메뉴 건너뛰기




Volumn 6, Issue 2, 2005, Pages 195-207

Technological progress and the productive efficiency of construction firms in Hong Kong, 1981-2001

Author keywords

Catching up process; Construction firms; Data envelopment analysis; Hong kong; Productive efficiency; Subcontracting

Indexed keywords

CATCHING-UP PROCESS; CONSTRUCTION FIRMS; DATA ENVELOPMENT ANALYSIS (DEA); PRODUCTIVE EFFICIENCY;

EID: 33645524685     PISSN: 16099451     EISSN: None     Source Type: Journal    
DOI: 10.1142/S1609945105000390     Document Type: Article
Times cited : (25)

References (29)
  • 3
    • 2942667099 scopus 로고
    • On the estimation of the price trend and output growth rate of the Hong Kong construction industry
    • Chau, KW (1990). On the estimation of the price trend and output growth rate of the Hong Kong construction industry. Journal of Real Estate & Construction, 1(1), 46-59.
    • (1990) Journal of Real Estate & Construction , vol.1 , Issue.1 , pp. 46-59
    • Chau, K.W.1
  • 4
    • 0005731132 scopus 로고
    • Estimating industry-level productivity trends in the building industry from building cost and price data
    • Chau, KW (1993). Estimating industry-level productivity trends in the building industry from building cost and price data. Construction Management and Economics, 11(4), 370-383.
    • (1993) Construction Management and Economics , vol.11 , Issue.4 , pp. 370-383
    • Chau, K.W.1
  • 5
    • 84993054008 scopus 로고    scopus 로고
    • The implications of the difference in the growth rates of the prices of building resources and outputs in Hong Kong
    • Chau, KW (1998). The implications of the difference in the growth rates of the prices of building resources and outputs in Hong Kong. Engineering, Construction and Architectural Management, 5, 4.
    • (1998) Engineering, Construction and Architectural Management , vol.5 , pp. 4
    • Chau, K.W.1
  • 7
    • 33645517157 scopus 로고    scopus 로고
    • The economics of procurement methods - With special reference to public housing projects in Hong Kong
    • University of Natal, Durban, South Africa, January
    • Chau, KW, HF Leung and DCW Ho (1996). The economics of procurement methods - With special reference to public housing projects in Hong Kong. Proceedings of the W92 CIB International Symposium on Procurement Systems, University of Natal, Durban, South Africa, January.
    • (1996) Proceedings of the W92 CIB International Symposium on Procurement Systems
    • Chau, K.W.1    Leung, H.F.2    Ho, D.C.W.3
  • 8
    • 0005400256 scopus 로고
    • The measurement of total factor productivity of the Hong Kong construction industry
    • Chau, KW and A Walker (1988). The measurement of total factor productivity of the Hong Kong construction industry. Construction Management and Economics, 6(3), 209-224.
    • (1988) Construction Management and Economics , vol.6 , Issue.3 , pp. 209-224
    • Chau, K.W.1    Walker, A.2
  • 11
    • 8644230361 scopus 로고
    • Institutional costs and the nature of subcontracting in the construction industry
    • University of Natal, Durban, South Africa, January
    • Chau, KW and A Walker (1994b). Institutional costs and the nature of subcontracting in the construction industry. Proceedings of the W92 CIB International Symposium on Procurement System, University of Natal, Durban, South Africa, January.
    • (1994) Proceedings of the W92 CIB International Symposium on Procurement System
    • Chau, K.W.1    Walker, A.2
  • 12
    • 0033924268 scopus 로고    scopus 로고
    • Catching-up of Japanese with German industries: Production, infrastructure, and R&D
    • Conrad and Wastl (2000). Catching-up of Japanese with German industries: Production, Infrastructure, and R&D. Pacific Economic Review, 5(2), 135-155.
    • (2000) Pacific Economic Review , vol.5 , Issue.2 , pp. 135-155
