메뉴 건너뛰기




Volumn 40, Issue 3, 1998, Pages 31-35

A review of methods to estimate haul fleet production

Author keywords

[No Author keywords available]

Indexed keywords

CONSTRUCTION EQUIPMENT; EARTHMOVING MACHINERY; FLEET OPERATIONS; MATHEMATICAL MODELS; OPTIMIZATION; PROJECT MANAGEMENT; STATISTICAL METHODS; TIME AND MOTION STUDY;

EID: 0032026375     PISSN: 02749696     EISSN: None     Source Type: Trade Journal    
DOI: None     Document Type: Article
Times cited : (5)

References (12)
  • 1
    • 0016928612 scopus 로고    scopus 로고
    • Modeling Method-Productivity
    • (CO1 1976) proceedings paper 11983
    • Adrian, J.J., and L.T. Boyer. Modeling Method-Productivity. Journal of the Construction Division 102 (CO1 1976) proceedings paper 11983: 157-168.
    • Journal of the Construction Division , vol.102 , pp. 157-168
    • Adrian, J.J.1    Boyer, L.T.2
  • 3
    • 0016587576 scopus 로고    scopus 로고
    • Optimum Size of Hauling Units
    • (CO4 1975) proceedings Paper 11771
    • Gates, M., and A. Scarpa. Optimum Size of Hauling Units. Journal of the Construction Division 101 (CO4 1975) proceedings Paper 11771: 853-860.
    • Journal of the Construction Division , vol.101 , pp. 853-860
    • Gates, M.1    Scarpa, A.2
  • 4
    • 0344494308 scopus 로고    scopus 로고
    • Optimizing Haul Unit Size and Number Based on Loading Facility Characteristics
    • (March 1996) proceedings paper 11713
    • Gransberg, D.D. Optimizing Haul Unit Size and Number Based on Loading Facility Characteristics. Journal of Construction Engineering and Management 122 (March 1996) proceedings paper 11713: 248-253.
    • Journal of Construction Engineering and Management , vol.122 , pp. 248-253
    • Gransberg, D.D.1
  • 5
    • 5244363680 scopus 로고    scopus 로고
    • Optimizing Haul Fleet Size Using Queuing Theory
    • (CO1 1968) proceedings paper 5753
    • Griffis, F.H. Optimizing Haul Fleet Size Using Queuing Theory. Journal of the Construction Division 94 (CO1 1968) proceedings paper 5753: 75-88.
    • Journal of the Construction Division , vol.94 , pp. 75-88
    • Griffis, F.H.1
  • 9
    • 0016519334 scopus 로고
    • Fifty Years of Construction Cost-Reducing Analyses
    • CO2
    • Peurifoy, R.L. Fifty Years of Construction Cost-Reducing Analyses. Journal of the Construction Division 101 (CO2 1975): 307.
    • (1975) Journal of the Construction Division , vol.101 , pp. 307
    • Peurifoy, R.L.1
  • 10
    • 11344270541 scopus 로고
    • Working paper, Oregon State University
    • Phelps, R.E. Equipment Costs. Working paper, Oregon State University, 1977.
    • (1977) Equipment Costs
    • Phelps, R.E.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.