. Group of Lean Construction 9th Annual Conf., IGLC.
    • (2001) Int. Group of Lean Construction 9th Annual Conf.
    • Chou, D.1    Shen, L.2
  • 7
    • 83755202997 scopus 로고
    • Naval ship production: A claim settled and a framework built
    • Cooper, K. (1980). " Naval ship production: A claim settled and a framework built.. " Interfaces, 10 6, 20-36.
    • (1980) Interfaces , vol.10 , Issue.6 , pp. 20-36
    • Cooper, K.1
  • 9
    • 33646170633 scopus 로고
    • Overlapping product development activities by analysis of information transfer practice
    • MIT, Cambridge, Mass.
    • Eppinger, S., and Krishnan, V. (1992). " Overlapping product development activities by analysis of information transfer practice.. " Working Paper 3478-92, Sloan School of Management, MIT, Cambridge, Mass.
    • (1992) Working Paper 3478-92
    • Eppinger, S.1    Krishnan, V.2
  • 10
    • 0002132859 scopus 로고    scopus 로고
    • Dynamic modeling of product development processes
    • Ford, D., and Sterman, J. (1998). " Dynamic modeling of product development processes.. " Syst. Dyn. Rev., 14 (1), 31-68.
    • (1998) Syst. Dyn. Rev. , vol.14 , Issue.1 , pp. 31-68
    • Ford, D.1    Sterman, J.2
  • 11
    • 0242301115 scopus 로고    scopus 로고
    • Overcoming the 90% syndrome: Iteration management in concurrent development projects
    • Ford, D., and Sterman, J. (2003). " Overcoming the 90% syndrome: Iteration management in concurrent development projects.. " Concurr. Eng. Res. Appl., 111 (3), 177-186.
    • (2003) Concurr. Eng. Res. Appl. , vol.111 , Issue.3 , pp. 177-186
    • Ford, D.1    Sterman, J.2
  • 12
    • 0003926816 scopus 로고    scopus 로고
    • North River Press, Great Barrington, Mass.
    • Goldratt, E. M. (1997). Critical chain, North River Press, Great Barrington, Mass.
    • (1997) Critical Chain
    • Goldratt, E.M.1
  • 13
    • 13944271969 scopus 로고    scopus 로고
    • Process dynamics: Identifying a strategy for the deployment of buffers in building projects
    • Horman, M., and Kenley, R. (1998). " Process dynamics: Identifying a strategy for the deployment of buffers in building projects.. " Int. J. Logistics: Res. Appl., 1 (3), 221-237.
    • (1998) Int. J. Logistics: Res. Appl. , vol.1 , Issue.3 , pp. 221-237
    • Horman, M.1    Kenley, R.2
  • 15
    • 0027805668 scopus 로고
    • Interaction between subcycles: One key to improved methods
    • Howell, G., Laufer, A., and Ballard, G. (1993). " Interaction between subcycles: One key to improved methods.. " J. Constr. Eng. Manage., 119 (4), 714-728.
    • (1993) J. Constr. Eng. Manage. , vol.119 , Issue.4 , pp. 714-728
    • Howell, G.1    Laufer, A.2    Ballard, G.3
  • 17
    • 27644479236 scopus 로고    scopus 로고
    • Dynamic quality and change management framework for concurrent design and construction
    • Reston, Va. (electronic book).
    • Lee, S., Pea-Mora, F., and Park, M. (2003a). " Dynamic quality and change management framework for concurrent design and construction.. " ASCE Construction Research Congress, Reston, Va., (electronic book).
    • (2003) ASCE Construction Research Congress
    • Lee, S.1    Pea-Mora, F.2    Park, M.3
  • 18
    • 25444435990 scopus 로고    scopus 로고
    • Quality and change management model for large scale concurrent design and construction projects
    • Lee, S., Pea-Mora, F., and Park, M. (2005). " Quality and change management model for large scale concurrent design and construction projects.. " J. Constr. Eng. Manage., 131 (8), 890-902.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.8 , pp. 890-902
    • Lee, S.1    Pea-Mora, F.2    Park, M.3
  • 19
    • 0001446357 scopus 로고    scopus 로고
    • Strategic management of complex projects: A case study using system dynamics
    • Lyneis, J., Cooper, K., and Els, S. (2001). " Strategic management of complex projects: A case study using system dynamics.. " Syst. Dyn. Rev., 17 (3), 237-260.
    • (2001) Syst. Dyn. Rev. , vol.17 , Issue.3 , pp. 237-260
    • Lyneis, J.1    Cooper, K.2    Els, S.3
  • 20
    • 0142025004 scopus 로고    scopus 로고
    • Dynamic change management for construction: Introducing change cycle into model-based project management
    • Park, M., and Pea-Mora, F. (2003). " Dynamic change management for construction: Introducing change cycle into model-based project management.. " Syst. Dyn. Rev., 19 (3), 213-242.
    • (2003) Syst. Dyn. Rev. , vol.19 , Issue.3 , pp. 213-242
    • Park, M.1    Pea-Mora, F.2
  • 21
    • 13944281790 scopus 로고    scopus 로고
    • Reliability buffering for construction projects
    • Park, M., and Pea-Mora, F. (2004). " Reliability buffering for construction projects.. " J. Constr. Eng. Manage., 130 (5), 626-637.
    • (2004) J. Constr. Eng. Manage. , vol.130 , Issue.5 , pp. 626-637
    • Park, M.1    Pea-Mora, F.2
  • 22
    • 17244362051 scopus 로고    scopus 로고
    • Dynamic planning and control methodology for design-build fast-track construction projects
    • Pea-Mora, F., and Li, M. (2001). " Dynamic planning and control methodology for design-build fast-track construction projects.. " J. Constr. Eng. Manage., 127 (1), 1-17.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.1 , pp. 1-17
    • Pea-Mora, F.1    Li, M.2
  • 24
    • 0031672864 scopus 로고    scopus 로고
    • System dynamics in project management: Assessing the impacts of client behavior on project performance
    • Rodrigues, A., and Williams, T. (1998). " System dynamics in project management: Assessing the impacts of client behavior on project performance.. " J. Oper. Res. Soc., 49 (1), 2-15.
    • (1998) J. Oper. Res. Soc. , vol.49 , Issue.1 , pp. 2-15
    • Rodrigues, A.1    Williams, T.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.