    • Conrad1    Wastl2
  • 13
    • 0000118585 scopus 로고    scopus 로고
    • Flexibility, labor subcontracting and HRM in the construction industry in Singapore: Can the system be refined?
    • Debrah, YA and G Ofori (1997). Flexibility, labor subcontracting and HRM in the construction industry in Singapore: Can the system be refined? International Journal of Human Resource Management, 8(5), 690-709.
    • (1997) International Journal of Human Resource Management , vol.8 , Issue.5 , pp. 690-709
    • Debrah, Y.A.1    Ofori, G.2
  • 14
    • 0000415747 scopus 로고
    • Bureaucratic and craft administration revisited: The impact of market structure on the nature of the construction firm
    • Eccles, RG (1981a). Bureaucratic and craft administration revisited: The impact of market structure on the nature of the construction firm. Administrative Science Quarterly, 26, 449-469.
    • (1981) Administrative Science Quarterly , vol.26 , pp. 449-469
    • Eccles, R.G.1
  • 17
    • 33645530982 scopus 로고
    • Managing the new global enterprise
    • Feiger, GM (1988). Managing the new global enterprise. McKinsey Quarterly, 25-38.
    • (1988) McKinsey Quarterly , pp. 25-38
    • Feiger, G.M.1
  • 19
    • 33645519126 scopus 로고    scopus 로고
    • Contracting out (Subcontractors in the construction industry)
    • Houston, K (1996). Contracting out (Subcontractors in the construction industry). CA Magazine, 100, 52-53.
    • (1996) CA Magazine , vol.100 , pp. 52-53
    • Houston, K.1
  • 22
    • 38249017915 scopus 로고
    • Largest size-efficient scale and size efficiencies of decision-making units in data, envelopment analysis
    • Maindiratta, A (1990) Largest size-efficient scale and size efficiencies of decision-making units in data, envelopment analysis. Journal of Econometrics, 46, 57-72.
    • (1990) Journal of Econometrics , vol.46 , pp. 57-72
    • Maindiratta, A.1
  • 23
    • 0001844017 scopus 로고    scopus 로고
    • The evolution of Japanese subcontracting
    • Nishiguchi, T and J Brookfield (1997). The evolution of Japanese subcontracting. Sloan Management Review, 39(1), 89-101.
    • (1997) Sloan Management Review , vol.39 , Issue.1 , pp. 89-101
    • Nishiguchi, T.1    Brookfield, J.2
  • 25
    • 0006514219 scopus 로고
    • Catching-up from the way behind - A third world perspective on first world history
    • Fagerberg, J, Verspagen, B and Tunzelmann, N (eds.), E. Elgar pub. Co.: Aldershot, Hants
    • Reinert, ES (1994). Catching-up from the way behind - A third world perspective on first world history. In The Dynamics of Technology, Trade and Growth, Fagerberg, J, Verspagen, B and Tunzelmann, N (eds.), E. Elgar pub. Co.: Aldershot, Hants.
    • (1994) The Dynamics of Technology, Trade and Growth
    • Reinert, E.S.1
  • 27
    • 33645513676 scopus 로고    scopus 로고
    • Subcontracting - An alternative employment option
    • Tregaskis, O (1997). Subcontracting - An alternative employment option. Flexible Working, 2(3), 24-27.
    • (1997) Flexible Working , vol.2 , Issue.3 , pp. 24-27
    • Tregaskis, O.1
  • 28
    • 0000095552 scopus 로고
    • A heteroskedasticity-consistent covariance matrix and a direct test for heteroskedasticity
    • White, H (1980). A heteroskedasticity-consistent covariance matrix and a direct test for heteroskedasticity. Econometrica, 48, 817-838.
    • (1980) Econometrica , vol.48 , pp. 817-838
    • White, H.1
  • 29
    • 84948890856 scopus 로고
    • The construction firm and the construction project: A transaction cost approach
    • Winch, G (1989). The construction firm and the construction project: A transaction cost approach. Construction Management and Economics, 7, 331-345.
    • (1989) Construction Management and Economics , vol.7 , pp. 331-345
    • Winch, G.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.